Provides Status of NRC Activities Re Plant Svc Water Sys Operational Performance Insp,Per M Miller to W Butler
ML17262A864
Person / Time
Site: Ginna 
Issue date: 05/18/1992
From: Nerses V
Office of Nuclear Reactor Regulation
To: Mark Miller
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML17262A865 List:
References
NUDOCS 9205280239
Download: ML17262A864 (6)


Text

~pR RFCy~

"o

~pg (l0 I

3 0

Cy o~

Cy

/p +>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 May 18, 1992 MEMORANDUM FOR:

Melanic A. Hiller Diagnostic Evaluation and Incident Response Branch Office of Analysis and Evaluation of Operational Data FROH:

SUBJECT:

REFERENCE:

Victor Nerses, Acting Director Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation R.

E.

GINNA SERVICE WATER SYSTEM OPERATIONAL PERFORMANCE INSPECTION Note from Melanic Hiller to Walter Butler dated, April 22, 1992 In the referenced

note, you pointed out a couple of matters that warrant staff attention.

For your information, that status of our activities in these matters is as follows:

The Special Inspection Branch (RSIB) report (Report 91-201) for the Ginna Service Water System Operational Performance Inspection (SWSOPI) was issued to the licensee by the Division of Reactor Projects I/II, by letter dated January 30, 1992.

Since Report 91-201 has been issued Rochester Gas and Electric Corporation (RG&E) has provided responses dated January 31,

1992, April 6,
1992, and April 9, 1992.

These have addressed the system re-balancing, SEP Topic IX-3, and the various inspection findings documented within Report 91-201, respectively.

The Electrical Systems Branch (SELB) has completed their review, dated April 23, 1992, of the use of the electrical system cross-tie.

The SELB safety evaluation explicitly addresses the lack of technical justification of RG&E's position regarding active and passive failures affecting the use of the cross-ties.

The SELB conclusion is that the issue can be resolved by either (1) revising the technical specifications to require that two service water system (SWS) pumps are operable on each

bus, or (2) verifying by analysis that only one SWS pump is needed for the recirculation phase following a Design Basis Accident (OBA).

The Plant Systems Branch (SPLB) has additionally completed their review, dated April 28, 1992, of the information submitted by RG&E.

RG&E stated that results from preliminary analyses are favorable with respect to having only one SWS pump operable during the DBA recirculation phase.

SPLB concluded that they have no immediate system operability concerns.

SPLB also concluded that they will review the RG&E submittal of the final analysis once their Plant Operations Review Committee (PORC) has completed their review.

The staff evaluations that have been issued to date are enclosed for your information.

The licensee appears to have addressed the issues in a 9205280239 920518 PDR ADOCK"05000244

PDR

E

  • ~

~

~

I ll,s gpg

) p p)

)1.,

I'

Helanie A. Hiller May 18, 1992 responsible manner.

Appropriate staff review will be performed when the final RG&E analysis becomes available.

For further technical input to the Ginna issues, it would be appropriate to forward this information through the NRR/DRIS/RSIB Chief.

The management of followup issues resulting from NRC team inspection activity has to be properly controlled to preclude inadequate closeout of the team's inspection findings.

OTjginal signed by Victor Nerses, Acting Director Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Memorandum from Faust Rosa to Walter Butler dated April 23, 1992 2.

Memorandum from Conrad McCracken to Walter Butler dated April 28, 1992 DISTRIBUTION:

Docket File NRC

& Local PDR PDI-3 Reading File SVarga JCalvo VNerses WButler MRushbrook BKGrimes RKSpessard, AEOD CEMcCracken FRosa

AJohnson, 14 D

1 JTatum RAGramm EVImbro

SRubin, AEOD OFFICE LA; SELB SPLB NANE MRushbrook AJoh on:sk FRosa CMcCracken E

bro DATE OFFICE NANE DAT

~

92 A 0:PDI-3" (8 92

/92 N

Z/92 3

/92

/

2 OFFI AL Y

FILER C:(MP~DOCS(MILLER.MEM

1 Melanic A. Miller 2 -

Hay 18, 1992 e

responsible manner.

Appropriate staff review will be performed when the final RG&E analysis becomes available.

Original signed by Victor Nerses, Acting Director Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Memorandum from Faust Rosa to Walter Butler dated April 23, 1992 2.

Memorandum from Conrad HcCracken to Walter Butler dated April 28, 1992 DISTRIBUTION:

Docket File 8o >'/'f-NRC

& Local PDR PDI-3 Reading File SVarga JCalvo VNerses WButler MRushbrook BKGrimes RKSpessard, AEOD CEHcCracken FRosa

AJohnson, 14 D

1 JTatum RAGramm EVImbro

SRubin, AEOD For further technical input to the Ginna issues, it would be appropriate to forward this information through the NRR/DRIS/RSIB Chief.

The management of followup issues resulting from NRC team inspection activity has to be properly controlled to preclude inadequate closeout of the team's inspection findings.

OFFICE IIANE DATE OFFICE I

LA:

HRushbrook A D.'PDI=3 I-3 AJoh on:sk

/92 SELB ~

FRosa N/ l/92 SPLB CMcCracken

~i/ i9~

E bro

/

2 DAT

(& 92 OFF I

$AL pY FILENAHE-:

C: iWP DOCSiHI LLER.HEM

h li t

1 b

PI i1

~g C

St g

~,

b J

P

,ill

~ W$4S+

I, ~h 3XQ'g+

le%

'ltd ~

1) l)