Docket No. 50-244
Rochester
Gas and Electric Corporation
AKIN:
Dr. Robert C. Mecredy
Vice President
Ginna Nuclear Production
89 East Avenue
Rochester, New York 14649
Dear Dr. Mecredy:
Subject:
Inspection Report No. 50-244/92-01
This letter'efers to the engineering and technical support inspection conducted by
Messrs. A. Lohmeier, H. Gregg, and R. Mathew of this office at the Robert E. Ginna
Nuclear Power Plant, Ontario, New York and Nuclear Engineering Services (NES)
Department offices in Rochester,
New York during the period January 6-10, 1992.
Mr.
Lohmeier discussed
the results of the inspection with you and members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included the effectiveness of the engineering and
technical support organization at the Ginna plant site and NES engineering offices in
Rochester.
Within these areas,
the inspector selectively examined engineering organization
management
procedures
and effectiveness toward implementation of modifications and
facility changes.
In these areas, it was observed that your engineering personnel
performance was commensurate
with the requirements of the Code of Federal Regulations,
Techriical Specifications, and Final Safety Analysis Report.
Based on the results of this inspection, it appears
that environmental qualification of Class 1E
electrical equipment (SMA type torque switches in motor operated valves (MOVs) 860 A, C
and D) was not conducted in full compliance with NRC requirements,
as set forth in the
Notice of Violation enclosed herewith as Appendix A. Instructions have been provided in
Appendix A for your response.
Furthermore, two unresolved
issues concerning the timeliness of your 10CFR 21 report
regarding loose screws and sockets and timeliness of corrective actions taken for unqualified
torque switches are called to your attention.
'V204070186
920330
ADOCK 05000244
G
t
~
'
~ '\\
Rochester
Gas and Electric
Corporation
Your cooperation with us in this matter is appreciated.
No other response to this letter is
required.
Sincerely,
Enclosure:
NRC 'Inspection Report No. 50-244/92-01
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
r
cc w/encl:
R. Smith, Senior Vice President, Production and Engineering
Central Records (4 copies)
Director, Power Division
State of New York, Department of Law
N. Reynolds, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
State of New York, SLO Designee
bcc w/encl:
Region I Docket Room (with concurrences)
(w/cy of IFS Forms)
Management Assistant, DRMA (w/o encl)
J. Linville;DRP
W. Lazarus, DRP
T. Moslak, SRI - Ginna (w/cy of IFS Forms)
R. Lobel, OEDO
W. Lanning, DRS
I ~
8
Rochester
Gas and Electric
Corporation
RI:DRS
Lo
'er
03/ /92
RI:DRS
/f4
03/~I/92
RI:DRS
Durr
0387/92
OFFICIAL RECORD COPY
A:LOHMEIER