ML17262A175

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Design Analysis EWR 4525-1, Fault Current Analysis of Power Distribution Sys & Rev 1 to Design Analysis EWR 4525-2, Adequacy of Electric Sys.... NRC Will Be Notified of Util Intended Corrective Action by 901030
Date released: 04/30/2018 Download: ML17262A175


Rev 1 to Design Analysis EWR 4525-2, Adequacy of Electric Sys Voltages.
ML17262A178
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/24/1990
From: Swift P
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17262A178 (218)
Rev 1 to Design Analysis EWR 4525-1, Fault Current Analysis of Power Distribution Sys.
ML17262A177
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/27/1990
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17262A177 (88)
Voltage Simulation for Case EOF LOC4 LOCA Simulation for 50/50 Mode - Circuit 767 Details 12B Transformer Feeding Bus 12B.
ML17262A176
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/30/1990
From: Swift P
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17262A176 (5)
Forwards Rev 1 to Design Analysis EWR 4525-1, Fault Current Analysis of Power Distribution Sys & Rev 1 to Design Analysis EWR 4525-2, Adequacy of Electric Sys.... NRC Will Be Notified of Util Intended Corrective Action by 901030
ML17262A174
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/20/1990
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
Office of Nuclear Reactor Regulation
References
Download: ML17262A174 (7)