A@C(.ELERATED DISTRIBUTION DEMON/RATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFXLXATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPXENT AFFILIATXON DOCKET 05000244 R
SUBJECT:
Monthly operatin re t for June 1991 for RE Ginna Nuclear Power Plant.
1 15 r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
! ENCL g SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
D 05000244
/
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DLP~~PEB3. 0 REG '%
EXTERNAL EG&G BRYCE E J H
NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGNl NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
0 tg
0 tt zrnrzz rnizzz ROCHESTER GAS AND ELECTRIC CORPORATION o
ROBERT G MECREDY Vlcc President Clnna Nuctear Production 89 EAST AVENUE, ROCHESTER N.K 14649-0001 TELEPHONE AREA CODE 71B 546 2700 GINNA STATION July 15, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for June, 1991 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1991.
Very truly yours, Robert C. Mecred RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1) 9i07t90i47 Pi06 '0
,, j,DR <<,",ADOCK 05000244 j~.R)V4
~
I t'
~
OPERATING STATUS 0
OPERATING DATA REPORT DOCKET NO.
50.244 DATE Jul 15 1991 COMPLETED BY obert E ~ Dodge TELEPHONE 315 524.4446 ext. 396 1 ~
2.
3.
4 ~
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
June 1991 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maximus Dependable Capacity (Gross MWe):
Maxfmun Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approximately 100'/ reactor power level for the entire report period.
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumiat 1 ve 11 ~
12.
13 ~
14.
15.
16.
17.
18.
19.
20
'1.
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On. Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity, Factor (Using DER Net)
Unit Forced Outage Rate 720 720 720 1 065 760 360 011 342 367 100K 100K 101.17/
101.17X 4 343 3 174.65 3 143 4 418 130 1 500 094 1 424 458 72.37K 72.37K 69.78K 69.78K 0.21K 189 689.45 148 193.96 1 687.55 146 311.38 8.5 206 768 827 68 162 568 64 693 751 6.21K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Start~:
05-10-91 26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATIOH
- CUMULATIVETOTAL COMMENCING JANUARY 1, 1975
2 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Jul 15 1991 COMPLETED BY Robert E.
Dod e TELEPHONE 1
315 524-4446 ext.
396 MONTH June 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
475 17
~
469 2 ~
476 18 ~
470 3
~
4 ~
475 476 19.
20.
472 468 5.
474 21.
467 6.
475 22'73 7 ~
475 23'79 8.
474 24'78 9 ~
473 25 ~
477 10'72 26.
476 471 27'74 12'72 28.
470 13
~
471 29.
470
,14 ~
471 30.
473 15.
472 16'72 INSTRUCTIONS 31.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DO(:KI:.'I'O.
SO 244 liNITNAMI:R.E. 6INNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DAT
(:Oh(PLI'.TED BY ge REPORT hIONTH I'I'.Lf:.PIIONI:. 315-524-4446 e)et.
396 Ginna Station No.
Date 0
t-c ~
0 e 0 o 4 ~
c0 00 txl e>>0 c 0 0>>
0 own c 04 Licensee Event Report 0
Ew 0
tA (J c0 Q) c 0
0 EO CJ Cause 8a Corrective Action to Prevent Recurrence No un'.t shutdowns or power reductions this report period.
1 F: Forced S:
Scheduled REV. 4199 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlethod:
l*fanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
1
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Jul 1991 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH June 1991 The unit operated at approximately 1004 reactor power level for the entire report period.