Monthly Operating Rept for Mar 1992 for Re Ginna Nuclear Power Plant.W/920415 Ltr
ML17262A814
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9204170010
Download: ML17262A814 (10)


Text

ACCELERATED D TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9204170010 DOC.DATE: 92/03/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1,'ochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION R Monthly operating rept for Mar 1992 for RE Ginna Nuclear Power Plant.W/920415 ltr.

'U D

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) g ENCL Q SIZE: S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 /

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1

~RR/~ PQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 CREG FIL Ol 1 1 RGN1 1 1

~

EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1' NSIC 1 1

/Jo p'd"pg7g (( ~

R D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIFfS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

szzsu j zztzsIZ

/ zzjijjrts irerzuz

~ znzEE zznzzu ROCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER N. K 14649-0001 ROBERT C MECREDY TELEPHONE Vice Preaident AREA CODE tie 546-2700 Cinna Nudear Producrion GINNA STATION April 15, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1992.

Very truly yours, Robert C. Mec edy RCM/deb Attachments cc: Mr. Thomas T. Martin NRC (1) 9204g700~0 9 0~~1 I'DR, "ADOCl" 0>00024@

R PDR

l b

b k V

4>

OPERATING DATA REPORT DOCKET HO. 50.244 DATE A r 5 1992 COMPLETED BY Robert ED Dodge TELEPHONE 315 524-4446 ext. 396 OPERATING STATUS

1. Unit Name: R.E. GIHNA NUCLEAR POWER PLANT Notes: The unit operated at 2~ Reporting Period: March 1992 approximately 97% power
3. Licensed Thermal Power (MWt): 1520 level for the entire
4. Nameplate Rating (Gross MWe): 490 report period. The unit was
5. Design Electrical Rating (Net HWe): 470 removed from service on
6. Maximm Dependable Capacity (Gross MWe): 490 3-27-92 for the Annual Refueling
7. Maximus Dependable Capacity (Het MWe): 470 and maintenance.
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Het We):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cwulative

'11 ~ Hours In Report Period 744 2184 196 290.45

12. Hunber of Hours Reactor Was Critical 631.30 2021.47 155 343.43
13. Reactor Reserve Shutdown Hours 1 687.55 *
14. Hours Generator On-Line 625.75 1938.75 152 689.13
15. Unit Reserve Shutdown Hours 1687.55 *
16. Gross Thermal Energy Generated (MWH) 2 756 352 215 970 865
17. Gross Electrical Energy Generated (MWH) 293 653 931 728 71 261 335
18. Het Electrical Energy Generated (MWH) 278 439 883 027 67 635 574
19. Unit Service Factor 84.11K 90.83K 77.95K
20. Unit Availability Factor 84.11K 90.83K 77.95K
21. Unit Capacity Factor (Using MDC Net) 79.63K 86.02K 74.69K
22. Unit Capacity Factor (Using DER Het) 79.63K 86.02K 74.69K
23. Unit Forced Outage Rate 1.5Iy4 4.41K 6.03/
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin and Maintenance Outa e: Startin March 27 1992 Duration: 43 da s

25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05-07-92
26. Units In Test Status (Prior to Coemercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATIOH "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

"*CUMULATIVE TOTAL COMMEHCIHG HOVEMBER 8, '1969

0 a.

t

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A COMPLETED BY ril 1992 Robert E. odge TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 54 17 ~ 476 2 ~ 110 18. 475 3

4

~

~

304 475 19 20 '73

~ 474 5.

6.

7 ~

476 475 476 21.

22 23.

'76 475 475

8. 476 24. 475 9.

10 '78 476 25.

26

'38

~

475 476 12 13

'77

'78 477 27 28 29.

'12 14 477 30.

31.

'5.

477

16. 476 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

4 1 n

F

l)O(:Kl T NO. ~0-244 c

liNITNAMI:.R.E- (siNNA MUCLEAtt POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATI'- 2

(:OMPLl:.TI(D BY d e REPORT MONTH 15)- 24-4446 Ext 396 Pl OI ~o 0 @I a a v Licensee Em D Ill Cause gI Corrective C

Ho. Date D o

P 0 h 0 VI a

a~D Event M D

o O Action to t- o X D cc D IIl C Report 0 O Prevent Recurrence o

fJ C1 92-04 3-27-92 The bnit was shutdown on March.;.27 for the Annual Refueling and Maintenance Outage it remained at the end of the report shutdown period.

1 3 F: Forced Reason: - Method: Exhibit G - Instructions S: Scheduled A-Equipmeat Failure (Explain) 14fanual for Preparation of Daca B4haintenance or Test 2-Manual Scram. Encry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction'&perator 4cher (Explain) 0161)

Trainiag gt License Examinacioa F-Administrative

&Operational Error (Explain)

ICY. 4/$ 5 4949 Hither (Explaia) Exhibit 1 - Same Source

-0

'I e

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 DATE A COMPLETED BY r'5 UNIT R.E. Ginna Nuclear Power 992 Plant Ro ert E. Dodg TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1992 The unit returned to service on 3-1-92 and operated at.

approximately 974 Reactor Power. On 3-27-92 the unit was removed from service for the Annual Refueling and maintenance outage.