ACCELERATED I+TRIBUTION DEMON~TION SYSTEM, REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9201240139 DOC.DATE: 92/12/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILXATXON, DODGE,R.
Rochester Gas
& Electric Corp.
MECREDY,R C.
Rochester Gas
& Electric Corp.
RECXP;NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Dec 1991 for R.E.
Ginna Nuclear Power Plant.W/920117 ltr.
DISTRIBUTION CODE:
IE22D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.73/50.9 Licensee Event. Report (LER), Xncident Rpt, et NOTES:License Exp'date in accordance with 10CFR2,2.109(9/19/72).
05000244 D
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: ACNW AEOD/DSP/TPAB NRR/DET/ECMB 9H
-NRR/13LPQ/LHFB10 NRR/DOEA/OEAB
~
NRR/DST/SELB 8D
'RR/DST/SPLBSD1 EXTERNAL EG&G BRYCE IJ
COPIES LTTR ENCL 1
1 1
1
'2 2
1 1
1 1
1 1
1 1
1 1
1.
1 1'
1 1
3 3
1 1
1, 1
RECIPIENT XD CODE/NAME PD1-3 PD l
AEOD/DOA AEOD/ROAB/DSP NRR/DET/EMEB 7E NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 NRR/DST/SICBSH3 NRR/DST/SRXB SE RES/DSIR/EXB L ST LOBBY WARD NSXC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL 1
1 C
1 1
2 2
1 1
1 1
2 2
1 1
1 1
1 1
D D'
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
'ISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED LTTR 31 ENCL 31 D
S.
ROCHESTER GAS AND ELECTRIC CORPORATION 0
ROBERT C h1ECREDY Vice Pce5ideni Cine Nucle5r Production
~ *~ ( at ~ u i'
u,Ioec 51515 89 EAST AVENUE, ROCHESTER N.Y. 5464S-0005 TELEPHONE AREACODE 716 546 2700 GINNA STATION January 17, 1992 e
US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Sub)ect:
Monthly Report for December, 1991 Operating Status Information R.
E. Ginna Nuclear Power'lant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is th'e monthly operating status report for Ginna Station for the month of December, 1991.
Very truly yours, Robert C. Mecredy RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1)
'T1201240139 921231 PDR ADDCK 05000244 R
PDR y/
'OPERATXNG DATA REPORT DOCKET NO.
50.244 DATE Jan 17 1992 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 52C-4C46 ext 396 1.
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
December 1991 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maximus Dependabte Capacity (Gross MWe):
Maxima Dependable Capacity (Net HWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approximately 97X reactor power level for the entire report period.
1520 490 470 490 470 Nurher 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Het MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cwuiative 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Hunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
~
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 74C 744 744 1
102 728 375 340 357 082 100K 100K 102.12'4 102.12K OX 8 760 7 591.65 7 537.25 0
10 863 816 3 667 133 3 483 254 86.04K 84.60'4
.39 19C 106.45 153 330.96 1 687.55 150 705.63 8.5 213 214 513 70 329 607 22! 222 542 77.814 74.56K 74.56'4 6.054 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refuelin and Maintenance Outa e:
Startin March 27 1992 Duration: 40 da s 25.
If Shut Down At End Of Report Period,'stimated Date of Startup:
05-10.91 26.
Units In Test Status (Prior to Comnerciai Operaticn):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERAT I ON
- CUMULATIVETOTAL COMMEHCING JAHUARY 1, 1975
- CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969
AVERAGE DAILY UNIT POWER L1971K DOCKET NO.'0-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Zanuar 7
1992 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH December 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2 ~
477 477 17 ~
18.
477 477 3 ~
478 19.
476 4 ~
478 20'77 5.
478-21.
478 6.
477 22.
478 7 ~
478 23.
479 8.
478 24'78 9.
478 25.
478 10.
478 26.
478 478 27.
478 12
'3.
14.
15.
478 478 478 478 28.
29.
30.
31.
478 479 478 478 16.
478 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole
, megawatt.
0 T
'O(:KI'.T NO.
~0-244
"'UNI1'NAMI:.R E-6INNA NUCLEAR POWER PLANT UN1T SHUTDOWN AND POWER REDUCTlONS DATIr Jm~
17, 1992
(:OMPLI:.1'IID IIY 0
ge REPORT hIONTH D~&ER 1991 Tl'-LIIPIIONI! 315-524-4446 ext. 396-Ginna Station-No.
Date c0 0 0 QX O~
C0 00tt:
~
ol <<0 0cv 0 <<0 own c 0O Licensee Event Report II" Em 0
III 00 ill
<<c0 uS 0
0 ll E
0 O
Cause gl Corrective Action to Prevent Recurrence
- No unit shutdowns or power reductions for this regort 'period.
F: Forced S:
Scheduled REV. 4/S $
4949 Reason:
A-Equipmcnt.Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction'&pcrator Training 8t License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) hlethod:
14lanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
C NARRATIVE
SUMMARY
.OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT - R.E. 'Ginna Nuclear Power Plant DATE Zanuar 17 1992 COMPLETED BY Robert
. Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH=
December 1991 1
The unit operated at approximately 974 reactor power level for the entire report period.