Notice of Violation from Insp on 920106-10.Violation Noted: Equipment Qualification File for Vendor Supplied SMA Torque Switches Installed in safety-related MOVs Not Established & Maintained in Current & Audible Form
ML17262A804
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/30/1992
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17262A801 List:
References
50-244-92-01, 50-244-92-1, NUDOCS 9204070191
Download: ML17262A804 (2)


Text

APPENDIX A NOTICE OF VIOLATION Rochester. Gas and Electric Corporation Ginna Nuclear Power Station Docket No. 50-244 License No. DPR-18 As a result of the inspection conducted on. January 6-10, 1992, and in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10CFR Part 2, Appendix C (Enforcement Policy) (1991), the following violation was identified:

10CFR 50.49(d) requires that the environmental qualification files for safety-related equipment be kept current and in an auditable form for the entire period during which the covered item is installed in the nuclear power plant.

Contrary to the above, as of January 6, 1992, the equipment qualification file for the Limitorque Corporation supplied SMA torque switches installed in the safety-related motor operated valves 860 A, C, and D was not established and,'herefore, was not maintained current and in an auditable form.

This is a Severity Level IV Violation (Supplement I)

Pursuant to the provisions of 10CFR 2.201, Rochester Gas and Electric Corporation is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector, within thirty days of the receipt date of the letter which transmitted'this Notice of Violation (Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation" and should include:

(1) the reason for the-violation, or, ifcontested, the basis for disputing the violation; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending this response time.

9204070191 920330 PDR ADOCK 05000244 8

PDR