DOCKI".I'O.

>>-244 UNlTNAMI:R.E. GINNA NUCLEAR POWER PLAN%'NIT SHUTDOWN AND POWER REDUCTiONS COhiP Ll'.TED 13Y bert E.

ge+

REPORT hiONTH 1 I LIIPHONI:

315-524-4446 ext.

396 anna a son a3W4)

RO EO ON AQi r.o i

gw OO li OO'

-OON

'3NO No.

91-3 Date 5/1 5/11 00 sy 0P 0

O ~

CV C0 IX S

247.25 C

en0 0Cv 0

0V) L Cl Licensee Event Report h

Ew 0

Vl 0 Vl O IA 00 0

0 E

0 O

Cou se g4 Corrective Action to Prevent Recurrence The unit was shutdown for Annual Refueling and Maintenance.

The unit went on line 5/11/91 at 0715 hours0.00828 days <br />0.199 hours <br />0.00118 weeks <br />2.720575e-4 months <br />.

91-4 5/12 6.52 A

INSTRU The unit went off line due to EHC Fluid Leak.

91-5 5/25 6.5 INSTRU Power reduction due to EH Malfunction.

F: Forced S:

Scheduled Rtv. 4/89 4949 Reason:

A-Equipment Failure (Explain)

B41aintenance or Test C-Refueling D-Regulatory Restriction

'-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Ocher (Explain) hfechod:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Ocher (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

~

NARRATXVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE one 20 1991 COMPLETED BY Robert E.

Dodg TELEPHONE 1

315 524-4446 ext.

396 MONTH Ma 1991 The unit was placed on line May 11, 1991 at 0715 hours0.00828 days <br />0.199 hours <br />0.00118 weeks <br />2.720575e-4 months <br /> following the Annual Refueling and Maintenance Outage.

On May 12, 1991 at 0022 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, the unit went off line due to an EHC fluid leak.

On May 12, 1991 at 0653 hours0.00756 days <br />0.181 hours <br />0.00108 weeks <br />2.484665e-4 months <br /> the unit was placed back on line and remained on line for the remainder of the report period.

On May 25, 1991 there was a power reduction due to an EH malfunc-tion.