ML17261A643
| ML17261A643 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 10/22/1987 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kober R ROCHESTER GAS & ELECTRIC CORP. |
| References | |
| NUDOCS 8710300116 | |
| Download: ML17261A643 (12) | |
See also: IR 05000244/1987020
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM
<RIDS>
ACCESSION NBR: 8710300116
DOC. DATE: 87/10/22
NOTARIZED:
NO
DOCKET
ACIL:50-244'obert
Emmet Ginna Nuclear Planti Unit ii Rochester
G
05000244
AUTH.+lAME
AUTHOR AFFILIATION
ETTENHAUSENi L.
Region ii Ofc of the Director
RECIP. NAME
RECIPIENT AFFILIATION
KOBERi R. W.
Rochester
Gas
5 Electric Corp.
SUBJECT:
Foreards
Insp Rept 50-244/87-20
on 870823-1003.
No violations
noted. W/o encl.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR
I
ENCL 0 SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: License
Exp date
in accordance
eith
10CFR2z 2. 109'(9/19/72).
05000244
RECIPIENT
ID CODE/NAME
PDi-3 PD
INTERNAL:
MOR ISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
OE LIEBERMANiJ
EG>F;T8~
0
1
FILE
01
TERNAL:
LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
STAHLEi"C
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ ILRB
OGC/HDS2
DEPY GI
NRC,PDR
COP IES
LTTR ENCL
1
1
2
1
O
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
SQ
45'
Docket No. 50-244
Rochester
Gas
and Electric Corporation
ATTN:
Mr. Roger
W. Kober
Vice President
. Electric and
Steam Production
49 East Avenue
Rochester,
New York 14649
Gentlemen:
oi
Subject:
Inspection
50-244/87-20
During the period August 23,
1987 through October 3, 1987,
members of NRC
Region I staff conducted routine safety inspections
at your facility. 'e
documented
the results of that inspection
in the enclosed
report.
- At the
conclusion of the inspection period Messrs.
T. Polich and
N. Perry of my staff
summarized
the inspection findings with Mr. S. Spector
and other
members of
your staff.
Within the
scope of this inspection,
no violations were observed.
No response
to this letter is required.
Your cooperation with us in this
matter is appreciated.
Sincerely,
Lee
H. Bettenhausen,
Chief,
Projects
Branch
1,
Division of Reactor
Projects
Enclosure:
NRC Region I Inspection
Report
No. 50-244/87-20
8710300iih 87i022
ADOCH, 05000244
8
Cl'
I
I
(il
,io
Rochester
Gas
and Electric Corporation
2
cc: w/encl:
Harry H. Voigt, Esquire
Central
Records
(4 copies)
Director,
Power Division
Public Document
Room
(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc:- w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
DRP Section Chief
DRS Section Chief
DRSS Section Chief
DRP:RI
'RP:RI
Polich/gcb
Cowgill
(
10/
/87
DRP:RI
, Bettenhausen
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 8710300116
DOC. DATE: 87/10/22
NOTARIZED:
NO
DOCKET
ACIL:50-244 Robert
Emmet Qiana Nuclear Planti
Unit iI Rochester
Q
05000244
AUTH. NAME
AUTHOR AFFILIATION
BETTENHAUSEN> L.
Region ii Ofc of the Director
RECIP. NAME
RECIPIENT AFFILIATION
KOBERI R. W.
Rochester
Qas
8c Electric Corp.
SUBJECT:
Forujards
Insp Rept 50-244/87-20
on 870823-1003.
No violations
noted. W/o encl.
DISTRIBUTION CODE;
IEDID
COPIES
RECEIVED: LTR J
ENCL
l
SIZE;
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: License
Exp date
in accordance
ujith 10CFR2I 2. 109(9/19/72).
05000244
REC IP IENT
ID CODE/NAME
PDi-3 PD
INTERNAL:
MORISSEAUI D
NRR/DREP/EPB
NRR/DRIS DIR
0
RMANIJ
REQ F
E
LE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
REC IP IENT
ID CODE/NAME
STAHLEI C
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ ILRB
OQC/HDS2
DEPY QI
COPIES
LTTR ENCL
2
2
1
2
1
1
1
1
1
TERNAL:
LPDR
1
1
1
NRC
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL, 20
UUl 44 lao[
Docket No. 50-244
Rochester
Gas
and Electric Corporation
ATTN:
Mr. Roger
W. Kober
Vice President
Electric and
Steam Production
49 East Avenue
Rochester,
New York 14649
Gentlemen:
Subject:
Inspection
50-244/87-20
During the period August 23,
1987 through October 3,
1987,
members of NRC
Region I staff conducted routine safety inspections
at your facility.
We
documented
the results of that inspection
in the enclosed
report.
At the
conclusion of the inspection period Messrs.
T. Polich and
N. Perry of my staff
summarized
the inspection findings with Mr. S. Spector
and other members of
your staff.
Within the
scope of this inspection,
no violations were observed.
No response
to this letter is required.
Your cooperation with us in this
matter is appreciated.
Sincerely,
Lee
H. Bettenhausen,
Chief,
Projects
Branch
1,
Division of Reactor Projects
Enclosure:
NRC Region I Inspection
Report
No. 50-244/87-20
g (o $QOI ~7!g Xk OFFICIAL RECORD
COPY
IR GINNA 87-20
0001.0.0
10/22/87
e
Rochester
Gas
and Electric Corporation
2
cc: w/encl:
Harry H. Voigt, Esquire
Central
Records
(4 copies)
Director,
Power Division
Public Document
Room (PDR)
Local Public Document
Room (LPOR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York
bcc: w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
DRP Section
Chief
DRS Section Chief
DRSS Section Chief
ORP:RI g
DRP:RI
Polich/gcb
Cowgill
10/g(/87
~'~
8~
DRP: RI
Bettenhausen
goM~~