Docket No. 50-244
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA19406
IE FILE cOPA(
2 2 JU'981
Rochester
Gas
and Electric Corporation
ATTN:
Mr. John
E. Maier
Vice President
Electric and Steam Production
~
89 East Avenue
Rochester,
14649
Gentlemen:
Subject:
Inspection
50-244/81-07
s g]g( g
'-5
"UL oe ~sst~-
~ Rl~gggg
cotwu gag~
yg
This refers to the routine safety inspection
conducted
by Mr.
R.
L.
Nimitz of this office on March 22-26,
1981 at the
R.
E. Ginna Nuclear
Power Plant, Ontario,
New York of activities authorized
by
NRC License
No.
DPR-18 and to the discussions
of our findings held by Mr. Nimitz
with Mr. B.
Snow and other members of your staff at the conclusion of
the inspection.
Areas
examined during k's inspection
are described
in the Office of
Inspection
and Enforcerr .It Inspection
Report which is enclosed with this
letter.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
measurements
made
by the inspector,
and observations
by the
inspector.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted
in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed
herewith
as Appendix
A.
This item of noncompliance
has
been categorized
into the levels
described
in the Federal
Register Notice (45 FR 66754) dated October 7,
1980.
You are required to respond
to this letter and in preparing your
response,
you should follow the instructions
in Appendix A.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy
of this letter and the enclosures will be placed in the
NRC'
Public
Document
Room.
If this report contains
any information that you (or
your contractors)
believe to be exempt
from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone
within ten (10) days
from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days
from the
date of this letter
a written application to this office to withhold
such information.
Consistent with section 2.790(b)( 1),
any such application
must
be accompanied
by an affidavit executed
by the owner of the information
go<
5
( Bf07f002S4 8f0622
ADQCK 05000244
I 6
8
I,'
t(~fg
1
gt
Rochester
Gas
and Electric Corporation
22
JUN
ISSUE
which identifies the document or part sought to be withheld,
and which
contains a,full statement
of the reasons
on the basis
which it is claimed
that the information should
be- withheld from public disclosure.
This
section further requires
the statement
to address
with specificity the
considerations
listed in 10 CFR 2.790(b)(4).
The information sought to be
=
withheld shall
be incorporated
as far as possible into a separate
part of
the affidavit. If we do not hear
from you in this regard within the specified
periods
noted above,
the report wi 11
be placed
in the Public Document
Room.
The telephone notification of your intent to request withholding, or any
request for an extension of the
10 day period which you believe necessary,
should
be
made to the Supervisor,
Files, Mail and Records,
USNRC Region I,
at (215) 337-5223.
Should you have
any questions
concerning this inspection,
we will be
pleased
to discuss
them with you.
Sincerely,
ames
H. Joyner,
Chief, Technical
Inspection
Branch, Division of
Engineering
and Technical
Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection
and Enforcement
Inspec'tion
Report
Number 50-244/81-07
cc w/encls:
Harry H. Voigt, Esquire
Central
Records
(3 copies)