ML17262A445
| ML17262A445 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/31/1991 |
| From: | Dodge R, Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9104250128 | |
| Download: ML17262A445 (10) | |
Text
ACCELERATED DISTRIBUTION DEMONSTPWTION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9104250128 DOC.DATE:
9 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit, 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas 6 Electric Corp.
MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 R
SUBJECT:
Monthly operat e t for Mar 1991 for RE Ginna Nuclear Power Plant.
910418 r.
DISTRIBUTION CODE:
IE24 COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/OBBQ/-
EB10 REG FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
I
~
~
1 V
~
~
t zan>p'z' szzizsz zti7 u(
uxwsizz ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT t MECREDY Vice President Clnna Nudear Production
%Mr OMIT o
89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 TELEPHONE AAEACOOET to 546-2700 use GINNA STATION April 18, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for March, 1991 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1991.
Very truly yours, RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1) r 9i04250i28 9i033i PDR ADOCK 05000244 R
PDR ZEQP
//]
~
s
~
r 1'I 4
OPERATING DATA REPORT DOCKET NO.
50-244 DATE A r 18 199 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1 ~
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR POWER PLANT Reporting Period:
March 1991 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maxima Dependable Capacity (Gross MWe):
Maximrn Dependable Capacity (Net We):
If Changes Occur in Capacity Ratings (Items Notes:
The unit was shutdown on March 22, 1991 for the Annual intenance ned shutdown e report 1520 Refueling and Ma 490 Outage and remai 470 at the end of th 490 period.
470 Hunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to.Date Cumlative 11
'2.
13.
14 ~
15 ~
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Het)
Unit Forced Outage Rate 517.23 516.75 668 083 228 026 215 761 69.46K 69.46K 61.70K 61.70K 0
2 160 1 933.23 1 932.75 2 753 088 938 665 891 990 89.48K 89.48K 87.86K 87.86K 0
187 506.45 147 672.54 1 687.55 145 101.13 8.5 205 103 785 67 601 139 64 161 283 78.31K 78.31K 74.24K 74.24K 6.20K 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
- CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE A ril 18 1991 COMPLETED BY R bert E.
Dod e TELEPHONE 1
315 524-4446 ext.
396 MONTH March 1991 DAY AVERAGE DAILY POWER LEVIX (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2.
3.
479 479 479 17
~
18.
19.
421 414 403 4 ~
388 20.
401 5.
362 21.
399 6.
417 22.
7.
335 23.
-10 8.
391 24.
9.
428 25.
-10 10.
449 26.
450 27.
5>>
12.
445 28.
13.
14.
440 435 29.
r 30.
15.
430 31 ~
16.
426 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
1
DO(:KI'.T NO.
UNITNAhil:. R E. GINNA NUCLEAR POWER UNIT SHUTDOWN AND POWER REDU(:TIONS DA1F
(:OhiPLI'.TI'.D HY REPORT MONTH MARCH 1991 obert E.
Dodge 1 I:LEPllONI:
315-524-4446 ext.
396 Ginna Station C
~.
PLANT No.
Date 0
0
~
0 C0 00 IX Pl I
4-e~0 E 0 0
4
> CL OV)
C 0tl I icensee Event Report It Em 0
Vl C0 Ill 0
0 0
0 E
0 O
Cause L Correct>ve Action to Prevent Recurrence 91-2 03-04-91 03-"07-91 F
35 hrs H
F..
34 hrs H
91-002 EA TRANSF TRANSF Loss of power to Safeguard Buses 14 and 18 due to loss of offsite power 34.5KV circuit 751.
Circuit 751 was lost due to RGSE system disturbance caused by a major ice storm.
91-3 03-22-91 The unit was shutdown on March 22, 1991 for Annual Refueling and Haintenance.
It remained shutdown at the end of the report period.
F: Forced St Scheduled REV. 4/SS 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
Hither (Explain) 3 Method:
1-hianual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OP OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE A ril 1991 COMPLETED BY R bert E.
Dodg TELEPHONE 1
315 524-4446 ext.
396 MONTH March 1991 Turbine runbacks occurred on March 4, 1991 at 0148 hours0.00171 days <br />0.0411 hours <br />2.44709e-4 weeks <br />5.6314e-5 months <br /> and again on March 7, 1991 at 0248 hours0.00287 days <br />0.0689 hours <br />4.100529e-4 weeks <br />9.4364e-5 months <br />.
The cause of the events was the loss of power to Safeguards buses 14 and 18 due to loss of offsite power 34.5KV circuit 751 during a major ice storm.
The plant returned to full power but began a coastdown on 3/11/91 upon reaching equilibrium conditions.
The unit was shutdown on March 22, 1991 for Annual Refueling and Maintenance. 't remained shutdown at the end of the report period.
V
~
~