Text

"- ACCELERATED DISI'TION DEMONSTRAN SYSTEM 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8901190004 DOC.DATE: 88/12/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1988.for RE Ginna station.W/

890113 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

S 05000244 /

RECIPIENT ID CODE/NAME PDl-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB'1 NUDOCS-ABSTRACT RGN1 EXTERNAL: EG&G SIMPSON, F LPDR NSIC COPIES LTTR ENCL 1

0 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR DREP/RPB 10 EG E

01 EG&G WILLIAMSi S NRC PDR COPIES LTTR ENCL 5

5 1

1 1

1 1

1 1

1 1

1 1

1 NOTE 'IO ALL "RIDS" RECIPEERIS:

PIZASE HELP US IO REZUCE WASlE.'XRKA.Cr 'IHE IXXXM-'MTCONGEAL DESK, ROOM Pl-37 (EXT. 20079)

TO EIZKQ%QZ YOUR NAME FMH DIBHGEKIZIGN IZSTS FOR DOC'(ME%IS YOU DQNiT NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

OPERATING DATA REPORT DOCKET NO.

January 13, 1989 COMPLETED BY ew c

a OPERATING STATUS TFLFPHONE 315-524-4446 x-301 G~na Stat> on 470 I ~ Unit Name:

R.E. GINNA NUCLEAR POWER PLANT 2 ~ Reporting Period:

3 ~ Licensed Thermal Power (MWt):

4 ~ Nameplate Rating (Gross MWe):

490

5. Design Electrical Rating (Nct hlWe):
6. hlaximum Dependable Capacity (Gross MWe):

490

7. hlaximum Dependable Capacity (Net MWe):

Notes The reactor power level was maintained at 100% for the majority of the report period with some exceptions detailed on page 3 and 4 of the report.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, lf Any (Nct MWc):
10. Reasons For Restriccions, If Any:

This Month Yr:to-Date Cumulative 167, 424 137, 691 ~ 61 7, 679 ~ 14 1, 687 ~

55%'67, 424 8 ~ 5*

181, 970, 4 14 59, 799, 329 56, 744, 458

86. 45%

77 ~ 21%

77. 225
73. 52%
73. 525
4. 26%

6 ~ 388 I I ~ Hours In Reporting Period 744 8, 784

12. Number of Hours Reactor Was Critical 744
13. Reactor Rescrvc Shutdown Hours 0.0 0.0 14 ~ Hours Generator On-Line 744 7, 593. 50 I 5. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (hfWH) 11, 042, 681
17. Gross Electrical Energy Generated (MWH) 374, 984 3, 716, 744
18. Nec Fleccrical Energy Generated (hlWH) 356, 851 3, 533, 174 I 9. Unit Service Factor 1008
20. Unit Availability Factor 100%
86. 45%

21 ~ Unit Capacity Factor (Using hlDC Net) 102. 059.

85. 58%

22 ~ Unit Capacity Factor (Using DER Nec) 102. 05%

85. 58%
23. Unic Forced Outage Rate 0

24 ~ Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Ref uelin and Maintenance Shutdown March 17, 1989 49-55 da s

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
26. IJnits In Tesc Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMFRCIALOPERATION

  • Cumin a

tive total comnencing January 1,

1975 S5'0 1 1 590004 8S l23 1 PDR ADOCK 05000244 R

PDC Forecast Achieved 88V, 4i8S 49 88

~ I

> o,r s'}j",

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Januar 13 1989 COMPLETED BY 777 Andrew E.

cNamara MONTH December 1988 TELEPHONE 1

315 524-4446 Ext.

301 at Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2.

3

~

491 491 256 17.

18 ~

19 ~

488 489 489 4 ~

5.

463 484 20.

21.

490 491 6 ~

7 ~

8 ~

9 ~

10

'2

'3

~

487 491 490 489 491 456 488 488 22

~

23

'4.

25.

26

'7

'8

'9

'91 491 490 491 491 491 491 491 14.

15.

488 489 30.

31.

491 491 16.

488 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

DO(:KI:.1'O.

50-244 l)NITNAMI..R.E. GINMA NUCLEAR pOINER pLANT UNIT SHUTDOWN AND POWER REDUCTIONS DA1.): January

(:Oh)PLI:1'I:D II@

Andrew E. McN a

REPORT MONTH DECEMBER 1988 1'I'.LIIP)IONE 315-524-4446 x-301 Ginna Station Ho.

Date 0 >

~

0 Q ~

ev C0 00 IY ol o0 E u 0

0 own r 0

l)censee Event Report It Ew 0

0 Vl 00 EA 0

CI MS 00 0

0 D0 O

Cause gl Corrective Action to Prevent Recurrence PR+

12-3-88 0

HC Reactor power level reduction to approximately 46% to repair tube leaks in the 1-A-2 and 1-B-1

.~'ondenser water boxes.

pRe 12-11-88 0

88-010 INSTRU Reactor power level reduction to approximately 65% due to icing up of two sensing lines on the "B" steam generator pressure transmitters.

1 F: Forced S:

Scheduled Rtv. 4/8S 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling

'-Regulatory Restriction

'-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 hlethod:

1-hlanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

U I

I b

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jan a

13 1989 COMPLETED BY Andrew E.

McNamara TELEPHONE 1

315 524-4446 EXT. 301 at Ginna MONTH December l988 The unit operated at 1004 reactor power level for the majority of the report period with a few exceptions detailed below:

On 12/3 the reactor power level was reduced to 474 to repair tube leaks in two condenser water boxes.

The reactor power level was restored to 100% after completion of the repairs.

On 12/ll the reactor power level was reduced to 654 due to icing up of two sensing lines on the "B" Steam Generator.

The reactor power level was restored to 1004 before the end of the days On 12/14 the reactor power level was reduced to 944 to perform a periodic test involving Excore-Incore Calibration.

On 12/15 and 12/17 the reactor power level was reduced to 97%

to perform periodic tests involving the Auxiliary Feedwater System.

L GINNA STATION MAINTENANCE REPORT

SUMMARY

DECEMBER, 1988 During the month of December, routine maintenance and inspections were completed.

Major safety related work included:

a ~

b.

C ~

d.

CV-4003 Inspected, rebuilt and tested CV-4004 Inspected, rebuilt and tested MOV-350 Unplugged line/valve - Boric Acid Snubber inspection per M-40

~

4 IA

KER

~ 44 ~ OWE ~ A G f

)5 QORK 5EAZE t

IS/I/SI j/IIII/lflll

'IIIII u!

It/IIIIIII IIIII/

/IIIIIIIIIIII 8P.

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 TC5.KPHONC AREA COE55: 7ld 546.2700 GINNA STATION January 13, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for December, 1988 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1988.

Very truly yours,

~d Robert C. Mecr y