Forwards Safety Evaluation Re Containment Vessel Tendon Surveillance Program & Tendon Evaluation Re Ginna Nuclear Power Station, Technical Evaluation Rept.Adequacy & Integrity of Containment Structure Assured
ML17254A519
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/19/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Kober R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17254A520 List:
References
LSO5-85-08-022, LSO5-85-8-22, NUDOCS 8508210093
Download: ML17254A519 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 19, 1985 Mr. Roger W. Kober, Vice President Electric and Steam Production Rochester Gas

& Electric Corporation 89 East Avenue Rochester, New Yor'k 14649

Dear Mr. Kober:

SUBJECT:

SAFETY EVALUATION CONTAINMENT VESSEL TENDON SURVEILLANCE PROGRAM Re:

2.

Letter from R.

W. Kober of RGE to D.

M. Crutchfield of NPC, dated April 10,

1984,

SUBJECT:

Containment Vessel Tendon Evaluation Program,'R.

E. Ginna Nuclear Power Plant (GAI Report 2521).

3.

Tendon Evaluation Report Rochester Gas and Electric Corporation, R.

E; Ginna Nuclear Power Plant by Franklin 'Research

Center, dated March 29, 1985.

R.

E. Ginna Nuclear Power Plant

References:

1.

Letter from R.

W. Kober of RGE to D. M. Crutchfield of NRC, dated March 26,

1984,

SUBJECT:

Containment Vessel Tendon Evaluation Program, R.

E. Ginna Nuclear Power Plant (GAI Report 2512).

The staff has reviewed the above referenced documents related to the 1983 tendon surveillance program at the RGE's Ginna Nuclear Power Plant.

Franklin Research Center (FRC) was contracted to review and evaluate the RGE submittals.

Based on FRC's review and evaluation, the staff concludes that the adequacy and integrity of the containment structure is assured.

The staff also concurs that the FRC recommendations be incorporated into future surveillance programs at Ginna.

- 8508210093 8508i9 PDR ADOCK 05000244 P ",,

PDR

Nr. Roger M. Kober August 19,, 1985.

Our Safety Evaluation and FRC's Technical Evaluation Report are enclosed.

Your response to the recommendations should be received within 30 days of receipt of this letter.

Sincerely,

Enclosures:

1.

Safety Evaluation 2.

Technical Evaluation Report cc w/enclosures:

See next page

+igiaal sigae4 ly 0 John A. Zwolinski, Chief Operating Reactors Branch No.

5 Division of Licensing DISTRIBUTION oc et NRC PDR Local PDR ORB P5 Rdg HThompson OELD EJor dan BGrimes JPartlow CNiller JZwolinski CJamer son ACRS (10)

GLear J.

Chen C.

P.

Tam Retyped by JBrandenburg 8/16/85.

ORBP5:DL CJamerson 8/ll/85 8/) ((/85 C:ORBP5:DL JZwolinski 8/yg/85

I

'I

, ~

fW I

I k

t

"'I

~

I I

II r

C h

'1 f

I

'g

'l II

'I

'q

her.

Roger W. Kober Rochester Gas and Electric Corporation R.

E. Ginna Nuclear Power Plant CC:

Harry H. Yoigt, Esquire

LeBoeuf, Lamb, Leiby and HacRae 1333 New Hampshire
Avenue, N.W.

Suite 1100 Washington, D.C.

20036 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center Neo. York, New York 10047 Resident Inspector R.E.

Ginna Plant c/o U.S.

NRC 1503 Lake Road

Ontario, New York 14519 Stanley B. Kl.imberg, Esquire General Counsel New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Supervisor of the Town of Ontario 1850 Ridge Road Ontario, 'New York 14519 Jay Dunkleberger Division of Policy Analysis 8 Planning New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223