Responds to SEP Topic III-5.B, Pipe Break Outside Containment. Installation of Jet Impingement Shields to Protect Main Steam Safety & Relief Valves Not Needed.Item Resolved
ML17255A295
Person / Time
Site: Ginna 
Issue date: 06/16/1983
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0821, RTR-NUREG-821, TASK-03-05.B, TASK-3-5.B, TASK-RR NUDOCS 8306240177
Download: ML17255A295 (8)


Text

REGULATOR NFORMATION DISTRIBUTION 'S EM

('R IDS)

"AOCE!SSION NBR;8306240177,DOC DATE: 83/06/16 NOTARIZED: NO, DOCKET

<<I<<<<

.FACIL!50 240 Robert Emmet Ginna: Nuclear

<<Pl anti 'UniIt 1 g 'Rochesterr,'G

-05000244

'*AUTH~ NAME AUTHOR AFFILIATION MAIER~J;E,

'Rochester "Gas L 'Electric Corp,

<<REC IP ~NAME'ECIP IENT AF F IL'I ATION

<<ORUTCHFIELOeD ~

Operating Reactars Branch:5

SUBJECT:

Responds,<<to "SEP ITopic III>>.S,'8<,"Pipe Bneak Outside

.Containment.," Installation of Jet impingement shields,to protect main steam <<safety 8 <<r,elief valves not needed,Item

resolved, DISTRIBUTION CODE:

A03BS iCQ<<>>IES iRECEIVED:LTR "ENCL.Q 'SIZE:.."

,TITLE:

OR "Submittal:

SEP <<Topic NOTES:NRR/OL/SEP icy, 05000244 RECIPIENT ID CODE/NAME>>

NRR ORBS "BC 01

.INT>>ERNAL; NRR/OL/ORAB 11 NRR/DSI/AEB NRR/DSI/CSB

'07

<<RGN1

<<COPIES LTTR ENCL<<

"3 1

1

,1 1

RECIPIENT ID <<CODE/NAME NRR/DL/SEPB 12 N

ASB EG 00

<<COPIES LTTR ENCL' 3

1 1

.EXT<<ERNALS 'ACRS NRC>>PDR NOT>>ES'0 02,',

4

~ 1>>

LPDR NTIS 1

1 1

<<TOTAL NUMBER OF "COP I'ES REQUIRED ~

. L<<TTR

'22 ENCL

W 5

) (

)I IWI

. ll,

')4)W h(

(

)I 1) t f(

I n

f 1 ~

~

W O Wt tr I l)f( I<

j f tt 4

1 g

I g

I rl' 4

f(

t

(

I( I(

(

g(1 ll g

1 I

(

44

)I

eral uzzt AHD rtrr'rrrrr1I)l'rr'r'rrrrrr'r'r'Z ROCHESTER GAS AND ELECTRIC CORPORATION

~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAILER Vice President TKLKPHONC

  • ncs ccios. vie 546.2700 June 16, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

SEP Topic III-5.B, Pipe Break Outside Containment R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

RG6E has made an evaluation of the issue noted in Section 3.3.1.1 of NUREG-0821, the R.E. Ginna Final Integrated Plant Safety Assessment Report (IPSAR), dealing with the installation of jet impingement shields to protect the main steam safety and relief valves.

Based on a failure-effects systems review, which is intended to supplement the review performed as part of the NRC's September 4,

1981 SER for SEP Topic III-5.B, RG&E has concluded that this protection is not. necessary, and that safe shutdown can be attained even assuming the occurrence of postulated high energy line break failures, and their consequential effects.

Prior to the discussion of the acceptability of the present arrangement, RG&E emphasizes that major failures in the affected feedwater piping are not expected to occur at all.

RGSE has instituted an augmented inservice inspection

program, which is intended to ensure that any flaws in potentially problematic areas of the feedwater piping system will not become through-wall cracks prior to discovery.

Nonetheless, the following discussion will postulate that design basis cracks in the feedwater piping can occur.

The specific issue identified in the IPSAR for SEP Topic III-5.B is the protection of the "A" main steam safety valves, and atmospheric relief valve, from a crack in the "B" main feedwater line. If the feedwater line crack is postulated to occur, the potential would exist for the resulting jet, to impinge on the nearby "A" main steam safety valves, atmospheric relief

valve, and steam'adniission valve for the turbine-driven auxiliary feedwater pump.

Bas'ed on the relatively small'ize of the postulated crack," and the significant'strength of the valves and J

8SOSa40~77 SS06SS I Da aDOCX 0SOOO244 P

PDR

. L

4 4

1 4

41, 4

l4 I

,i'!

ROCHESTER GAS AND ELECTRIC ORP.

DATE June 16, 1983 Mr. Dennis M. Crutchfield SHEET NO.

attached piping, it is not expected that a major failure would

occur, such as loss of structural integrity.
However, RG6E believes it is possible that the safety-related valves could inadvertently
open, (the steam admission valves are normally closed MOV's and would be expected to remain closed).

If, in the worst case, all four safety valves and the relief valve were to open, it would result in the rapid blowdown of the "A" steam generator to the atmosphere.

This blowdown would be approximately 1 ft, substantially smaller than the design2basis break size at the outlet of the steam generator of 4.37 ft.

Thus, all core analyses would remain enveloped, and the design basis environment in the intermediate building would not be exceeded.

Also, there would be no effect on any safety-related equipment outside the intermediate building, and therefore all mitigating safety systems would remain operable.

In order to maintain the required decay heat removal.

The "A" feedwater line would be isolated to limit the SG blowdown, and the standby AFW system would be actuated, with auxiliary feedwater flow directed to the "B" steam generator, since all FW cracks of concern are located upstream of the feed-water check valve.

This auxiliary feedwater flow would be removed via the safety and/or relief valves.

Since safe shutdown could be maintained, and cooldown to RHR system actuation parameters (350 F and 360 psig) would be attain-

able, RGGE thus does not consider this issue to be of concern, and thus does not consider any modifications to be required.

RGGE has also considered the consequences associated with the postulated crack failure in the north-south portion of the "A" feedwater line in the intermediate building, which could possibly affect the safety and relief valves on both the "A" and "B" steam lines.

RG&E does not consider this a credible scenario, since all the valves are at least 60 feet from this portion of the feedwater line, and the "B" loop valves would be shielded by the "A" loop valves.

However, even if thiy were to occur, the resultant break area of approximately 2 ft would2still be smaller than the design basis steam line break of 4.37 ft.
Thus, the primary system cooldown rate would not exceed that already considered in the plant safety analysis.

Also, all required mitigating safety systems would be operable, since they are not located in the intermediate building.

Finally, safe shutdown could be maintained indefinitely, simply by supplying standby Auxiliary Feedwater to the "A" or "B" steam generator, while relieving the steam via the open safety and/or relief valves.

Thus, RGSE considers the potential consequences due to this scenario also to be acceptable.

Based on these

analyses, RG&E considers this item of SEP Topic III-5.B to be acceptably
resolved, with no additional modifications required.

RG&E reiterates that the other open issue from the Final IPSAR, the protection of the steam line

1

'I 4 I Cl

ROCHESTER GAS AND ELECTRIC ORP.

June 16, 1983 Mr. Dennis M. Crutchfield SHEET NO.

components from breaks in the turbine building, is still under active review by RGGE.

As noted in the IPSAR, this latter issue is expected to be resolved in conjunction with our proposed "Structural Reanalysis Program".

Very truly yours,

a~