REGULATORY I 1RMATION DISTRIBUTION SYS (RIDS) 4 ACCE'SSION NBR:8202090367 DOC ~ DATE: 82/02/03 NOTARIZED:
NO DOCKET FACIL:50"244 Robert Emmet Ginna Nuclear Plant~
Uni,'t 1r Rochester G
05000200 AUTH,NAME AUTHOR AFF ILIATION MAIER~J ~ E, Rochester Gas 8 <<Electric Corp'ECIP
~ NAME RECIPIENT AFFILIATION
'GRUTCHFIELDg D, Operating Reactors Branch 5
SUBJECT:
Notifies that results of investigation of containment tendons conducted in response to NRC 811228 draft evaluation of SEP Topic III-7,A submitted in 820201 ltr.Surveillance program changes should be conducted w/current investigation.
DISTRIBUTION CODE:
A035S COPIES 'RECEIVED:LTR, g ENCL SIZE'./
TITLE: SEP Topics NOTES: 1 copy:SEP Sects Ldr.
05000240 RECIPIENT ID CODE/NAM<<E ACTION; ORB P5 BC 01 INTERNAL: IE 06 NRR/DE/HGEB 10 NRR/DL/SEPB 12 NRR/DS I/CS8 07 EXTERNAL: ACRS 14 NRC PDR'2
<<COPIES LTTR ENCL 10 1
1 RECIPIENT ID'CODE/NAME LPDR NTIS NRR/DE/ADMQE 13 NRR/DL/ORAB 11 B
04 03 5
COPIES LTTR ENCL g3 D
- TOTAL NUMBER OF COPIES REQUIRED'TTR 3
ENCL
V 0
I
'4 r
rt
/
I/Ii////I SE!ygy/
///////////I rrziuEE zzzm r-e ROCHESTER'GAS AND ELECTRIC CORPORATION
~ 89 EAST 4
AVENUE,',ROCHESTER, N.Y. 14649 JOHN E. MAILER Vice President 7KLKPrrONK ARKA COOK 716 546-2700 February 3, 1982 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Ol meEllIED FEB 8 1982~
13 NRM IRSV~~T QKQQQ NKXHLJKKT9 TIDC
Subject:
Topic III-7.A, Inservice Inspection Including Prestressed Concrete Containments With Either Grouted or Ungrouted Tendons R.E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
We have reviewed the SEP draft evaluation for topic III-7.A, transmitted by your letter dated December 28, 1981.
As you know, we are currently conducting an extensive investigation of the containment tendons.
As a result of the investigation, a report has been submitted by separate letter dated February 1, 1982.
We believe that any changes in our containment tendon surveillance program should be pursued in conjunction with the current tendon investigation rather than separately through the SEP.
Very truly yours, xc:
Mr. Boyce H. Grier, Director Office of Inspection and Enforcement.
Region I U.S. Nuclear Regulatory Commission (letter only) 8202090367 820203 PDR ADOCK 05000244 PDR I'