Forwards Containment Vessel Tendons & Containment Vessel Tendons Stress Relaxation... Completing Response to Comments 8 & 11a,per NRC 830308 Ltr.Response to Comment 10 Expected by 840401
ML17255A716
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/26/1984
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML17255A717 List:
References
NUDOCS 8403290185
Download: ML17255A716 (4)


Text

REGULATORY FORMATION DISTRIBUTION S'I EN (RIDS)

ACCESSION NBR:8403290185 DOC DATE! 8</03/26 NOTARIZED; NO DOCKET

~

FACIL!50 240 Robert Emme.t Ginna Nuclear Plantg Unit li Rochester G 05000244 AUTH INANE AUTHOR AFFILIATION KOBERtR AN ~ Rochester Gas 8 Electric Corp.

RECIP ~ NAHE RECIPIENT AFFILIATION CRUTCHFIELD~D ~ Operating Reactors Branch 5

SUBJECT:

Forwards "Containment Vessel Tendonsi" L "Containment Vessel Tendons Stress Relaxation, ~ , ~ >> Completing response to Comments 8 8 lfaqper NRC 830308 l-tr ~ Response to Comment 10 expected by 840401 ~

((

DISTRIBUTION CODEX'00 S COPIES RECEIVED:LTH ENCL SIZE$

TITLE: OR Submittal: General Distributipn NOTES:NRR/DL/SEP 1cy. 05000200 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAtlE. LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB5 BC 01 7 7 INTERNAL ELD/HOSE 1 NRR/DE/NTEB NRR/DL DIR 1 NRR/DL/DRAB N METB 1 NRR/DS I/RAB REG I 0Q 1 1 RGN1 "EXTERNAL+ ACRS 09 e LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 NOTES; TOTAL NUMBER OF COPIES REQUIRED ~ LTTR 26 ENCL

l >> f Irmr f I mh m>h m ">>I J I>>hh I lf,II>>3 >>h>>II f >> rmhII I t "4>>4-4>> t, tn m I'I 1

l'I I>> >I

' "Il ih m IN J If.$ 1 III I mh

>>1 'I ) Il' ~ I q, m Ih f m' 1 ht mm, >>,

Ig ll' ' III,fhIlr) 'mg/I I I t rm hh t <<'>>'l 'II 4 this Ih 't 1 Ih'*I " m 1'm 1 I

,hl ll' ','ll I "I 1 I ('I,'>>'m>>'I r',ll>>'I'hfh

'c mI <r mh>>'>> r li g)mhh Il inc )fhiIl

," y y , hh I

ll I 1

>>I

>>I, lI I n ~t>> 'II

~

1>> t "

I I>> ' '

rl I)I I, l,l l I >> "> jI>>

II /IIIIIIIIIIIII lpga ~ 0 IL~

// /IIIIIIIIIIII IIIIII lll /IIIIIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 3Z ROGER W. KOBER IRCe PRESIDENT TELEPHONE ELECTRIC & STEAM PRODUCTION AREA coDE Tls 546.2 700 March 26, 1984 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. Crutchfieldi Chief Operating Reactors Branch No. 5 U.S. Nuclear Regulatory Commission Washington'.C. 20555

Subject:

Containment Vessel Tendon Evaluation Program R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

In our letter dated November 21> 1983'e submitted a preliminary report on the 1983 Tendon Surveillance Program. The final report (GAI Report No. 2512) has been completed and is included as Attachment A. It was concluded that "the forces in the tendons are being maintained at the levels expected'nd no abnormal force losses have occurred." Also included as Attachment B is GAI Report No. 2499 on the tendon wire stress relaxation tests conducted at Lehigh University.

In our letter I dated June 13, 1983, we responded to your letter dated March 8, 1983. The above reports complete our response to Staff Comment no. 8. Staff Comment no. llai which questions the need for future tendon retensioning is addressed in GAI Report No. 2512, section 2.5. A report on the tendon load cell monitoring program will be submitted by April 1, 1984 in response to Staff Comment no. 10. This submittal will complete our response to open items in the above referenced letter.

The next tendon surveillance is scheduled for Julyi 1986.

Based upon the results of the 1983 Tendon Surveillance Program>

the tendons will maintain their integrity in accordance with the requirements of the Technical Specifications.

e y truly yours' er W. Kober Attachments t, '4032'70185 840326, t PDR ADQCK" 05000244, )