Forwards Draft SEP Review of NRC Safety Topic V-11.B Associated W/Electrical,Instrumentation & Control Portions of RHR Sys for Ginna Power Plant. Compares Facility Against NRC Criteria.Requests Comments by 810130
ML17258A730
Person / Time
Site: Ginna 
Issue date: 12/12/1980
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: White L
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17258A731 List:
References
TASK-05-11.B, TASK-5-11.B, TASK-RR LSO5-80-12-028, LSO5-80-12-28, NUDOCS 8101280441
Download: ML17258A730 (5)


Text

I58I~

D ISTRI BUTION:

~Docks OIaE (3)

DCrutchfiel d RSnai der HSmith R

LPDR TERA NSIC NRR RF ORB g5 RF DEisenhut RPurple TNovak GLainas CBerlinger RScholl Docket No. 50-244 LS05-80-12-028 ACRS (16)

J Hel temes GCwali na Gray File 6'ECEMBER 1 2 1980 Hr. Leon D. White, Jr.

Vice President Electric and Steam Production Rochester Gas 8I Electric Corporation 89 East Avenue Rochester New York 14649 OELD JRoe JAN2 3, 198)c BHerrman

<is sv~ REeUIA COAIlII$5 ICN Cy

Dear Hr. Hhite:

RE:.

SEP TOPIC V-ll.B 'RHR INTERLOCK RE(UIREHENTS (ELECTR!CAL REVIEW ONLY) - R. E. GINNA NUCLEAR POWER PLANT" currently used by the regulatory staff for licensing new facilities.

Please inform us if your as-built facility differs fr'om the licensing basis assumed in our assessment.

Conments received by January 30, 1981 will be considered in our final report of the electrical portion of this review.

Enclosed is a copy of our current evaluation of the electrical portion of Topic V-ll.B for R. E. Ginna Nuclear Power Plant.

This assessment compares your facility,.as described in Docket No. 50-244, with the criteria This evaluation will be a basic input to the integrated safety assessment for your facility unless you identify changes needed to reflect the as-built conditions at your facility.

This assessment may be revised in the future if your facility design's changed or if NRC criteria relating to this subject are redified before the integrated assessment is completed.

In future correspondence regarding this topic, please refer to the topic number in your cover letter.

Sincerely,

!IIXiDi 28 Q% I 1

Enclosure:

Draft SEP Topic V-11.B (Ele'ctri cal Review) cc w/enclosure:

Original signed by Dennis M. Crutchfield Dennis H. Crutchfield, Chief Operating Reactors Branch 85 Division of Licensing OFFICE P s..

SURNAME DATEP.

DL:ORBg5/PH RSnaider:rj id

/~iBO D

85/LA H mith

" 5-"/i~/80 DL: EPB/C WTRussell

/ii/

e DL:

/C DCr ld P,/ /b/80 NRC FORM 318 {9r76) NRCM 0240

~ AU.S. GOVERNMENT PRINTING OFFICE: 1979'289 389

4

~

P K

~ Qh

pe RECIj c<

~o a

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 12, 1980 Docket No. 50-244 LS05-80-12-028 Nr. Leon D. White, Jr.

Vice President Electric and Steam Production Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Nr. White:

RE:

SEP TOPIC V-1l. 8 RHR INTERLOCK RE(UIREYZNTS (ELECTRICAL REVIEW ONLY) - R.

E.

GINNA NUCLEAR POWER PLANT Enclosed is a copy of our current evaluation of the electrical po~tion of Topic V-ll.B for R. E. Ginna Nuclear Power Plant.

This assessment compares your facility, as described in Docket No. 50-244, with the criteria currently used by the regulatory staff for licensing new facilities.

Please inform us if your as-built facility differs from the licensing basis assumed in our assessment.

Coments received by January 30, 1981 will be considered in our final report of the electrical portion of this revi ew.

This evaluation will be a basic input to the integrated safety assessment for your facility unless you identify changes needed to reflect the as-built conditions at your facility.

This assessment may be revised in the future if your facility design is changed or if NRC criteria relating to this subject are mdified before the integrated assessmeht is completed.

In future correspondence regarding this topic, please refer to the topic number in your cover letter.

Si

erely, E nc1 osure:

Draft SEP Topic V-1 1.B (Electrical Revi ew) cc w/enclosure:

See next page Dennis H. Crutchfield, hief Operating Reactors Branch 45 Division of Licensing

Mr. Leon'D. White, Jr.

December'2 1980 cc w/enclosure(s):

Harry H. Voigt, Esquire LeBoeuf, Lash, l.eiby and MacRae 1333 New Hampshire Avenue, N. M.

Suite 1100 Mashington, D. C.

20036 Mr. Michael Slade 12 Trailwood Circle Rochester, New York 14618 Rochester Cormittee for Sci ent ific Informat i on Robert E. Lee, Ph.D.

P. 0.

Box 5236 River Carpus Station Rochester, Hew York 14627 Jef frey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza-

Albany, New York 12223 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza
Albany, Hew York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14604 Supervisor of the Town of Ontario 107 Ridge Road Mest
Ontario, New York 14519 Resident Inspector R. E. Ginna Plant c/o U. S.

NRC 1503 Lake Road

Ontario, New York 14519 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau Hew York State Department of Law 2 Morld Trade Center New York, New York 10047

'I Director, Criteria and Standards Division Office of Radiation Programs (AHR-460)

U. S. Environmental Protection Agency Mashington, D. C.

20460 U. S. Environmental Protection Agency Region II Office ATTN:

E I S COORD INATOR 26 Federal Plaza New York, New York 10007 Herbert Grossman, Esq.,

Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Coomission Mashington, D. C.

20555 Dr. Richard F. Cole Atomic Safety and l.icensing Board U. S. Nuclear Reglatory Comission Mashington, D. C.

20555 Dr.

Emmeth A. Luebke Atomi c Sa fety and Licens ing Board U. S. Nuclear Regulatory Comnission Washington, D. C.

20555 Mr. Thomas B. Cochran Natural Resources Defense Council, Inc.

1725 I Street, N.

M.

Suite 600 Mashington, D. C.

20006