ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM e

t~~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9110220308 DOC.DATE: &3~~&. NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000244 R

SUBJECT:

Monthly operatin re t for Sept 1991 for RE Ginna Nuclear Power Plant.

911015 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCLf SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 D

RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DLQQ/~ 10 REGALE 0

EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D R

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LIS15 FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14 D

D

P I

~

f Jl 0

a a

. ( irwin y tzizziz I)iisisiIIrirrrr ROCHESTER GAS AND ELECTRIC CORPORATION o

( ~

~ 0 Irr srtv 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREOY Vlcc President Cinna Nuclear Production TELEPHONE AREACOOE 716 546-2700 GINNA STATION October 15, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for September, 1991 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1991.

Very truly yours, Robert C. Mecredy RCM/eeh Attachments cc:

Mr. Thomas T. Martin NRC (1)

'9110220303 910930 PDR ADOCK 05000244 PDR 6

4 ~

r

~

OPERATING DATA REPORT DOCKET NO.

50-244 DATE October 15 1991 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1 ~

2.

3.

4, 5.-

6.

70 8.

'1 Unit Name:

R.E.

GINNA NUCLEAR POWER PLANT Reporting Period:

S terber 1991 Licensed Thermal Power (MWt):

Nameplate Rating (Gross MWe):

Design Electrical Rating (Net MWe):

Maxinun Dependable Capacity (Gross MWe):

Maximus Dependable Capacity (Net MWe):

If Changes Occur in Capacity Ratings (Items Notes:

The unit operated at approximately 97K reactor power level, except for the event detailed on page 4 of this report.

1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 11

'2.

13.

14

'5.

16.

17.

18.

19.

20

'1.

22.

23.

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 720 720 720 0

1 049 792 349 990 332 225 100K 100K 98.18K

.18K OX 6 551 5 382.65 5 328.25 7 590 832 2 555 902 2 426 249 81.33K 81.33K 78.80K 78.80K

.55K 191 897.45 151 121.96 1 687.55 148 496.63 8 5 209 941 529 69 218 376 65 695 542 77.55K 77.55K 74.244 74.24K 6.14K 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin and Maintenance Outa e:

Startin March 27 1992 Duration: 40 da s

,25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

05.10.91 26.

Units In Test Status (Prior to Comnerciai Operation):

Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

  • CUMULATIVETOTAL COMMENCIHG JANUARY 1, 1975

t t

AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE October 15 1991 COMPLETED BY obert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Se tember 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 461 17 ~

463 2 ~

466 18 ~

463 3

~

471 19

~

465 4 ~

436 20.

465 5 ~

299 21 ~

465 6 ~

463 22'65 7 ~

464 23'66 8.

9.

10.

12.

13

'4

~

15.

16.

464 464 464 462 463 463 464 468 464 24.

25.

26.

27.

28.

29.

30

'1.

466 467 468 469 470 469 470 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE October 1991 COMPLETED BY C

obert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH Se tember 1991 The unit operated at approximately 974 reactor power level, with the exception detailed below.

On September 4I 1991, at approximately

2030, load decrease commenced from 974 due to a service water leak to the oil cooler for the,A Main Feedwater Pump.

The cooler was replaced

'-.and the oili;was~f1ushed out. '-Reactor, power.-1evel'..was.back to 974 on ---=,

Septemb'er 5, 1991'atapproximate1y 1900';

Pi 4

'I k

UNIT SHUTDOWN AND POWER REDUCTIONS

~

DO( Kl T NO SO 244 liNITNAMl:R E. GINNA NUCLEAR POWER PLANT l)ATl:.

(:OMPLETl:n BY C

Robert E. Dodge q I:.Ll:PHoNI:

315-524-4446 ext.

396 Ho.,

Date 0

I o o ot c0 IAoO cY I

eo0 c v 5

oat c o

Licensee Event Report 5

Ew 5

0 vl uo IA cO Lti c

Q E o CJ Cause 8L Corrective Action to Prevent Recurrence 91-7 9/4/91 F

22.50 A

WA

~ reduction due to service water leak to oil cooler for the A Main Feedwater Pump.

The cooler was replaced and the: Ã1 was-f1ushed t

.OU 1

F: Forced S:

Scheduled REV. 4SS 4949 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Tesc C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)

Hither (Explain) 3 Method:

14fanual 2-Manual Scram.

3-Automatic Scram.

4-Ocher (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

I

~

~ l'