Text

', at"cmj.mam"K oOCmvrzm REGULAT ACCESSION NBR:9305180339 . DOC.DATE: 93/04/30 Orsrjuamroz Sesame INFORMATION DISTRZBUTIONOZSTEM (RIDE)

NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

WIDAY,J.A. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for RE Ginna Nuclear Power Plant.W/

930512 ltr. D DISTRIBUTION CODE: ZE24D COPIES RECEIVED'LTR i ENCL J SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 3 3 PD1-3 PD D 1 1 JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA AEOD/DSP/TPAB 1 1

-- ORS/OEAB NRR/DRIL/RPEB 1 1 REG FI 01 RGNl 1 1 EXTERNAL: EG&G BRYCEFJ.H NRC PDR 1 1 NSIC D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE} CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

iIiiiiiiiiiii iiiiiIIII

'Zfii"'Z rZZiiiiii ZZ.::-:

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 Joseph A. Illday TELEPHONE Plant Hanager AREA CODE Tld 546-2700 GINNA STATION May 12, 1993 US Nuclear .Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for April, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1993.

Very truly yours, o ph A. W'd y la t Manage JAW:jkl Attachments c: Mr. Thomas T. Martin NRC (1) 305180339 930430 PDR 'DOCK'5000244

~L R PDR

J la t GV'OUI

OPERATING DATA REPORT DOCKET NO. 50-244 DATE Ha 1 1993 COMPLETED BY Robert E. Dodge TELEPHONE 315 524-4446 Ext. 396 CPERATING STATUS 1 ~ Unit Name: R.E. GINNA MKlGLR PQKR PLANT Notes: Unit returned to service on 4-26-93 2~ Reporting Period: A ril 1993 at Z56 and rcmincd there at the end

3. Licensed Thermal Power (Wt): 1520 of report period.
4. Nameplate Rating (Gross We): 490 5~ Design Electrical Rating (Net We): 470
6. HaxiJasa Dependable Capacity (Gross HWe): 490 70 Haxiaun Dependable Capacity (Net HWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Honth Yr.-to-Date CumJIative 11 ~ Hours In Report Period 719 2 879 205 769.45

12. Number of Hours Reactor 'Was Critical 131.82 1 826.29 162 790.96
13. Reactor Reserve Shutdown Hours 1 687.55 *
14. Hours Generator On-Line 96 1 790.25 160 033.38 15 Unit Reserve Shutdown Hours 8.5 *

'6.

Gross Thermal Energy Generated (MWH) 91 944 2 582 930 226 626 683

17. Gross Electrical Energy Generated (HWH) 29 864 877 889 74 875 693
18. Net Electrical Energy Generated (HWH) 27 742 833 927 71 069 858
19. Unit Service Factor 13.35X 62.18X
20. Unit Availability Factor 13.35X 62.18X
21. Unit Capacity Factor (Using JIC Net) 8.21X 61 .63X 74.80X 22 ~ Unit Capacity Factor (Using DER Net) 8.21X 61.63X 74.80X
23. Unit Forced Outage Rate 0 X 0 X 5.81 X
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date and Duration of Each):
25. If Shut Down At End Of Rcport Period, Estimated Date of Startup
26. Units In Test Status (Prior to Camarcial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CNHERCIAL OPERATION
  • CUNJLATIVE TOTAL COHHENCING JANUARY 1, 1975
    • CUI4JLATIVE TOTAL COHMENCING NOVEMBER 8, 1969

l I

L

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 12 3 COMPLETED BY o ert E. Dodge TELEPHONE 315 524-4446 Ext. 396 MONTH A ril 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 17.

2 ~ 18.

3 ~ 19.

4 ~ 20.

5. 21.
6. 22. -10 7 ~ 23.
8. 24. -10 9 ~ 25. -10
10. 26. -10
27. 121 12 ~ 28. 219
13. 29. 392
14. 30. 425
15. 31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

C DO(:KET NO. ~0 244 UNITNAME R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhlPLETED BY E. Dodge Tl'.LEPllONE 315 524-4446 Ext. 396 a P4 e s-v0 Licensee c

0 ll) Cause 8 Corrective 0

L C

0 0 E Ew c Ho. Date o 0 0 Event o 0 Action to 0 >

o X o O~

Cl n'wn c Report /"

I/l (J Prevent Recurrence 0

O Unit returned to service n April 26 at 2356 following 993 Annual Refueling and Maintenance tage.

1 3 F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 hfanual for Preparation of Data B-hlaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Ma 1 1993 .

COMPLETED BY Robert E. Dodge TELEPHONE 315 524-4446 Ext. 396 MONTH A ril 1993 The unit returned to service on April 26 at 2356 after the 1993 Annual Refueling and Maintenance Outage.

The unit remained on the line at the end of the report'eriod.