ACCELERATED DI RIBUTION DEMONSTB TION SYSTEM t
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9011260138 DOC.DAT 0
1 NOTARIZED-NO DOCKET, 8 FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFILIATION
~ DODGE,R.E.
Rochester Gas
& Electric Corp.
MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operatin t for Oct 1990 for RE Ginna Nuclear Power Plant 1115 tr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR t
ENCL L SIZE'ITLE:
Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
D 05000244 A
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA ADV RE FILE Ol EXTERNAL EG&G BRYCE iJ ~ H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10 RGN1 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D 8
R NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL 15 D
D
I 4
~
'ti 'I'IIrI
'II I I1Zuu ROCHESTER GAS AND ELECTRIC CORPORATION o
rrER Laa ~ 0 i@a rr
'YORK Era'YE 89 EAST AVENUE, ROCHESTER N. Y. 14649.0001 ROBERT C MECREDY Vice President Ctnna Nuclear Productton TELEPt tONE AREACOOE7tB 546 2700 GINNA STATION November 15, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for October, 1990 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
~
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1990.
Very truly yours, Robert C. Mecred RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1)
( 'r r26pt3Er rpr p3t rY rroocK pBooo2ze PDC
'I
~
C l
'~
c l
~ t OPERATING DATA REPORT DOCKET NO.
50.244 DATE Nov r 15 1990 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1 ~
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR P(NER PLANT Reporting Period:
October 1990 Licensed Thermal Power (MWt):
Nanepiate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Maximus Dependable Capacity (Gross MWe):
Maximm Dependable Capacity (Het We):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approximately 97K power level for the entire report period.
1520 490 470 490 470 Hunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Het MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cwuiative 11.
12.
13.
14 ~
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours In Report Period Nunbnr of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On. Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Het)
Unit Capacity Factor (Using DER Het)
Unit Forced Outage Rate 74 +*
745 745 1 093 051 372 965 354 921 100
'100 101.36 101.36 7 296 6 145 81 6 106.75 8 956 999 3 024 531 2 876 455 83.70 83.70 83.88 83.88 1.74 183 480 44 491.95 1 687.55 141 948 13 8.5 200 579 449 66 057 876 62 694 368 77.36 77.37 77.12 77 12 6.17 24'hutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refuelin and Maintenance Shutdown:
March 1991
- 30 da s 25'fShut Down At End Of Report Period, Estimated Date of Start~:
May 7, 1990 26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved IHITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
"*CHANGE FROM EASTERH DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME
445
~
Cl
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novemb 15 990 COMPLETED BY Robert E.
Dod e MONTH October 1990 TELEPHONE 1
315 524-4446 ext.
396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
472 17'76 2 ~
473 18.
477 3 ~
474 19'77 4 ~
474 20.
477 5.
474 21.
478 6.
7 ~
474 474 22
'3'79 479 8.
474 24'79 9.
10.
12.
'13.
474 477 477 477 477 25.
26.
27
'8
'9'78 478 479 479 478 14.
476 30.
477 15.
476 31.
478 16.
477 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
1 r
~
I
~ &
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH OCTOBER 1990 1)O(:KEI NO.
50 244 1iNll NAMl: R E. GINNA NUCLEAR POWER 1)ATF 5 g
( OhlPLl'l'I D I3Y rt E. Dodge
'I;PIIQNf; 315-524-4446 x-396 Ginna Station PLANT Ho.
Date 0
1-
.o e
o o O~
c0 CIo CL L
me0 c v o
ocn c E
0 CI Licensee Event Report 0
Em 0
IA o lA cIQl c0 Qgo o
Cause K Correct>ve Action to Prevent Recurrence
.No unit shutdowns or power reduction this report period.
1 F: Forced S:
Scheduled Rtv. 419S 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)
Hther (Explain) 3 Method:
1-hlanua1 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
~
I
.I
~
~
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 11 DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novembe 15 1990 COMPLETED BY bert E.
Dodg TELEPHONE 1
315 524-4446 ext.
396 MONTH October 1990 The unit operated at approximately 974 reactor power level for the entire report period.
~
V 0'
v