Submits Info on Util Re Inadvertent Safety Injection During Surveillance Testing,In Response to NRC .Procedures Involving Reactor Protection Sys Require That Operations Personnel Be Notified
ML17258A958
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/10/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8104150382
Download: ML17258A958 (6)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:8104150382 DOC ~ DATE: 81/04/10 NOTARIZED:

NO DOCKET' FACIL':50 244 Robert Emmet Ginna Nuclear Plenty Unit 1i Rochester G

05000244 AUTH BYNAME AUTHOR AFFILIATION MAIERiJ ~ E ~

Rochester Gas 8 Electric Corpo RECIP ~ NAME RECIPIENT AFFIL'IATION CRUTCHF IELDi D ~

Operating Reactors Branch 5

SUBJECT:

Submits info on util= 791107 ltr re inadvertent'afety inJection during surveillance testingiin response to NRC 810205 ltd Procedures involving reactor protection sys'equire that operations personnel be notified, DISTRIBUTION CODE:

A001S COPIES RECEIVED:LTR

'NCL +SIZE:

TITLE: Gener al Distr ibution for af ter Issuance of Operating License NOTES: 1 copy:SEP Sect>

Ldr ~

05000244 RECIPIENT ID CODE/NAME" ACTIONS CRUTCHF IELD 04 INTERNAL; D/DIR HUM FAC08

ILE, 06 OELD 11.

RAD ASMT'R COPIES'TTR ENCL 13 RECIPIENT ID CODE/NAME DIR,DIV OF LIC NRC PDR 02 OR A

ESS BR 10 01 COPIES LTTR ENCL EXTERNAL; ACRS NSIC 09 05 16 1

1 LPDR 03 APR I 6 198$

d)

'TOTAL NUMBER OF COPIES REQU'iRED:"'TTR ~

ENCL'

l

'I l1

I/////ZS/ /

///////I///

AHO

//////

//IX'I/

5ZSÃ ROCHESTER GAS AND ELECTRIC CORPORATION aaa ~ P raae/

~

o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

MAIER VICE PRESIDENT TEI.EPHONC AREA CODE 7 III April 10, 1981 Director of Nuclear Reactor Regulation ATTN: Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

RG&E November 7, 1979 letter regarding inadvertent safety injection during surveillance testing at Ginna R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Crutchfield:

In accordance with your request in your letter dated February 5, 1981 regarding the above stated subject, the following is submitted.

The November 7, 1979 letter to Mr. Dennis L. Ziemann, Chief, Operating Reactors Branch No. 1, from Mr. Leon D. White, Jr. stated in part "Surveillance and calibration procedures now require notification not only to the on-duty Shift Foreman, but also to the Head Control Operator at the start and upon completion of the tests.

Certain surveillance procedures require the test personnel to be relieved of all simultaneous responsibilities relative to normal duties and routine operations while performing the test.

Their responsibilities will be covered by other on-site personnel.

Other surveillance procedures prohibit the performance of other activities related to maintenance or testing which may distract control room personnel involved in the performance of the test."

The procedures involving reactor protection systems require that "operations personnel" in the control room be notified rather than the specific job title of "Head Control Cperator" as well as the "Shift Foreman" now titled "Shift Supervisor."

This-method is equivalent to the method specified in the subject letter and in no way causes a reduction in the degree of safe administrative practice.

///oo/

'k

I CI

)f k

1h m*~

ROCHESTER GAS AND ELECTRIC CORP.

DATE April 10, 1981 To Director of Nuclear Reactor Regula tion ATTN: Mr. Dennis M. Crutchfield, Chief SHEET NO.

2 As a result of your February 5, 1981 letter, an additional minor; number of procedures were discovered which need to be revised to clarify these requirements.

These changes will be accomplished by May 15, 1981.

Very truly yours, Jo n E. Maier