Text
ACCELERA '
DOCUMENT DISTH~UTION SYSTEM REGULA INFORMATION DISTRIBUTIO~YSTEM (RIDS)
ACCESSION NBR:9304210162 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-24'4 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas a Electric Corp.
MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Mar 1993 for RE Ginna Nuclear Power Plant.W/930412 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSONgA COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DOA 1
1 RK/UO OEAB 1
1 REG FILE 01 1
1 AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl EXTERNAL: EGSG BRYCEgJ.H NSIC 1
1 1
1 NRC PDR 1
1 p/0 P $ 7 g f 6 8~ 5' NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
(ilrrrrrI rrrsr
,'I rigel Zrir~ZZ I ntPE rrrrrr ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C. MECREOY Vice President Cinna Nuctear Production cs 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 TELEPHONE AREACODE 7t B 546 2700 GINNA STATION April 12, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Dear Sir:
Monthly Report for March, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244 Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1993.
Very truly yours,
~
~C'obert C. Mecred RCM/jkl Attachments cc:
Mr. Thomas T. Martin NRC (1) 21006~
9304210162 930331 PDR ADOCK 05000244 PDR --,
0 l
l
~,,
~',jJ()(J f 4
\\
OPERATING DATA REPORT DOCKET NO.
50-244 DATE A r 12 1993 CCMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 20 3.
4.
5.
6.
7 8.
Unit Name:
R.E. GINNA NUCLEAR PSIER PLANT Reporting Period:
March 1993 Licensed Thermal Power (MWt):
Nameplate Rating (Gross We):
Design Electrical Rating (Het MWe):
Maxiaun Dependable Capacity (Gross M'We):
Maximsn Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit was shutdown on March 12 for the Annual Refueling and Maintenance Outage.
1520 490 470 490 470 Humber 3 Through 7) Since Last Rcport, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-gate Cumlative 11.
12.
13.
14
'5.
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Hwber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 744 278.47 278.25 386 820 131 622 124 832 37.40K 37.40'Y.
35.70K 35.70K 0
2 160 1 694.47 1 694.25 2 490 986 848 025 806 185 78.44K 78.44K 78.41K 78.41K 0
205 050.45 162 659.14 1 687.55 159 937.38 8.5 226 534 739 74 845 829 71 042 116 78.15K 78.16K 75.04K 5.8 X 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
April 25, 1993 26.
Units In Test Status (Prior to Conmerciai Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY CCMMERCIAL OPERATION
<<CUMULATIVE TOTAL COMMEHCIHG JANUARY 1, 1975
<<*CUMULATIVE TOTAL CCMMEHCING NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER LEVEL MONTH DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE A ril 1993 COMPLETED BY obert E.
Dodg TELEPHONE 315 524-4446 ext.
396 March 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
482 17 '
~
479 18.
3 ~
472 19 ~
4 ~
466 20 '
~
460 21 ~
6.
455 22.
7 ~
8.
9.
10.
12.
13
'4.
15.
16.
449 444 439 434 432 194 23.
24.
25.
26.
27.
28.
29.
30.
31.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hlONTH DO(:KET NO.
UNITNAMI:R.E. GINNA NUCLEAR POWER PLANT
(:OhlPLETI:D BY R TxLx/o/o//6 15 524-4446 ext.
396 No.
Date 0
I-c0 L 0 o 0X c0 00 LY Pl L0 c v 0 4/l C
0 Cl I icensee Event Report
//
Em 0
4/2 (J c0 443 c
0 0
O Cause L Corrective Action to Prevent Recurrence 93-02 3-12-93 The unit was shutdown on March 12 for the Annual Refueling and Maintenance Outage.
Estimated outage:
42 days.
1 F: Forced S:
Scheduled REV. 4/85 4949 2
Reason:
A-Etluipment Failure (Explain)
B-hlaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hlethod:
1-hlanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE A ril 12 1993 COMPLETED BY obert E.
Dodge TELEPHONE 315 524-4446 ext.
396 MONTH March 1993 On March 12, the unit was removed from service for the Annual Refueling and Maintenance Outage.
Estimated outage:
42 days.