Monthly Operating Rept for Mar 1993 for Re Ginna Nuclear Power Plant.W/930412 Ltr
ML17263A238
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1993
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9304210162
Download: ML17263A238 (7)


Text

ACCELERA ' DOCUMENT DISTH~UTION SYSTEM REGULA INFORMATION DISTRIBUTIO~YSTEM (RIDS)

ACCESSION NBR:9304210162 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-24'4 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas a Electric Corp.

MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1993 for RE Ginna Nuclear Power Plant.W/930412 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSONgA 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB RK/UO OEAB 1 1 NRR/DRIL/RPEB REG FILE 01 1 1 RGNl EXTERNAL: EGSG BRYCEgJ.H 1 1 NRC PDR 1 1 NSIC 1 1 p/0 P $7 g f 6 8~ 5' D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

(i lrrrrrI rrrsr

,'I rigel Zrir~ZZ I ntPE rrrrrr ROCHESTER GAS AND ELECTRIC CORPORATION cs 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREOY TELEPHONE Vice President AREA CODE 7 t B 546 2700 Cinna Nuctear Production GINNA STATION April 12, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1993 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1993.

Very truly yours,

~

~C'obert C. Mecred RCM/ jkl Attachments cc: Mr. Thomas T. Martin NRC (1) 21006~

9304210162 930331 PDR ADOCK 05000244 PDR --,

0 l

l ~',jJ()(J f 4

~,,

\

OPERATING DATA REPORT DOCKET NO. 50-244 DATE A r 12 1993 CCMPLETED BY Robert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS Unit Name: R.E. GINNA NUCLEAR PSIER PLANT Notes: The unit was shutdown 20 Reporting Period: March 1993 on March 12 for the Annual

3. Licensed Thermal Power (MWt): 1520 Refueling and Maintenance
4. Nameplate Rating (Gross We): 490 Outage.
5. Design Electrical Rating (Het MWe): 470
6. Maxiaun Dependable Capacity (Gross M'We): 490 7 Maximsn Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Humber 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-gate Cumlative

11. Hours In Report Period 744 2 160 205 050.45
12. Hwber of Hours Reactor Was Critical 278.47 1 694.47 162 659.14
13. Reactor Reserve Shutdown Hours 1 687.55
  • 14 Hours Generator On-Line 278.25 1 694.25 159 937.38

'5.

Unit Reserve Shutdown Hours 8.5 *

16. Gross Thermal Energy Generated (MWH) 386 820 2 490 986 226 534 739
17. Gross Electrical Energy Generated (MWH) 131 622 848 025 74 845 829
18. Net Electrical Energy Generated (MWH) 124 832 806 185 71 042 116
19. Unit Service Factor 37.40K 78.44K 78.15K
20. Unit Availability Factor 37.40'Y. 78.44K 78.16K
21. Unit Capacity Factor (Using MDC Net) 35.70K 78.41K 75.04K
22. Unit Capacity Factor (Using DER Net) 35.70K 78.41K
23. Unit Forced Outage Rate 0 0 5.8 X
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: April 25, 1993
26. Units In Test Status (Prior to Conmerciai Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION

<<CUMULATIVE TOTAL COMMEHCIHG JANUARY 1, 1975

<<*CUMULATIVE TOTAL CCMMEHCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A COMPLETED BY ril 1993 obert E. Dodg TELEPHONE 315 524-4446 ext. 396 MONTH March 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 482 17 '

~ 479 18.

3 ~ 472 19 ~

4 ~ 466 20 '

~ 460 21 ~

6. 455 22.

7 ~ 449 23.

8. 444 24.
9. 439 25.
10. 434 26.

432 27.

12. 194 28.

13 29.

'4.

30.

15. 31.

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DO(:KET NO.

UNITNAMI: R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhlPLETI:D BY R REPORT hlONTH TxLx/o/o//6 15 524-4446 ext. 396 Pl L

0 c c c v icensee 0 443 Cause L Corrective 0

L c I Em c 0 0 No. Date 0 o Event 0 0 Action to 0

I- 0X 0 LY 0 4/l C Report // 4/2 0

(J Prevent Recurrence O

0 Cl 93-02 3-12-93 The unit was shutdown on March 12 for the Annual Refueling and Maintenance Outage.

Estimated outage: 42 days.

1 2 F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Etluipment Failure (Explain) 1-hlanual for Preparation of Data B-hlaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Other (Explain) Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A COMPLETED BY ril 12 1993 obert E. Dodge TELEPHONE 315 524-4446 ext. 396 MONTH March 1993 On March 12, the unit was removed from service for the Annual Refueling and Maintenance Outage. Estimated outage: 42 days.