ML17262A506

From kanterella
Jump to navigation Jump to search
Amend 43 to License DPR-18,revising Tech Specs to Renumber Radiation Monitor from R-20 to R-20A,to Add Radiation Monitor R-20B to Tables 3.5-5 & 4.1-5 as Item L.G & Add Triple Asterik to R-14A
ML17262A506
Person / Time
Site: Ginna 
Issue date: 06/04/1991
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17262A507 List:
References
NUDOCS 9106070297
Download: ML17262A506 (6)


Text

~

~p,R RE'Cy Wp

+

0)0

<<)

qO

+>>*<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555 ROCHESTER-GAS=AND-ELECTRIC.CORPORATION DOCKET.NO,-50-244 R).E;-GINNA-NUCLEAR-POWER -PLANT AMENDMENT.TQ-FACILITY OPERATING. LICENSE Amendment No.

43 License No.

OPR-18 1.

The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Rochester Gas and Electric Corporation (the licensee) dated February 15, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance:

(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; O.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

OPR-18 is hereby amended to read as follows:

(2)

Technical -S ecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 43, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

910b070297 910b04 PDR ADOCI( 05000244 P

PDR

3.

This license amendment is eff'ective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION owW Richard

Wessman, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

~une 4

ATTACHMENT-TO-L ICENSE.-AMENDMENT-NOs-4.--

F'ACILITY-OPERATING.L.IGENSE-NOe -DPR-18 DOCKET-NO. 244 Replace the following pages of the Appendix A Technical Specifications with the attached pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Remeve 3.5-20 3.5-20a 4.1-12 Eesese 3.5-20 3.5-20a 4.1-12

~

~

Table 3.5-5 Radioactive Effluent Monxtorin Instrumentation Minimum Channels

~Qerehle Action Gross Activity Monitors (Liquid) a ~

b.

c e.

Liquid Radwaste (R-18)

Steam Generator Blowdown (R-19)

Turbine Building Floor Drains (R-21)

High Conductivity Waste (R-22)

Containment Fan Coolers (R-16)

Spent Fuel Pool Heat Exchanger A Loop (R-20A)

L+++

Spent Fuel Pool Heat Exchanger B Loop (R-2QB)

L+++

2 ~

Plant Ventilation a ~

Without Mini-Purge 2 ~

3.

Noble Gas Activity (R-14)

(Providing Alarm and Isolation of Gas Decay Tanks)

Particulate Sampler (R-13)

Iodine Sampler (R-10B or R-14A***)

4 5st b.

With Mini-Purge 1.

2 e 3.

4 ~

Noble Gas Activity (R-141 Particulate Sampler (R-13)

Iodine Sampler (R-10B or R-14A+**)

Noble Gas Activity (R-12) or Particulate Sampler (R-11)

L L

L 1H.

4 5

5 f

8 3 ~

Shutdown Purge a.

Noble Gas Activity (R-12) b.

Particulate Sampler (R-11) 3.5-20 Amendment No. N, R9, 43

Minimum Channels

~oetanle Action 4.

5.

c.

Xodine Sampler (R-10A or R-12A++*)

Air E]ector Monitor (R-15 oi R-15A*+*)

Waste Gas System Oxygen Monitor Not required when Steam Generator Blowdown is being Tecycled (i.e.

not released).

Required only during shutdown purges and required to sample the containment stack.

Required to sample containment during mini-purge operation.

Not required during Cold or Refueling Shutdown.

Also see Table 3.5-6.

. Applicable when Heat Exchanger in service.

3. 5-20a Amendment No. gp, 43

Table 4.1-5 e

Radioactive Effluent Monitorin Surveillance R

irements instrument Channel Source Functional Channel.

Check Check Test Calibration c.

Turbine Building Floor Drains (R-21) d.

High Conductivity Waste (R-22)

D(7)

D(7)

Gross Activity Monitor <Liquid) a.

Liquid Rad Waste (R-18)

D(7) b.

Steam Generator Blowdown (R-19) D(7)

M(4)

Q(1)

M(4)

Q(1)

M(4)

Q(1)

M<4)

Q(1)

R(5)

R(5)

R(5)

R(5) 2 ~

e.

Containment Fan Coolers (R-18) f.

Spent, Fuel Pool Heat Exchanger A Loop (R-20A) g.

Spent Fuel Pool. Heat Exchanger B Loop (R-20B)

Plant Ventilation D(7)

D(7)

D(7)

M(4)

Q(2)

M(4)

Q(2)

M(4)

Q(2)

R(5)

R(5)

R(5) a.

b.

Noble Gas Activity (R-14)

(Alarm and Isolation of

~ Gas Decay Tanks)

Particulate Sampler (R-13)

D(7)

W(7)

N.A.

N.A.

R('5)

R(5) 3.

c.

Iodine Sampler (R-10B and R-14h) d.

Flow Rate Determination Containment Purge a.

Noble Gas Activity (R-12) b.

Particulate hler (R-11) c.

Xodine Sampler (R-lOA and R-12A)

W<7)

N.A.

D(7)

W(7)

W(7)

N.A.

N.A.

PR N.A.

N.A.

N.A.

Q(1)

Q(1)

R(5)

R(6) d.

Plow Rate Determination N.A.

N.A.

N.A.

4.

5.

Air Effector Monitor (R-15 and R-15A)

Waste Gas System Oxygen Monitor D(7)

M(2)

N.A.

N.A.

R('s )

Q] sl Main Steam Lines (R-31 and R-32)

M N.A.

4.1-12 Amendment No. P, 43