ML17263A297
| ML17263A297 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/18/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17263A299 | List: |
| References | |
| NUDOCS 9305250053 | |
| Download: ML17263A297 (6) | |
See also: IR 05000244/1993002
Text
FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9305250053
DOC.DATE: 93/05/18
NOTARIZED:
NO
DOCKET
N
SCIL:50-244 Robert
Emmet Ginna Nuclear Plant, Unit 1, Rochester
G
05000244
UTH.NAME
AUTHOR AFFILIATION
URRgJ.P.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
MECREDY,R.C.
Rochester
Gas
& Electric Corp.
SUBJECT:
Forwards inservice
insp program
&
SG eddy current insp rept
50-244/93-02
on 930323-27.No violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt).-Insp Rept/Notice of Violation Response
NOTES:License
Exp date in accordance
with 10CFR2,2.109(9/19/72).
05000244
S/
F
INTERNAL:
RECIPIENT
ID CODE/NAME
PDl-3
AEOD/DEIB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS1
MORISSEAUED
EXTERNAL
EG&G/BRYCE E J
~ H ~
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPI'ENT
ID CODE/NAME
JOHNSON,A
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE DIR
REG ~ILE
02
R'GN1
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1.
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS
PLEASE HELP- US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOhI P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21
ENCL
21
Docket No. 50-244
Dr. Robert C. Mecredy
Vice President,
Ginna Nuclear Production
Rochester Gas.and Electric Corporation
89 East Avenue
Rochester,
New York 14649
Dear Dr. Mecredy:
SUBJECT:
INSERVICE INSPECTION PROGRAM AND STEAM GENERATOR EDDY
CURRENT EXAMINATION- R. E. GINNA NUCLEAR POWER PLANT
REGION I INSPECTION REPORT NO. 50-244/93-02
This letter forwards the results of an inspection intended to promote public health and safety
conducted by Mr. P. Patnaik of this office, March 23 - 27, 1993, at the R. E. Ginna Nuclear
power plant, Ontario, New York. Mr. Patnaik discussed
the findings with your staff on
March 27, 1993, at the conclusion of the inspection.
This inspection included observations
of nondestructive testing, component fabrication in progress,
a review of the inservice
inspection program for the reactor coolant system and the eddy current examination of steam
generator tubes.
These are all important aspects of maintaining pressure boundary integrity.
Within these areas,
the inspection consisted of selective examinations of procedures
and
representative
records, interviews with personnel and observations by the inspector.
Within
the scope of the inspection, no violations were observed.
No response to this letter is
required.
Your cooperation with us is appreciated.
Sincerely,
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
OFFICIALRECORD COPY
A:GIN9302.INS
Enclosure:
NRC Region I Inspection Report
No. 50-244/93-02
.
9'305250053
9'305i8
ADQCK 05000244
6
NNx8 F93
t
~
~
Dr. Robert C. Mecredy
cc w/encl:
R. Smith, Senior Vice President, Production and Engineering
Central Records (4 copies)
Director, Energy and Water Division
State of New York, Department of Law
N. Reynolds, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K..Abraham, PAO (2) AllInspection Reports
NRC Resident Inspector
State of New,York, SLO Designee
bcc w/encl:
Region I Docket Room (with concurrences)
bcc w/encl (VIAE-NIAIL):
V. McCree, OEDO
0
W. Butler, NRR
J. Durr, DRS
H. Gray, DRS
P. Patniak, DRS
RI:DRS
RI:DRS
atniak/ms/dmg
Gray
4/~'//92
4/Zf/92
RI:DRS
Durr )KB
//492
OFFICIALRECORD COPY
A:GIN9302.INS