ML17261A439

From kanterella
Jump to navigation Jump to search

Forwards SER & Eg&G Idaho,Inc Rept Re Util 831104 Response to Generic Ltr 83-28.Facility Designed to Permit on-line Functional Testing of Reactor Trip Sys,Including Independent Testing of Diverse Trip Features of Reactor Trip Breakers
ML17261A439
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/17/1987
From: Stahle C
Office of Nuclear Reactor Regulation
To: Kober R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17261A440 List:
References
GL-83-28, TAC-53985, NUDOCS 8703260516
Download: ML17261A439 (5)


Text

MAR 1 7 1987 Docket No. 50-244 Mr. Roger W. Kober, Vice President Electric and Steam Production Rochester Gas

& Electric Corp.

89 East Avenue Rochester, New York 14649

Dear Mr. Kober:

SUBJECT:

SAFETY EVALUATION REPORTS ON GENERIC LETTER 83-28 Enclosed is the NRC Safety Evaluation Report and the EG&G Idaho, Inc.

Report on the Ginna response to Generic Letter 83-28, Item 4.5.2. that was submitted on November 4, 1983.

Our conclusion is that the Ginna nuclear plant is designed to permit on-line functional testing of the reactor trip system, including the independent testing of the diverse trip features of the reactor trip breakers.

Sincerely, Enclosures As stated Carl Stable, Project Manager Project Directorate ¹1 Division of PWR Licensing-A

  • SEE PREVIOUS CONCURRENCE Office:

LA/PAD¹l g~~

PM/PAD¹1 Surname:

PShuttle/i(r'll

  • CStahle/jb Date:

03/p/87 03/10/87 P

GLear 03/zP/87 87032bosib o 0244 870317

@DR ADOCQ 050

', "':P

Docket No. 50-244 tr)AR I 7 1987 Mr. Roger W. Kober, Vice President Electric and Steam Production Rochester Gas

& Electric Corp.

89 East Avenue Rochester, New York 14649

Dear Mr. Kober:

SUBJECT:

SAFETY EVALUATION REPORTS ON GENERIC LE ER 83-28 Enclosed is the NRC Safety Evaluation Report a

the EG&G Idaho, Inc.

Report on the GINNA response to Generic Letter 83-28, item 4.5.2. that was submitted on November 4, 1983.

Our conclusion is that the GINNA nuclear ant is designed to permit on-line functional testing of the reactor trip s tern, including the independent testing of the diverse trip features of the reactor trip breakers.

S'ncerely, Enclosures As stated Carl Stahle, Project Manager Project Directorate 81 Division of PWR Licensing-A Office:

LA/PADPl Surname:

PShuttleworth Date:

03/

/87 PM/Qj881 CSMhl e 03/t0 /87 PD/PADgl GLear 03/

/87

Distribution Copies:

Oocket Fil~es NRC FOR Local PDR PADPl r/f PADS'1 p/f TNovak, Actge DD NThompson, DHFT OGC-Bethesda EJordan BGrimes JPartlow GLear PShuttleworth ACRS (10)

LFNB (TAC 853985)

4