ML17263A173
| ML17263A173 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/03/1993 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, NUDOCS 9303110212 | |
| Download: ML17263A173 (5) | |
Text
ACCEI ERAT~ DOCUMENT DIST UTION SYSTEM REGULAT~ INFORMATION DISTRIBUTION STEM (RIDS)
ACEESSIONWBR:9303110212 DOC.DATE: 93/03/03 NOTARIZED: NO DOCKET FACIL'.50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas a Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Clarifies implementation guidance sections of Generic Implementation Procedure GIP-2,Rev 2,per GL 87-02.Util commits to use entire GIP-2,w/exceptions identified in SSER 2.
D DISTRIBUTION CODE:
A025D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Seismic Qualification of Equipment in Op rating Plants A-46 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
/
05000244 RECIPIENT ID CODE/NAME NRR/PD11-2 JOHNSON,A INTERNAL: NRR/DE NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SCSB NRR/DSSA/SRXB OGC/HDS1 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1
-1 1
NRR/DE/ECGB NRR/DE/MEB NRR/DRPE/PDl-3 NRR/DSSA/SPLB
/~-3 REG FILE Ol RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 2
2 4
4 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL
~M
~ 4 0'
9 p
I
~
~ ~np iuttII szzigjzi uizzzsz ROCHESTER GAS AND ELECTRIC CORPORATION Yet K I
55 AY K 4
89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C MECREOY Vice Prerldent Otnna Nuclear Production March 3, 1993 TELEPHONE AREACOOE Tre 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Generic Letter 87-02, Supplement 1
R. E. Gi'nna Nuclear Power Plant Docket No. 50-244
Reference:
(a) Telecon on February 10,
- 1993, P.Y.
Chen (NRC), Mark Flaherty (RG&E) and Glenn Hermes (RG&E),
Subject:
RG&E Letter to NRC Dated January 12, 1993.
(b) Telecon on February 18, 1993, P.Y. Chen (NRC)P Allen Johnson (NRC), George Wrobel (RG&E), and Dan Zebroski (RG&E),
Subject:
RG&E Letter to NRC Dated J'anuary 12, 1993.
(c) Letter from R.C. Mecredyy RG&EP to A R Johnsonr NRCP
Subject:
Generic Letter 8702, Supplement 1
(SQUG Resolution of USI-A-46) and Generic Letter 88-20, Supplement 4
(Sei smi c Events),
dated January 12 I 1993.
Dear Mr. Johnson:
As a result of several teleconference calls.(Refs.
(a) and (b))
related to the proposed resolution of Generic Letter 87-02, Supplement 1 for Ginna Station (Ref. (c)), the NRC requested that RG&E provide further clarification with respect to the implementation guidance sections of the Generic Implementation Procedure, Revision 2,
as corrected on February 14, 1992 (GIP-2).
Consequently, RG&E commits to the use of the entire GIP-2, including the clarifications, interpretations, and exceptions identified in SSER-2.
This includes both the implementation guidance and commitment sections of the GIP-2.
Any deviations from the implementation guidance sections will be evaluated in accordance with Part I, Section 1.3 of the GIP-2.
Very 'truly yours, MDF/510 9303110212 930303 PDR ADOCK 05000244 PDR P
Robert C. Mecr dy Pg ~~E]l'I~
(P>~
I/O
I
~
1 Il II p
J
Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Xnspector