Forwards Summary of Staff Requirements to Resolve Open Items & Fr Notice Re Fire Protection Features.Applicable Provisions of 810217 App R Discussed.W/O Encl
ML17258A800
Person / Time
Site: Ginna 
Issue date: 11/24/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
ROCHESTER GAS & ELECTRIC CORP.
References
LSO5-80-11038, NUDOCS 8102190433
Download: ML17258A800 (6)


Text

~s ~ ~-~

%sass ayCI,

~C C

C

+)te e +

i

'"'""'"'~"'" ~""

NUCLEAR R EG ULATORY COMMISS ION WASHINGTON, 0, C. 20555 November 24, 1980 Docket No. 50-244 Plant Name:

R.

E. Ginna LS05-80-11-038 TO ALL POWER REACTOR LICENSEES WITH PLANTS LICENSED PRIOR TO JANUARY 1, 1979

'~K/9

~E~O~ 1983 a 10 s Pg The COImission published on November 19, 1980 (45 FR 76602),

a revised Section 10 CFR 50.48 and a

new Appendix R to 10 CFR 50 regarding fire protection features of nuclear power plants.

The revised Section 50.48 and Appendix R will become effective February 17,

1981, which is 90 days after publication.

A copy of the Federal

~Re i ster Notice is enclosed (Enclosure 1).

The provisions of Appendix R that are applicable to the fire protection features of your facility can be divided into two categories.

The first category consists of those provisions of the Appendix that are required to be backfit in their entirety by the new rule, regardless of whether or not alternatives to the specific requirements of these Sections have been previously approved by the NRC staff.

These requirements are set forth in Sections III.G, Fire Protection of Safe Shutdown Capability; III-J, Emergency Lighting; and III-O, Oil Collection Systems for Reactor Coolant Pump.

The fire protection features of your facility must satisfy the specific requirements of these three Sections by the dates established by Paragraph 50.48(c),

unless an exemption from the Appendix R nequirements is approved by the Commission.

You should note the provisions for tolling the time for completing the modifications required by these three Sections of Appendix R set forth in Paragraph 50.48(c)(6).

The second category of Appendix R provisions applicable to the fire protection features of your facility consists of requirements concerning the "open" items of previous NRC staff fire protection reviews of your facility.

An open item is defined as a fire protection feature that has not been previously approved by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position BTP PCSB 9.5-1, as reflected in a staff fire protection safety evaluation report.

The fire protection features of your facility that are in this category must satisfy the specific requirements of Appendix R by the dates established by Paragraph 50.48(c),

unless an exemp-tion from the Appendix R requirements on those features is approved by the COIImission.

Enclosure 2 is a summary listing of the open items concerning the fire protection features of your facility based on a review of our records.

Also'ncluded is our position on the specific requirements that oust be satisfied in order to resolve these open items.

If you have any questions or disagree-ments with this enclosure, please advise us within 30 days of your receipt of this letter.

0 e

V

~

I' With regard to the fire protection modifications that have been previously approved by the NRC staff, Paragraph 50.48(d) specifies a

new schedule for their completion.

This paragraph, when it becomes effective, will supersede the currently effective section of the regulations that temporarily suspends coopletion dates for previously approved fire protection modifications that are given in facility license conditions (45 FR 71569, October 29, 1980).

The Comnission expects that all such modifications will be completed in accordance with this new schedule, unless an extension has been requested and granted by the Director of the Office of Nuclear Reactor Regulation

[see Paragraph 50.48(d)3, or an exemption has been requested and granted by the Cormission pursuant to Section 50.12 of the Coranission's regulations.

If you have previously requested extensions of dates for completion of modifications that are required by license conditions for your facility which were not approved, and you have determined that these extensions are still necessary and justifiable, it will be necessary for you to reapply for any such extensions in accordance with the provisions of Paragraph 50.48(d).

All requests for Coraoission action resulting from this rule are subject to the schedule of fees specified in 10 CFR 170.21.

If you have any questions concerning the subject matters of this letter, please contact the NRC Project Manager for.your facility.

Sincerely, Encl osures:

1.

Notice - Fire Protection Rul e 2.

Summary of Staff Require-ments to Resolve Open Items

)

J,

.q s4m~C~

'arrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation cc w/enclosures:

See next page

l, B

Mr. Leon D. White, Jr. November 24, 1980 w/enclosures:

Harry H. Voigt, Esquire LeBoeuf, Lamb, Leiby and MacRae 1333 New Haoyshire Avenue, N.

W.

Suite 1100 Washington, D. C.

20036 Mr. Michael Slade 12 Trailwood Circle Rochester, New York 14618 Rochester Comnittee for Scientific Information Robert E. Lee, Ph.D.

P. 0.

Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1,

Second Floor Empire State Plaza

Albany, New York 12223 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14604 Supervisor of the Town of Ontario 107 Ridge Road West
Ontario, New York 14519 Resident Inspector R. E. Ginna Plant c/o U. S.

NRC 1503 Lake Road

Ontario, New York 14519 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)

U-S. Environmental Protection Agency Washington, D. C.

20460 U. S. Environmental Protection Agency Region II Office ATTN:

EI S COORD INATOR 26 Federal Plaza New York, New York 10007 Herbert Grossman, Esq.,

Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comnission Washington, D. C.. 20555 Dr. Richard F. Cole Atomic Safety and Licensing Board U. S. Nuclear Regulatory Cormission Washington, D. C.

20555 Dr.

Emmeth A. Luebke Atomic Safety and Licensing Board U. S. Nuclear Regulatory Cormission Washington, D. C.

20555 Mr. Thomas B. Cochran Natural Resources Defense Council, Inc.

1725 I Street, N.

W.

Suite 600 Washington, D. C-20006