Proposed Tech Specs Revising Configuration of Acceptable Battery Chargers
ML17254B051
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/05/1984
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17254B049 List:
References
NUDOCS 8412120303
Download: ML17254B051 (7)


Text

ATTACHNENT A Revise the Technical Specifications as follows:

Remove Insert 3.7-l 3.7-4 3~7 l

3. 7-4 7

8g1205 8q fQf +0+03 00P4Q pDR PDOGl P

3.7 AUXILIARY ELECTRICAL SYSTEMS Applicabilit Applies to the availability of electrical power for the operation of plant auxiliaries.

I To define those'on'ditions,of electrical powe'r availability necessary (1) to provide for safe reactor operation> and (2) to provide, for the continuing availability of engineered safeguards.

Specification 3.7.1 The reactor shall not be maintained critical without:

a. , The 34.5 KV-4160 Volt station service transformer in'ervice.
b. 480-volt buses> 14> 16> 17 and 18 energized.
c. 4160-volt buses 12A and 12B energized..
d. Two diesel generators operable with onsite supply of 10<000 gallons of fuel available.
e. Both batteries and both d.c. systems operable< and battery chargers with a capacity of at least 150 amps in service for each battery.

3.7.2 During reactor operation the requirements of 3.7.1 may be modified as follows:

3. 7-1 Amendment No. 45 PROPOSED

'I II I

II ll

maintain the containment pressure within the design value. The minimum diesel fuel oil inventory at all times is maintained to assure the operation of both diesels carrying design load of all the engineered safeguards equipment for at least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />. (1) Commercial oil supplies and trucking facilities Pt exist to assure deliveries within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Battery chargers with at least 150 amps capacity shall be in service for each battery so that the batteries will always be at full charge. This ensures that adequate dc power will be available.

The plant can be safety shut down without the use of offsite power since all vital loads (safety systems I instruments I etc ) can be

~

supplied from the emergency diesel generators.

The two diesel generatorsI each capable of supplying safeguards loads< and the station auxiliary transformer provide three separate sources of power immediately available for operation of these loads. Thus> the power supply system meets the single failure criteria required of safety systems. (2)

References:

(1) FSAR Section 8.2.1 (2) FSAR Appendix 8A

3. 7-4 Amendment No. 45 PROPOSED

H h

ATTACHNENT B The proposed Technical Specification changes are being requested -so that the existing battery chargers may be removed and replaced with new equipment.. Currently< the plant: design includes,,

two 150 amp chargers and::two 75 'amp'hargers. One,'150 amp charger is dedicated to each dc, train...,The 75 amp chargers'are capable of manual transfer from one dc train to the oth'er.

~

The proposed Technical Specification changes will delete the description of the battery charger configurati'on but will retain the required battery charger capacity and operability. No technical requirements changes are being made. The proposed changes are administrative in nature.

In accordance with 10 CFR 50.91> the proposed changes to the Technical Specifications have been evaluated against three criteria to determine if the operation of the facility in accordance with the proposed amendment would:

involve a significant increase in the probability or consequences of an accident previously evaluated; or

2. create the possibility of a new or different kind of accident from any accident previously evaluated; or
3. involve a significant reduction in a margin of safety.

The proposed changes will not have an adverse impact as judged against these criteria.

These administrative changes conform to the Commission's example (i) of changes that do not involve a significant hazards consideration. Therefore< a no significant hazards consideration is warranted for the proposed technical specification changes.