ML17262A986
| ML17262A986 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/31/1992 |
| From: | Dodge R, Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9209160131 | |
| Download: ML17262A986 (7) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
ACCESSION NBR: 9209160131 DOC. DATE: 92/08/31 NOTARIZED:
NO DOCKET 0 FACIL: 50-244 Robert Emmet Ginna Nuclear Plant>
Unit 1> Rochester Q
05000244 AUTH. NAME AUTHOR AFFILIATION DODGE> R. E.
Rochester Qas 8c Electric Corp.
MECREDY. R. C.
Rochester Qas 8c Electric Corp.
RECIP.. NAME RECIPIENT AFFILXATXON R
SUBJECT:
Monthly operating rept for Aug 1'792 for GNPP. M/920'F14 1tr.
DZSTRIBUTZON CODE:
ZE24D COPIES RECEIVED: LTR t
ENCL i
SIZE:
TITLE: Monthly Operating Report (per Tech Specs>
NOTES:License Exp date in accordance eith 10CFR2>2. 10'P(9/1'P/72).
05000244 REC IP IENT XD CODE/NAME PDl-3 LA JOHNSON> A COPIES LTTR ENCL 3
3 1
1 REC ZP IENT ID CODE/NAME PDi-3 PD CQP ZES LTTR ENCL 1
INTERNAL: AEOD/DOA NRR/DLPG/LPEB10 G
01 EXTERNAL: "EG8(G BRYCE> J. H NSIC
~ PP P b$ 'f5 gy ig, AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF CQP ZES REQUIRED:
LTTR 14 ENCL 14
////////////I
///'// ~i
//
SFZ)l
,ROCHESTER GAS AND ELECTRIC CORPORATION
'I
'z'loh)r.
,,'n:.
/ i 'TATf.
~
89 EAST AVENUE, ROCHESTER N. Y. 14649-0001 ROBERT C MECREDY Vice Preridenl Cinna Nuclear Production TELEPHONE AREA CODE 716 546 2700 GONNA STATION September 14, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for August, 1992 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1992.
Very ruly yours, Robert C. Mecred RCM/'ttachments cc:
Mr. Thomas T. Martin NRC (1)
'7l209ih013i 92083i
PDR'DOCK 05000244 R
~,~(K to d/
((
~
~ \\)ll h a ~
I
'A l
~,IE N
~
fC il
'f)(~)g",",<"
OPERATING DATA REPORT DOCKET NO.
50 244 DATE S
t r 14 1992 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 20 3.
4.
5.
6.
70 8.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
A ust 1992 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net M'We):
Maximus Dependable Capacity (Gross MWe):
Maximus Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approx.
97X reactor power level for the entire report period.
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to.Date Curuiat 1 ve 11.
12.
13.
, 14.
15.
16.
17.
18.
19.
20
'1.
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On. Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (HWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 744 744 744 1
101 108 370 207 351 756 100K 100y.
100.59K 100.59X Dy.
5 855 4 704.71 4 608.75 6 514 350 2 202 609 2 090 051 78.71K 78.71K 3.28K 199 961.45 158 035.67
'I 687.55 155 314.13 8.5 219 728 863 72 532 216 68 842 598 77.83K 77.83/.
74.60H 74.6(C 5.97X 1I
<<)
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units in Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY IN IT IAL ELECTRICITY COMMERCIAL OPERATION
<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
- CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
A GE DAILY UNIT POWER DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Se tember 4
1 92 COMPLETED BY obert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Au ust 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2 ~
3 ~
4 ~
5 ~
6.
7 ~
8.
9 ~
10
'73 472 471 471 472 471 472 473 473 474 472 17.
18.
19
'0.
21.
22
'3.
24.
25
'6.
27
'79 478 474 472 472 472 469 471 470 470 469 g ~
'12.
13 ~
14.
15.
16
'70 471 473 473 478 28.
29,.
30.
31.
472 471 471 472 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DO(:Kl'.T NO.
UNITNAMf: R.E. 6INNA NUCLEAR POWER PLANT UNlT SHUTDOWN AND POWER REDUCTlONS
(:OMPLI:.1'ED BY rt E.
ge REPORT MONTH Tl:LEPHONE 315-524-4446 ext.
396 Ginna Station No.
Do'te c
O I4 I
o o C0 oo OI o-0 o c u oo o o
0Vl C o
CI Licensee Event Report 5
Ew o
0 I4 o I/l (J no ICS a
Q Q
E O U
Cause 8I Corrective Action to Prevent Recurrence No unit shutdawn or poorer reductions this report period.
1 F: Forced S:
Scheduled Atv. 44S 4949 Reason:
A-Equipment Failure (Explain)
B4faintenance or Test C-Refueling D-Regulatory Restriction Eperator Training gt License Examination F-Administrative G.Operational Error (Explain)
H-Other (Explain)
Method:
1*fanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE SUMKMY OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Se tern r 14 1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Au ust 1992 The unit operated at approximately 974 Reactor Power Level for the entire report period.