ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM I,'s REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9009260068 DOC.DATE: 90/08/31 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.
Rochester Gas S Electric Corp.
MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244
SUBJECT:
Monthly operating rept for Aug 1990 for RE Ginna Nuclear Power Plant.W/900919 ltr.
DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN1 EXTERNAL: EGRG BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 2
2 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR BQ PEB10 G F 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 16
rT ZZR8'/ESIII
~ zzgj(zr lwzuizt illeuiAI Irezr ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C. MECREDY trIce Prerldent Cinna Nuclear Productton o
89 EAST AVENUE, ROCHESTER N.Y. 14649.0001 1
TELEPHONE AREACODE 718 546 2700 GINNA STATION September 19, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for August, 1990 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1990.
Very truly yours, Robert C. Mecr dy RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1) 9OO92~o 6K 05OOO244
8 90083<
ADOCK pDC r A
OPERATING DATA REPORT DOCKET NO.
50.244 DATE Se t r 19 1990 COMPLETED BY Robert E.
D ge OPERATING STATUS TELEPHONE 315 524.4446 ext. 396 1 ~
2.
3.
4.
5.
6.
7.
8.
Unit Name:
R.E.
GINNA NUCLEAR P(NER PLANT Reporting Period:
A ust 1990 Licensed Thermal Power (MWt):
Nameplate Rating (Gross MWe):
Design Electrical Rating (Net MWe):
Hexing Dependable Capacity (Gross We):
Maxlmm Dependable Capacity (Net MWe):
If Changes Occur in Capacity Ratings (Items Notes:
The unit operated at approximately 100K reactor power level for the entire report period.
1520 490 470 490 470 Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cwuiat ive 11
'2.
13 ~
14.
15.
16.
17.
18.
19.
20.
21 ~
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On. Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (HWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Het)
Unit Forced Outage Rate 744 744 1 098 437 366 461 348 305 100 100 99.61 99.61 5 831 4 737.84 4 704.5 6 904 865 2 329 030 2 214 993 80.68 80.68 80.82 80.82
.96 182 417.45 143 083.98 1 687.55 140 545.88 8.5 198 527 315 65 362 375 62 032 906 77.22 77.22 73.82 73.82 6.18 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Annual Refuelin and Maintenance Shutdown:
March 1991 25.
If Shut Down At Erd Of Report Period, Estimated Date of Startup:
Hay 7, 1990 26.
Units In Test Status (Prior to Comnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
<<CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
V V
AVERAGE DAXLY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE Se tern er 19 1990 COMPLETED BY obert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Au ust 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2 ~
3 ~
4 ~
5.
6.
7 ~
8.
9 ~
10
'61 461 461 461 461 461 460 460 460 460 461 17 ~
18.
19 ~
20.
21 ~
22
'3.
24
'5.
26.
27
'61 460 470 478 478 478 478 478 473 468 467 12'59 28'65 13.
459 29'66 14.
461 30 ~
466 15.
16.
461 460 31.
465 INSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I)O(:Kl'.T NO.
UNITNAMI..R.E. 6INNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS IiA" I':OhIPLETED 13Y rt E. Dodge REPORT hlONTH Tl:LEPIIONI: 315-524-4446 x-396 Ginna Station No.
Dote
.o o4o ooK c0 oO Pl Cn o-0 c v D
SEA c X
0 Cl I icensee Event Report II Em P
e vl co tA c0 LC) c E
0 EJ Cause L Corrective Action to Prevent Recurrence No unit shutdowns or power reductions during the report per3.od ~
F: Forced S:
Scheduled Atv. 4/89 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction'-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hlethod:
I-hlanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Se te r 1 1990 COMPLETED BY Robert E.
Dodge TELEPHONE 1
315 524-4446 ext.
396 MONTH Au ust 1990 The unit operated at 1004 reactor power level for the entire report period.