ML17263A181
| ML17263A181 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/28/1993 |
| From: | Dodge R, Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9303180290 | |
| Download: ML17263A181 (8) | |
Text
ACCEI ERA DOCVMENT DIST VTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9303180290 DOC.DATE: 93/02/28 NOTARIZED:
NO DOCKET FAQIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.
Rochester Gas
& Electric Corp.
MECREDY,R.C.
Rochester Gas a Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1993 for RE Ginna Nuclear Power Plant.W/930311 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR i ENCL
/
SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NR~RDORS/OEAB
~BEG 01 EXTERNAL: EGSG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGNl NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1
~ neo p y. g 7 g yg 7 o NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
4+a,
" c N
lt
~4 (l
II 1
IL il II 1L
~
j
~
~
'\\
h'
t zap uzi
'KI Ei IXIII'OCHESTER GAS AND ELECTRIC CORPORATION o
ROBERTG MECREOY Vlcc Prerldent Clnna Nudear Production Nt~
~ilroology veer Srrrr 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 TELEPHONE AREACODE 716 546 2700 GINNA STATION March 11, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for February, 1993 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1993.
Very truly yours, Robert C.
Me edy RCM/
Attachments cc:
Mr. Thomas T. Martin NRC (1) jLBOOo"-'303'i80290 930228 r
PDR ADOCK 05000244 R"
f'I K
I'
Qo 1
OPERATING DATA REPORT DOCKET NO.
50-244 DATE March 11 1993 CCHPLETED BY~~MP~ ~
P~WDPcP Robert E. Dodge GYRATING STATUS TELEPHONE 315 524-4446 ext. 396 2.
3 ~
4 ~
5.
6.
7.
8.
Unit Name:
R.E. GINNA NKLHLR PEER PLANT Reporting Period:
Februa 1993 Licensed Thermal Power (Wt):
Nameplate Rating (Gross We):
Design Electrical Rating (Net We):
Haxinun Dependable Capacity (Gross HMe):
Haxinun Dependable Capacity (Net We):
lf Changes Occur in Capacity Ratings (Items Notes:
The reactor power level averaged 98X for the entire report period.
1520 490 470 490 470 Nwter 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Nhich Restricted, If Any (Het We):
10.
Reasons For Restrictions, lf Any:
This Month Yr.-to-Date Cmaiative 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Hurber of Hours Reactor Has Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (WH)
Gross Electrical Energy Generated (HQI)
Het Electrical Energy Generated (HNH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 672 1 004 079 342 024 325 412 100X 100X 103.03X 103.03X 1 416 1 416 1 416 2 104 166 716 403 681 353 100X 100X 102.38X 102.38X 204 306.45 162 380.67 1 687.55 159 659.13 8.5 226 147 919 74 714 207 70 917 284 78.30X 78.31X 75.18X 75.18X 5.82X 24.
Shutdown Scheduled Over Next 6 Honths (Type, Date and Duration of Each):
Refuelin and Maintenance
- Harch 12 1993 45 da s 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Camerciai Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERC IAL OPERAT ION
- CUI4/LATIVETOTAL CCHHEHCIHG JANUARY 1, 1975
"*CUB/LATIVE TOTAL CCHMENCIHG NOVEMBER 8, 1969
V AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE March 11 1993 COMPLETED BY ~
c Aoc~
Wo~ w~<
Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Januar 1993 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
484 17 ~
483 2 ~
484 18.
484 3.
485 19'84 4 ~
485 20 ~
485 5.
485 21 ~
485 6.
484 22.
485 7 ~
485 23'83 8.
485 24.
484 9.
485 25.
484 10.
485 26.
484 485 27.
484 12.
485 28.
484 13.
484 29
'4.
484 30.
15.
484 31 ~
16.
484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DOCKET NO.
~0-244 1JNiT NAMi R E GlNNA NUCLEAlt POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATl:.
COMPLETED BY oer og REPORTMONTH FEBRUARY l993 TELEPHONE (315) 524-4446 ext-396 t
No.
Dcite 0
t-0 D
0
~
0 O~
rv C0
'00n'n
<<0 0 au o<<D D I/7 0O Licensee Event Report 0
Em 0
EA D to 0
D 0
E 0
iJ Cause L Corrective Action to Prevent Recurrence No power reduction for the month of February:
I F: Forced Sc Scheduled iitv. 4I85 4949 Reason:
A-Equipment Failure (Explain)
B4faintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examinacion F-Administrative
&Operational Error (Explain)
Hither (Explain) 3 Method:
14fanual 2-Manual Scram.
3-Automatic Scram.
4cher (Explain)
Exhibit G - Instructions for Preparation of Data.
Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATXVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE March 11 1993 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Februar 1993 The unit operated at approximately 98% reactor power level for the month of February.