ML17262A749

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1992 for Re Ginna Nuclear Power Plant
ML17262A749
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9202240387
Download: ML17262A749 (10)


Text

ACCELERATED DISTRJBUTlON DEMONSTI&TION SYSTEM REGULAT% INFORMATION DISTRIBUTIOtOFSTEM (RIDE)

ACCESSION NBR:9202240387 DOC.DATE: 92/01/31 NOTARIZED:

NO DOCKET PACIL 50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGEFR.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1992 for RE Ginna Nuclear Power Plant.W/920218 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

R D

S 05000244

/

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA R~DBPQ PEB10 REG FILE 01 EXTERNAL: EG&G BRYCEFJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 A

D D

S D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

j:

(

g

~

A 4

f Il

t'Z///II f /I/IIIII/III/

/IIII/ II /IIIIIIIIIIII/

l IIII/lll I///I////I//II ROCHESTER GAS AND ELECTRIC CORPORATION o

ROBERT G MECREDY Vice Pierident Cinna Nudear Production 89 EAST AVENUE, ROCHESTER N.K 14649-0001 TELEPHONE AREACODE /16 546 2700 GINNA STATION February 18, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for January, 1992 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1992.

Very truly yours, Robert C. Mecredy RCM/deb Attachments cc:

Mr. Thomas T. Martin NRC (1) 9202240387 920131 PDR,. ADOCK 05000244 R

", ~)'.

'...iver'DR X(pt/

r

l

, c h'Vk4i

. ~

18 1992 OPERATING DATA REPORT DOCKET NO.

50'44 DATE Feb COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1.

2 ~

3.

4.

5.

6.

7.

8.

Unit Name:

R.E.

GINNA NUCLEAR POWER PLAHT Reporting Period:

Jsnusr 1992 Licensed Thermal Power (MWt):

Nameplate Rating (Gross MWe):

Design Electrical Rating (Het MWe):

Maxinun Dependable Capacity (Gross MWe):

Maximus Dependable Capacity (Net We):

If Changes Occur in Capacity Ratings (Items Notes:

The unit operated at approximately 98K power level for the entire report period.

1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

11.

12.

13.

14.

15 ~

16.

17.

18.

19.

20.

21 ~

22.

23.

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On. Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744 744 744 1

106 865 375 904 357 651 100K 100K 102.2'02.28/

OX Yr.-to-Date 744 744 744 1

106 865 375 904 357 651 100K 100'4 102.28K 102.28K DX Cmjlative

  • 0 194 850.45 154 074.96 1 687.55 151 449.38 8.5 214 321 378 70 705 511 67 110 198 74.67X 74.67K 6.02K 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin snd Maintenance Outs e:

Stsrtin March 27 1992 Duration: 40 ds s 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

05-10-91 26.

Units In Test Status (Prior to Comsercisl Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

. I

,t P

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Februar 8

1992 COMPLETED BY Robert E.

Dod TELEPHONE 1

315 524-4446 ext.

396 MONTH Zanuar 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 478 17.

479 2 ~

478 18.

479 3

~

479 19.

478 4

~

478 20.

479 5.

478 21.

479 6 ~

478 22'79 7 ~

478 23.

479 8.

478 24.

479 9 ~

479 25.

478 10.

479 26.

478 479 27'78 12.

479 28.

478 13.

479 29.

479 14.

480 30.

479 15.

479 31.

479 16'79 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

U

V p l)O(:Kl'.T NO.

SO-244 UNlTNAMI:R.E. GINNA NUCLEAR POUTER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OMPLETED BY C

E.

ge REPORT hlONTH TI LI:PIIONI: 315-524-4446 eat.

396 Ginna Station Ho..

Date c0 L

0 04 c0 00 4 e~0 OCO 0 o 0

0IA C 0

Cl Licensee Event Report 4

Ew O

EA c0 IA c

0 E

0 O

Cause L Corrective Action to Prevent Recurrence No power reductions for this nanth.

1 F: Forced S:

Scheduled Rtv. 4/8S 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction'perator Training 8c License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

I-hfanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Feb a

18 1992 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.