ML17262A211

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License Renewal
ML17262A211
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/12/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-55FR29043, FRN-56FR64943, RULE-PR-2, RULE-PR-50, RULE-PR-54 55FR29043-00101, 55FR29043-101, AD04-2-154, AD4-2, AD4-2-154, NUDOCS 9011060067
Download: ML17262A211 (10)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSIOH NBR:9011060067 DOC.DATE: 90/10/12 NOTARIZED: NO DOCKET FACIL:VO-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas a Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Office of the Secretary of the Commission

SUBJECT:

Comment supporting proposed rules 10CFR2,50 6 54 re nuclear power plant license renewal.

DISTRIBUTION CODE: DSlOD COPIES RECEIVED:LTR ENCL SIZE:

TITLE: SECY/DSB Dist: Public Comment on Proposed Rule (PR)-10CFR NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: ADM/FIPS/RPB NMSS/IMOB OGC/DR 15-B-18 OGC/SAIP15-B-18 RES DIR EXTERNAL: NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED: LTTR 7 ENCL

II DDDtt UMBER ufrrrrrrrfrtlere Prprr(r,irrffr PRDPDonD RULE N A~i e

  • 29rs + e ~ ~

~ rts r,"-r',

~ ~

eo

'\ i'J(,K iL0 rr USNi',0 st re ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N.K 14649-0001 ROBERT C. MECREDY '90 OCT 23 P2:56 ~LEONE Vice President AREA CODE 716 546.2700

@inn@ Nuctear Production October 12, 1990."3C: 0PSEt"iitlAtt~n isOGK;". ltiu A St-fr Vlf;f'3i<ANC4 Mr Samuel J. Chilk Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Docketing and Service Branch

SUBJECT:

Notice of Proposed Rulemaking:

Nuclear Power Plant License Renewal 55 Fed. Re . 29 043 (Jul 17 1990)

Dear Mr. Chilk:

In accordance with the above-referenced Notice of Proposed Rulemaking (the Notice), the Rochester Gas and Electric Corporation hereby submits the following comments and, as well, fully endorses the NUMARC comments being submitted on this matter. We appreciate this opportunity to express our views on the promulgation of a regulation to govern the renewal of nuclear power plant licenses.

-We:,generally support the proposed regulation and urge the it

~

NRC to promulgate with the modifications proposed in the NUMARC comment letter. In particular, we support the use of the current licensing basis (CLB) for a nuclear power plant to renew its license; we also support the applicability of the backfitting rule to license renewals. However, we share the concerns expressed in the NUMARC submittal regarding the definition of current licensing basis and whether an application for a renewed license should require an Integrated Plant Assessment (IPA) on the scale that is presently contemplated.

The proposed CLB definition appears to freeze the CLB during the pendency of license renewal applications before the NRC. CLBs continuously change over time to accommodate changing safety information and regulations. Such a moratorium could cause unwarranted shutdowns and discourage utilities from the license renewal option.

90ii060067 90iOi2 PDR PR 2 55FR29043 PDR

The IPA contained in Section 5.4.2.1(a) of the proposed rule requires age-related degradation of the facility's systems, structures, and components (SSCs) to be identified, evaluated, and accounted for as needed to assure the facility's licensing basis will be maintained throughout the renewed term. We share NUMARC's concern regarding the scope of SSCs to be evaluated. We feel they may be interpreted too broadly and the depth of evaluations to be performed on components making up systems is more extensive than necessary to support the finding that aging is being managed during the renewal term.

We believe this issue to be important to the nation and congratulate the NRC on the diligence in the development of this rulemaking.

Very truly yours, Robert C. Mecredy BASi086 xc: Mr. Allen R. Johnson (Mail Stop 14D1)

Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475" A1lendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

(go REGULATOR NFORMATION DISTRIBUTION TEM

':

DOCKET NBR: p5p-244 Re Ginna 1 DOC DATE: 781006 RECIPIENT: ACCESSION NBR- 7810170213 ORIGINATOR: COPIES RECEIVED:

COMPANY NAME:

  • q LTR . 1 .ENCL

SUBJECT:

'IZE: 1 + 5 Forwards Monthl 0 er Re t for Se 't,'978.

DISTRI BUT ION CODE, ! ADO'*

DISTRIBUTION TITLE t ANNU4Li SEHI 4NNUAL 8 MONTHLY OPERATING RPTS (OL STAGE)

NAHF ENCL2 FOR ACTION SR 4t/6 ENCL ORB52 BC w/ENCL NRC PAR W/ENCL I Il E 8/2, FNCI MIPC w/2 ENCL HAhIAUER 'W/ENCL DIRECTOR DDR w/ENCL AD FOR SYS L PROD Iv/ENCL ENGINEERING BR w/ENCL, REACThR SAFETY HR w/ENCL PLANT SYSTEHS BR w/ENCL EE8 w/ENCL CORE PERFORHANCE BR W/ENCL EFFLUENT TRE4T SYS W/ENCL LPDR w/ENCL NATL I AB w/ENCL TERA w/ENCL

~ )

NSIC w/ENCL'/ENCI. ) ~

BROOKHAVEN ACRS '4/15'NCL TOTAL NUHBER OF COP I ES REQUIRED i LTR ENCI.

~

p

  • ~

1 ~

NOTES: r ~ )'

$ 978 Og go

'

~ - ~

g) r t t)tJ~

~,

)g r . ~ ~

~",a C ), g~r. r~):DA A ~)l

~w It

P(P

'pl 'lat E j, 'llklC ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TCLCPHONC ARCA COOC 710 546.2700 Ginna Station October 6, 1978 Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY GNMISSION Washington, D. C. 20555

Subject:

monthly Report for September, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1978.

Very truly yours, Bruce Snow Superintendent Attachments 7 g I ore o2-l3

1 CI