Monthly Operating Rept for Jan 1989 for Re Ginna Nuclear Power Plant
ML17261A851
Person / Time
Site: Ginna 
Issue date: 01/31/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8902270392
Download: ML17261A851 (9)


Text

ACCELERATED DISCIBUTI ON DE MONSTRA+3N SY) TEN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8902270392 DOC.DATE: 89/01/31 NOTARIZED: NO DOCKET g

FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

'ECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera '-g r t for Jan 1989 for RE Ginna Nuclear Power Plant.

/890210 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

S 05000244 RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 5

5 INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 1

1 2

2 1

1 1

1 1

1 AEOD/DSP/TPAB

~

1 1

NRR/DLPQ/PEB 11 1

1 N

/~REB 10 1

1 EG FILE 1

1 EXTERNAL: EG&G SIMPSON, F LPDR NSIC 1

1 1

1 1

1 EG&G WILLIAMS,S NRC PDR 1

1 1

1 h

NOZE Lo ALL "RIDS" RECZPrEZZS.

PIZASE HELP US 'Io REDUCE HASTE.'XWI'ACZ 'XHE DOCUMENZ CXKZROL DESK, ROOM Pl-37 (EXT. 20079)

TO EIaTMZNATE YOUR K@K PBQM DISTIGBUTIGN ZZSTS H)R DOCUMENZS YOU DGNiT NEEDt D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

~

ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE. ROCHESTER, N.Y. 14649.0001

((.fOs Obl'>LA 4QQE l5 546

~ 7CA GZNNA STATION February 10, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Sub) ect:

Monthly Report for January, 1989 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

1, Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of January, 1989.

Very truly yours, Robert C.

M cred General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1)

OPERATING DATA REPORT DOCKET NO.

50 244 DATE February 10, 1989 COMPLETED BY Robert E.

Dod e

OPERATING STATUS 490 I ~ Unit Name:

R.E. 6INNA NUCLEAR POWER PLANT

2. Rcportln Period
January, 1989
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWc):

470

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

8 IfChanges Occur in Capacity Ratings (Items Number 3 TELFPHONF 315-524-4446 x-396 Gonna State.on Notes The reactor power level was maintained at 100%

for the majority of the report period with some exceptions detailed on page 3 and 4 of the repor Through 7) Since Last Report, Give Reasons.'.

Power Level to Which Restricted, If Any (Nct M'We):

10. Reasons For Restrictions, If Any:

This Month Yr..to-Date Cumulative 168,168 132r429.98 1,687.55 129,994.88 8 5*

183,032,111 60 158 999 57,086,553 77.30%

77.31%

77.63%

77.63%

6.36%

1989 45 - 55 da s

11. Hours In Reporting Period 744 744
12. Number of Hours Reactor Was Critical 732 0 37 73 2 ~ 37
13. Reactor Reserve Shutdown Hours
14. Ilours Gcncrator On-Line
15. Unit Reserve Shutdown Hours
16. Cross Thermal Energy Generate.d (MWH) 1, 061, 697 1, 061, 697

. 17. Gross Electrical Energy Generated (MWH)

I

18. Nct Flectrical Fnergy Generated (MWH) 342,095 342,095
19. Unit Service Factor 97.18%

97.18%

20. Unit Availability Factor 97.18%

97.18%

21. Unit Capacity Factor (Using MDC Net) 97.83%

97.'83%

22. Unit Capacity Factor (Using DER Net) 97.83%

97.83%

23. Unit Forced Outage Rate 2.82%

2.82%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin and Maintenance Shutdown March 17,

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMFRCIAL OPF RATION Forecast Achieved

  • Cummulative total commencing January 1,

1975 8902270392 890131 PDR ADOCK 05000244 R

PDC AEV.

bS 98b~~

f(

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Pebru 10 1989 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH Janua 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

4 ~

5.

6.

7 ~

8.

9.

10

'91 490 491 491 491 491 491 491 491 491 17.

18.

19.

20.

21 ~

22

'3.

24.

. 25.

26.

490 491 491 491 300 105 352 489 489 490 12.

491 490 27.

28'90 490 13'9.

490 14'91 30.

489 15.

491 31.

485 16.

490 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

C l)O('.KI:T NO 50-244 I/NITNAMI.. R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS I)Ag E Fe uar 10, 1989

(:OMPLI'.Tl(D BY Robert E.

Dodge REPORT hlONTH JANUARY~ 1989 TI:.LI:PIIONI:. 315-524-4446 x-396 Ginna Station Ho.

Date Co ee u

~

o O~

CVc0vlo0 cc Pl Cn o-0 o

Eco o>o oan c o

C1 licensee Event Report II

'Ew 0

Dll 0 EA c0 u9 c

Q l$o ou O

Cause L Corrective Action to Prevent Recurrence 89-1 1-21-89 HC INSTRU Reactor power level reduction to approximately 49% to repair tube leaks in the condenser water boxes.

Turbine trip

occurred, during a turbine stop valve test, because of a short in the test solenoid.

F: Forced S:

Scheduled REV. 4/8S 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

14lanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI6I)

Exhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Februar 10 1989 COMPLETED BY A4 N~'~

Robert E.

Dodge TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH Zanuar 1989 The unit operated at 1004 reactor power level for the majority of the report period with a few exceptions detailed below:

On 1/12/89 the reactor power level was reduced to 974 to perform Periodic Tests involving the Standby Auxiliary Feedwater System.

On 1/13/89 the reactor power level was reduced to 98% to perform Periodic Tests involving the Auxiliary Feedwater System.

On 1/21/89 the reactor power level was reduced to 494 to repair tube leaks in three condenser water boxes.

A turbine trip occurred, during a turbine stop valve test, because of a short in the test solenoid.

The reactor power level was restored to 1004 after completion of the repairs.

)

v GINNA STATION MAINTENANCE REPORT

SUMMARY

JANUARY, 1989 During the month of January, routine maintenance and inspections were completed.

Major safety related work included:

a ~

b.

c ~

A Service Mater Pump adjust packing Diesel Fire Pump filland observe coolant level A

& B Emergency Diesel Generators replace fuel oil accumulators d.

Snubber inspection per M-40