ML17261B008

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1990 for Re Ginna Nuclear Power Plant
ML17261B008
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/28/1990
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003220194
Download: ML17261B008 (10)


Text

ACCELERATED D UTION DEMONSTIRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9003220194 DOC.DAT NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFXLIATION DODGE,R.E.

Rochester Gas 6 Electric Corp.

MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000244 R

SUBJECT:

Monthly operati for Feb 1990 for RE Ginna Nuclear Power Plant.W 0315 lt DISTRIBUTION CODE:

IE24D S RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spe

~s NOTES:License Exp date in accordance with 10CFR2,2:109(9/19/72).

05000244 S

RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN1 EXTERNAL: EGGG SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1

'2 2

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NRR/DREP PRPB11 E

01 LPDR NSIC COPXES LTTR ENCL 1

1 1

1 1,

1 1

1 1

1 1,1 1

1 A

D S

R

.S

/

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS'! CONTACT THE,DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUXRED:

LTTR 19 ENCL 19

+y'

~ f I

p

'~i ~

s P

l~

~C

> g a'"

1

'Ilqq' U

4 e

I, II 1

k

'/Ill(///////I

/I/il SZ u>/'//I//////I

/

//I////

// //I/I//II//I/

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001

$ 0RR

$TAlE TER.EPHONE AREA CODE. 71'46-2700 GINNA STATION March 15, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for February, 1990 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of February, 1990.

Very truly yours, Robert C.

M cred Division Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1) p 90022 90P<2 0 19 K 050002<

QQQC pQC R

OPERATING DATA REPORT.

DOCKET NO.

March 15, 1990 COMPLETED BY Robert E.

Dod e

~ OPERATING STATUS TELEPHONE 315-524-4446 ext.

396

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

490

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

1520 470

l. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Notes This unit operated at approximately 100%

for the majority of this report period.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 178,002.45 139,762.14 1,687.55 137 257.38 8.5*

1,416 1,416 193, 740, 124 63,746,439 60,496,666 77.28 77.29 73.81 101.99 73.81 6.19 ll. Hours In Reporting Period 672

12. Number of Hours Reactor Was Critical 672 1,416
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0

0

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 341, 115 713,094
18. Net Electrical Energy Generated (MWH) 324,772 678,753
19. Unit Scrvicc Factor
20. Unit AvailabilityFactor 100 100
21. Unit Capacity Factor (Using MDC Net) 102.83
22. Unit Capacity Factor (Using.DER Net) 102. 83 101.99
23. Unit Forced Outage Rate 0

0

24. Shutdowns Scheduled Over Next 6 Months (Type,'" Date and Duration of Each):

Annual Refueling and Maintenance Shutdown - March 23, 1990

25. IfShut Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved "Cummulative total commencing January 1,

1975 RFV. 4/85 49 88

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE March 1990 COMPLETED BY R bert E.

Dod e TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH Februar 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

482.4 482.7 482.2 17

'8

~

19.

482.6 483.2 483.9 4 ~

5.

6.

7 ~

8 ~

9 ~

10

'2.

13.

482.5 482.0 483.4 483.6 483.4 483.6 482.8 482.6 481.9 482.8 20.

21.

22.

23

'4

'5

~

26.

27

'8

'9

'83.5 483.5 484.0 484.0 484.5 483.8 482.9 483.7 483.5 14.

15

'6.

482.3 482.7 483.3 30.

31.

INSTRUCTIONS On this format:, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest, whole megawatt.

C DO(:KET NO.

~0 244 IINITNAhIE. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDO'gN 4ND POWER REDUCTIONS DA1'I:.

(:OhtP LE1 ED BY o er ge REPORT MONTH 1990 TELEPIIONE 315-524-4446 t.

396 Ho.

Dote 0

~

0 C0 00 eo0 E

M0 own c 0

Cl Licensee Event Report tI Ew 0

0 0

lA C0 Itl C00 0

E 0

O Cause L Corrective Action to Prevent Recurrence No unit shutdown or power reduction this report period.

1 F: Forced S:

Scheduled REV. 419$

4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 hlethod:

1-Manual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

4 T

T" v

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE March 1

1990 COMPLETED BY obert E.

Dod e TELEPHONE 1

3 15 524-4446 EXT. 396 at Ginna MONTH Februar 1990 The unit operated at 100% reactor power level for the entire report period.

0 al C

l pw 4