Monthly Operating Rept for Dec 1992 for Re Ginna Nuclear Power Plant
ML17262B146
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9301250300
Download: ML17262B146 (10)


Text

ACCELE KD DOCUMENT Dj:ST UTrON SYSTEM ACCESSION NBR:9301250300 DOC.DATE: 92/12/31 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas s Electric Corp.

MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1992 for RE Ginna Nuclear Power Plant.W/930115 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR 4 ENCL 2 SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244

/

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA

/LPEB10 RE FIL 01 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

-1 1

1 D

.D

~ go pg yg 7g / g 7 g D

S A

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl D

S TOTAL NUMBER OF'COPIES REQUIRED:

LTTR 14 ENCL 14

M

-0 I

4

~

1 I

"r e,~

i!// ISS8'

/Sijjjj iigjp rrjrjjjjrIj Irrrr ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERTC MECREOY Vice Pierident Clnna Nuclear Production TELEPHONE AREACODETte 546 2700 GINNA STATION January 15, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for December, 1992 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith's the monthly operating status report for Ginna Station for the month of December, 1992.

Very truly yours, Robert C. Mecr dy RCM/

Attachments cc:

Mr. Thomas T. Martin NRC (1) p5OOOB

(

q30i300300 ent23i VI I r PDR ADgcg, 0500024+

R PDR i )'

- ~

'i I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY 50-244 R.E. Ginna Nuclear Power Plant Januar 1

1993 o ert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH December 1992 DAY AVERAGE DAILY POWER L1VTEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~

479 17.

483 2 ~

480 18.

481 3 ~

481 19.

481 4 ~

481 20.

481 5.

481 21 ~

482 6.

481 22'82 7 ~

480 23'83 8.

480 24.

455 9.

481 25.

485 10'81 26 ~

485 481 27'84 12.

482 28.

484 13.

481 29.

484 14.

481 30 ~

484 15.

481 31 ~

484 16.

482 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

I

OPERATING DATA REPORT DOCKET NO.

50-244 DATE Ja sr 15 1993 COMPLETED BY Robert E. Dodge CFERATING STATUS TELEPHONE 315 524-4446 ext. 396 2.

3 ~

4 ~

5 ~

6.

7.

8.

Unit Nsl>>:

R.E GIINA IkNXEAR PRIER PIANT Reporting Period:

Decerber 1992 Licensed Thermal Power (Wt):

Nameplate Rating (Gross %le):

Design Electrical Rating (Net Sle)t Maxlnun Dependable Capacity (Gross MMe):

Maxiaun Dependable Capacity (Net MNe):

If Changes Occur in Capacity Ratings (Items Notes The reactor power level averaged 98X for the majority of the report, with the following exception outlined on page 4.

1520 490 470 490 470 Nmher 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Nhich Restricted, If Any (Net MNe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22 ~

23.

Hours In Report Period Nurrber of Hours Reactor Nas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MMH)

Gross Electrical Energy Generated (MNH)

Net Electrical Energy Ger>>rated (MNH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744 744 744 1 106 157 376 473 358 072 100X 100X 102.40X 102.40X Yr.-to-Date 8 784 7 633.71 7 537.75 10 829 240 3 668 197 3 483 384 85.81X 85.81X 84.37X 84.37X 2.03X Chalet ive

  • 4 202 890.45 160 964.67 1 687.55 158 243.13 8.5 224 043 753 73 997 804 70 235 931 78.15X 78.15X 74.99X 74.99X 5.87X 24.

Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin and Maintenance

- March 12 1993 45 da s 25.

If Shut Dom At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Comnercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

  • CUIRILATIVETOTAL COMMENCING JANUARY 1, 1975
    • CUW/LATIVETOTAL COMMENCING NOVEMBER 8, 1969

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hIONTH December l)O(:Kl'.1'O.

~0 244 llNITNAhll:.R E. GINNA NUCLEAR POWER PlA¹ DALAI,. 3anua 15 1993

(:OhtPLI'.l'I:.D IIY rt E TI:.LI(PHONI:.

315) 2 -4446 xt. 396 Ho.

Dote C

e4 0

O~

C0 00 Pl L0 C 0 0lh C

0O l.icensee Event Repor~

II Ew 0

0 Vl 0 Ml +

C 4I Ml 0C 0

E 0

Cause 8 Corrective Action to Prevent Recurrence 92-09 12/24/92 0

A Turbine runback due to loss of circuit 751.

F:

Forced S:

Scheduled IItV. 4/SS 4949 Reason:

A-Equipment Failure (Explain)

B.Maintenance or Test C-Refueling D-Regulatory Restriction Eperator Training gt License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

14fanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

NARRATZVE

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Gin a Nuclear Power Plant DATE Janu 15 1993 COMPLETED BY R

ert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH December 1992 The reactor power level averaged 984 for the majority of the report, with the following exception:

On December 24, 1992 at 0435 a turbine runback occurred due to loss of circuit 751.

The unit returned to 984 power level that day and remained there at the end of the report period.