Monthly Operating Rept for May 1990 for Re Ginna Nuclear Power Plant
ML17261B075
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1990
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006250339
Download: ML17261B075 (8)


Text

ACCELERATED DL~TPJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DXSTRXBUTXON SYSTEM (RIDS)

ACCESSION NBR:9006250339 DOC.DATE: 90/06/15 NOTARIZED: NO FACIL:50-244 Robert Emmet, Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244 R

SUBJECT:

Monthly era rept for May 1990 for RE Ginna Nuclear Plant.

/900615 tr.

DISTRIBUTION CODE:

IE24D COPXES RECEIVED:LTR Q ENCL SIZE TXTLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244

/

RECXPIENT ID CODE/NAME PDl-3 LA JOHNSON,A COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1

1 D

D INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEABll RGNl 1

1 AEOD/DSP/TPAB 2

2 BR/DLBQ J PEB10 1

1 REG-,F- -

Ol 1

1 1

1 1

1 1

1 EXTERNAL: EG&G STUART,V.A NRC PDR 1

1 1

1 LPDR NSIC 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 17 D

D

rzrzz zrum lk1l 4%lb ~

i'i7z ri izzisz 8Z:::

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TKLKPHONK ARKA COOK 710 546 2700 GINNA STATION June 15, 1990 US Nuclear Regulatory Commission Document Control Desk Nashington, DC 20555

Subject:

Monthly Report for May, 1990 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1990.

Very truly yours, Robert C. Mecre y Division Manager Nuclear Production RCM/eeh Attachments cc:

Mr..Thomas T. Martin NRC (1)

~'

9006250339 9'00574 PDR ADCICK 05000~44 R

PDC

J A

OPERATING DATA REPORT DOCKET NO.

50-244 DATE J

5 1990 COMPLETED BY Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1.

2.

3.

4.

5.

6.

7.

8.

Unit Name:

R.E.

GIHNA NUCLEAR POWER PLANT Reporting Period:

Ma 1990 Licensed Thermal Power (MWt):

Hameplate Rating (Gross MWe):

Design Electrical Rating (Het MWe):

Maximun Dependable Capacity (Gross MWe):

Maximurr Dependable Capacity (Net MWe):

If Changes Occur in Capacity Ratings (Items 1520 490 470 490 470 Nunber 3 Through Notes:

The uriit was placed on line May 7 at 1930 following the annual Refueling and Mainten-ance Outage.

The unit suffered a forced outage on May 10, which is detailed on Pg.

4 of this report.

7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr.-to-Date Curulative 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Avai labi lity Factor Unit Capacity Factor (Using MDC Het)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 744 587.34 558.25 769 318 262 129 248 835 75.03 75.03 71.16 71.16 3.83 3 623 2 549.41 2 519.75 3 695 542 1 249 942 1 189 042 69.55 69.55 69.83 69.83 179 807 140 895 55 1 687.55 138 361.13 8.5 195 317 992 64 283 287 61 006 955 76.95 76.95 73.50 73.50 6.26 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

May 7, 1990 26.

Units In Test Status (Prior to Conmerciai Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY

'OMMERCIAL OPERATION "CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975

    • EASTERN STANDARD TIME TO EASTERN DAYLIGHT SAVINGS TIME

4

+

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jun 5

1 90 COMPLETED BY Robert E.

odge TELEPHONE 1

315 524-4446 ext.

396 MONTH Ma 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.

482 2 ~

-14 18.

482 3

~

-14 19.

481

-13 20.

481 5.

6.

7 ~

8.

9.

10.

12.

13

'4.

-13

-13 147 313

-14 277 459 482 483 21.

22

'3.

24.

25 ~

26.

27

'8.

29.

30.

481 482 482 481 480 481 481 480 480 480 15.

482 31.

479 16.

482 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

Robert E.

g l ELEPllONE 315-524-4446 x-396 Ginna Station REPORT MONTH DD(:KET NO.

50 244 UNI']'AM):.R.E. GINNA NUCLEAR POWER PLANV UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhfPLETED BY

'C No.

Date 0

I

.0 e4 0 0 C0 00 IX 4

eo0 C 0 00 0IA C 0O Licensee Event Report I/

Ew 0

Ol 0 EA C0 I(1 0C 0

0 E IU U

Cause ft4 Corrective Action to Prevent Recurrence 5/1 5/7 S

163.5 The unit was shutdown for Annual Refueling and Maintenance.

The unit went online on 5/7 at 1930.

5/10 22.2 LZR 90-007 INSTRU Reactor trip due to Feedwater Controltler Malfunction.

1 F: Forced St Scheduled AEV. 4/89 4949 Reason:

A-Etluipmcnt Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 hfethod:

1-hfanual 2-hfanual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE June 1

199 COMPLETED BY

/

Robert E.

Dodg TELEPHONE 1

315 524-4446 ext.

396 MONTH Ma 1990 The unit was placed on line on May 7 at 1930 following the annual Refueling and Maintenance Outage.

On May 10 at 0219, the reactor tripped due to a feedwater con-troller malfunction.

The unit was placed on line on May 11 at 0030 and remained on line for the remainder of the report period.

gr t

,g~

~

v

'I