| Site: | Ginna |
| Issue date: | 02/22/1990 |
| From: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rich Smith ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17261A973 | List: |
| References | |
| NUDOCS 9003050078 | |
| Download: ML17261A970 (4) | |
See also: IR 05000244/1989017
Text
FEB 2 2 $80
Docket
No
~ 50-244
Rochester
Gas
and Electric Corporation
ATTN:
Mr. Robert
E. Smith
Senior Vice President
49 East Avenue
Rochester,
14649
Gentlemen:
.
Subject:
Inspection
50-244/89-17
(12/12/89
1/08/90, 2/7/90)
This letter,forwards the
NRC report of routine safety inspection of the
R.
E. Ginna Nuclear
Power Plant from December
12,
1989 through January
8,
1989.
At the conclusion of the inspection,
Messrs.
C. Marschall
and
N. Perry of my
staff summarized
inspection findings with Mr. S.
Spector
and other members of
your staff.
The enclosed
report also documents
the February 7,
1990 management
meeting
between
the
NRC and the Rochester
Gas
and Electric Corporation
(RGIEE)
in King of Prussia,
As set forth in the enclosed
RG5E corporate
engineering
personnel
failed to promptly identify a safety injection system design defi-
ciency for prompt correction.
This violation involved ineffective communica-
tion (between
corporate
and site personnel),
which was also identified as
a
weakness
in NRC Systematic
Assessment
of Licensee
Performance
(SALP) Report
87-99.
In addition,
on December
15,
1989, safety injection system motor-
operated
valve maintenance
was performed with an inappropriate
torque specifi-
cation.
The associated
failure of several
levels of assuring cuality indicates
a weakness
in the control of safety-related
maintenance.
You are required to
respond to these violations as specified in Appendix A.
In your reply, please
specifically address
the repetitive nature of ineffective communications,
per-
manent corrective action for the safety injection system design deficiency,
and
programmatic
maintenance
considerations.
Thank you for your cooperation.
Sincerely,
Original Signed
By:
)on R. )ohnson
Jon
RE Johnson,
Chief
Projects,'Branch
No.
3
Division of Reactor Projects
OFFICIAL RECORD
COPY
IR GINNA 89-17 - 0001.0.0
02/20/90
~~~) (
Rochester
Gas
and Electric
Corporation
FEB 28890
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection
Report
Number 50-244/89-17
3.
NRC - REkE Management
Meeting Handouts
cc w/encl:
Harry H. Voigt, Esquire
Central
Records
(4 copies)
Director,
Power Division
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident Inspector
State of New, York, Department of Law
State of New York,
SLO Designee
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
E.
McCabe,
A. Johnson,
PD I-3,
J. Johnson,
J.
Dyer,
P. O'Reilly, AEOD
M. Conner,
DRP:RI
P
McCabe
ygxS
OFFICIAL RECORD
COPY
DRP: RI 'RP: RI
wwfrtag,js pj,/,/,.
2/12/90
J
son
IR GINNA 89-17 " 0002.0,0
02/14/90
l ~
h