~I REGULATO NFORMATION DISTRIBUTION I'EM (R IDS3
'AOCE'SSION NBR: 8206230119 DOC ~ DATE: 82/06/17 NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Planti Unit 1~ Rochester G
'AUTH,NAME AUTHOR AFFILIATION MAIERgJ ~ E, Rochester Gas 8 Electric
.Corp'REjC IP ~ NAME REGIP IENT AFFILIATION ORUTCHF IELDi D ~
Operating Reactors Branch 5
DOCKET 05000244
SUBJECT:
Advises t for compl II..B.3 wi employees DISTRIBUTION CODE:
TITLE: General Dis
~
~
~ 1 ht installation of.post"accident sampling sys due etion on 820901 in response to TMI Action Item ll be delayed due to labor strike by contractor
~ Interim >>sampling provisions remain in effect.
A001S, COPIES RECEIVED:LTR ENCL SIZE:,
t
)
l tribution for af ter Issuance of Operating License NOTES:NRR/DL/SEP icy.
05000244 RECIPIENT ID CODE/NAME ORB P5 BC 01 INTERNAL: ELD/HDS4 NRR/DL 0IR NRR/DSI/RA8 RGN1
-'COPIES LTTR ENCL 7
7 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR/DHFS DEPY08 N
RAB 04 COPIES LTTR ENCL 1
1 1
0 1
1 EXTERNAL: ACRS NRC PDR NTIS NOTES:
09 10 10 02 1
1 1
1 1
1 LPDR NSIC 03 05 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 27
~*K NI 1I r,
r I
>r g>>>
I 1 I
)
k
~ f
'll ll
~
l h
t
~ r r
~
l l
)
h v,
'I h
h
//////////////
////I///////
ii ///I/
//
/////////II ROCHESTER GAS AND ELECTRIC CORPORATION
~ e9 EAST AVENUE, ROCHESTER, N.Y. I4649 JOHN 8, MAILER Vico Prosldont TELEPHONE AREA COOE Tia 546-2700 June 17, 1982 Director of Nuclear Reactor Regulation Attention:
Mrs Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Post Accident Sampling System R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
In our letter dated April 23,
- 1982, we committed to complete installation of a Post Accident Sampling System (PASS) by September 1,
1982 in response to TMI Item II.B.3.
Installation was in progress at that time under the direction of our contractor with completion anticipated by the September 1 date.
Equipment necessary for installation of the PASS is on site and the installation is now approximately one-half complete.
On June 2, contractor-employed labor personnel initiated an economic strike against the contractor.
While we cannot estimate the duration of this strike, and although we have not completed our evaluation of the potential impact on the September 1 completion date, it appears likely that we will be unable to meet our September 1,
1982 target.
We will be completing our evaluation in the near future and will provide additional details concerning the PASS schedule at that time.
Interim sampling provisions as described in our December 28, 1979 letter remain in place.
The interim provisions include revised procedures, sample shields and transporting equipment
- and, along with additional recently installed permanent shielding, assure that samples can be taken and analyzed under post accident conditions.
Very truly yours, J
E.
aier oot 8206230ii9"820617 PDR ADOCK'05000244 I