ML17256A646
| ML17256A646 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 04/22/1983 |
| From: | Maier J ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17256A647 | List: |
| References | |
| TASK-03-05.A, TASK-3-5.A, TASK-RR NUDOCS 8304290004 | |
| Download: ML17256A646 (3) | |
Text
r -
REGULATOR FORMATION DISTRIBUTION S EM (RIDS)
ACCESSION NBR: e304290000 DOC. DATE: 83/oil/22 NOTARIZED; NO DOCKET FACIL:50-244 Robert Emme,t Ginna Nuclear Plant~
Uni<<t 1i Rochester G
05000240 AUTH,NAME AUTHOR AFFILIATION MAIERiJ,Eo Rochester Gas 8 Electric Corp.
'RGC IP NAME RECIPIENT AFFILIATION CRUTCHFIELDtD~
Operating Reactors Branch 5
SUBJECT:
Forwards "Fracture Mechanics Evaluation of High Energy Piping Lines at RE Ginna Nuclear Power,P)anti" per SEP Topic III 5,A,Rept supports conclusion that "leak~before~break" does apply to lines,'Present leak detection sys adequate, 5E% ~w~
WS3~)~~ 4
, I+S~~
DI'STRIBUTION 'CODE:
A035S COPIES RECE IVED:LTR ENCL,Q SIZE:.
TITLE:
OR Submittal:
"SEP Topic NQTiES:NRR/DL/SEP icy, 05000200 RECIPIENT ID CODE/NAME NRA OR85 BC 01 INTERNAL: NRR/DL/DRAB 11 EG FILF OQ
<<COPIES LTTR ENCL 3
1 1
1 1
1 RFCIP IENT ID CODE/NAME NRR/DL/SEPB 12 NRR/DS I/CSB 07 RGN1 COPIES LTTR ENCL 3
3 1
1 EXTERNAL: ACRS 10 NRC PDR 02 NOTES:
6 6
1 1
1 1
LPDR NTIS "03 5
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
UTTR 21 ENCL 21
H 'l w
ihl f i
iI l
n
<<r S4 >'<<
~ )<<
i hip Ilf I 'I f ill 'll I
l
~
'3 i
hh hh 'JI')I Fhl I
IH
(.I J"'I3'l Hh I il '
I 'I fi hl f P ilhhhi I Hill Ig') I,'>'33 f g h
I
'l (3 lf'
",[
wl ht Af ', ihl
<<P, I l'I I'I I, I,"<<F,l g
F'I, l f IT(
Il il i
> I<<
<<I, I'(,,'l fI, ti 4, il)j,]
l FI III W
'H J
hl
~
3 g
'IF I
H I
I I,I I
IIIIIIIIIIIIII llllllllllll Illlll II IIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER Vice President TKI.KPHONC ARL'A coDK 7ld 546-2700 April 22, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
SEP Topic III-5.A, High Energy Line Breaks Inside Containment R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
In a letter dated March,16,
- 1983, RGGE stated that a report describing the fracture mechanics evaluations for the pressurizer surge line and the "A" accumulator line would be submitted by mid-April, 1983.
Enclosed are two (2) copies of the report "Fracture Mechanics Evaluation of High Energy Piping Lines at the R.
E.
Ginna Nuclear Power Plant".
This report supports RG&E's previously described conclusions that "leak-before-break" does apply to these lines and that the leak detection systems already in place at Ginna are adequate from these lines.
Very truly yours, Jo n E. Maier 8304290004 830422 PDR ADGCK 05000244 P