Text

Docket No. 50-244

e

UNITED STATES

t

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYlVANIA19406

MAY 2 2 198)

Rochester

Gas

and Electric Corporation

ATTN:

Mr. John

E. Maier

Vice President

Electric and

Steam Production

89 East Avenue

Rochester,

New York 14649

Gentlemen:

Subject:

Inspection 50-244/81-04

This refers to the routine safety inspection

conducted

by Mr. R.

P.

Zimmerman

of this office on February 1,

1981 through March 31,

1981 at the

R.

E. Ginna

Nuclear Power Plant of activities authorized

by

NRC License

No.

DPR-18 and'o

the discussions

of our findings held by Mr. Zimmerman with Mr. B.

Snow and

other members of your staff periodically during the inspection.

Areas examined during this inspection are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter.

Within

these areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

observations

by the

inspector,

and measurements

made

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section

2.790 of NRC's "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor)

believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

be

accompanied

by an affidavit executed

by the owner of the information, which

identifies the document or part sought to be withheld, and which contains

a

statement of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph

(b) (4) of Section

2.790.

The information sought to be withheld shall

be incorporated

as far as

possible into a separate

part of the affidavit. If we do not hear from you in

this regard within the specified period,

the- report will be placed in the Public

Document

Room.

81 6166

386

~

+g

C

L

js

~

~

Rochester

Gas

and Electric

Corporation

MAY 2 2 1981

Should you have any questions

concerning this inspection,

we will be pleased

to

discuss

them with you.

Sincerely,

Eldon J. Brunner, ChiP

Reactor Projects

Branch

81

Division of Resident

and Project

Inspection

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-244/81-04

cc w/encls:

B. A. Snow, Plant Superintendent

J. Bodine,

gC Engineer

Harry H. Voigt, Esquire

~

~

~

J.

T. St. Martin, Technical Assistant,

Operations

Assessment