Forwards SALP Rept 50-244/84-99 on 850225.Rept Discussed at 850318 Meeting in Rochester,Ny.Need for Improved Mgt Support in Newly Added Qa/Qc Functional Area Cited.Attendance List from SALP 850318 Meeting Encl
ML17254A351
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1985
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kober R
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17254A352 List:
References
NUDOCS 8505150160
Download: ML17254A351 (6)


See also: IR 05000244/1984099

Text

MAY 08

198S

Docket No. 50-244

Rochester

Gas

and Electric

C

poration

ATTN:

Mr. Roger

W. Kober

Vice President

Electric and Steam Production

49 East Avenue

Rochester,

New York

14649

Gentlemen:

Subject:

Systemat'sessment

of Licensee

Performance

(SALP) Report

No.

50-244

-99

This refers to the evaluation

we conducted

on February

25,

1985 to evaluate

the

performance of activities associated

with the R.E.

Ginna Nuclear

Power Plant.

This report was discussed

in a meeting held

on March 18,

1985 at your corporate

offices in Rochester,

New York. Your written comments relative to our report

have

been

reviewed

and are enclosed.

Some

changes

have

been

made in the

SALP

report to reflect the additional information provided

and these

are noted in

the enclos'ed report.

Our overall

assessment

of your facility operation

concludes that there is

effective management

attention,

oriented toward nuclear safety in all func-

tional areas

previously evaluated.

Mhile it is noteworthy that there

was

improvement in two previously evaluated

functional areas, it must also

be noted

that there is

a need for improved management

support in the newly added Quality

Assurance/Quality

Control functional area.

Me acknowledge your comment

on section

IV.B, Radiological Controls, noting that

the exposure

trend

has

been significantly reduced

over the last five years.

We

have revised the text of the analysis

accordingly.

However, it appears

that

this dose reduction

has

been largely due to site staff implementation efforts

as

opposed to an effective written corporate

ALARA program

and planning effort.

Thus,

our conclusion

and recommendations

in this area

remain

unchanged.

-$0

SALP-DL-GINNA - 0001.0. 0

04/24/85

Similarly, we have revised

our discussion

of the two examples

in the Quality

Assurance/Quality

Control

(QA/QC) section

IV.J on which you commented to

provide clarification and appropriate

emphasis.

While we agree that they

may

have

been

somewhat overstated,

we maintain that your audit program should

include

a review of Nonconformance

Reports to assure

proper disposition

and

identification of those requiring escalation.

The examples identified in

paragraph

4.4.2 of Inspection

Report SO-244/84-13

could certainly have affected

nuclear safety

had they been

improperly dispositioned

even though they were not

classified

as significant. Again, regardless

of the changes

to the text of the

assessment,

no change

in the category or recommendations

for the

QA/QC section

is warranted.

95p5i5p~bp

pgppp24+

gsp5p8

PDR

ADOCK

PD

6

OFFICIAL RECORD

COPY

l

V i,t

u

Rochester

Gas

and Electric

Company

Me os

tssS

No reply to this letter is required.

Your actions in response

to the

NRC

Systematic

Assessment

of Licensee

Performance will be reviewed during future

inspections

of your licensed facility.

Your cooperation with us is appreciated.

Sincerely,

priginal signed bV

Thomas E. orle J.

Thomas

E.

Mur ley

Regional Administrator

Enclosures:

1.

SALP Management

Meeting Attendees

2.

SALP Inspection

Report 50-244/84-99

3.

NRC Region I Letter, T. Murley to

R. Kober,

March 8,

1985

4.

RG5E Letter,

R.

Kober to T. Murley, April 11,

1985

cc w/encls:

Harry H. Voigt, Esquire

Central

Records

(4 copies)

Director,

Power Division

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

Chairman Palladino

Commissioner

Roberts

Commissioner Bernthal

Commissioner

Zech

Commissioner Asselstine

bcc w/encls:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

DPRP Section Chief

NRC Attendees

T. Murley, RI

D. Holody,

RI

J.

Tay or,

IE

PAO

~

L

D

5

P

RA

RA

R

DRP

Li ville

R

0

lns

I

Starostecki

Al ~

Muzj y

5

IP'.I.:

08 S

gAMS&'ll

gg P0$5

OFFICIAL RECORD

COPY

SALP-DL-GINNA - 0002.0.0

04/24/85

I,

,g

Q(f,p,'p(g'),

4 g

v ]

,p >l'1,'<f

a,

ENCLOSURE

1

U.S.

NUCLEAR REGULATORY COMMISSION

SALP MANAGEMENT MEETING ATTENDEES

Licensee:

Rochester

Gas

and Electric Company

89 East Avenue

Rochester,

New York

Facility:

R.E.

Ginna Nuclear

Power Plant

Meeting Conducted:

March 18,

1985

Meeting at:

NRC Attendees:

Rochester,

New York

T. Murley, Regional Administrator,

Region I

R. Starostecki,

Director, Division of Reactor Projects

S. Collins, Chief, Projects

2,

DRP

C. Miller, Licensing Project Manager,

ORB 5,

NRR

J. Linville, Chief, Projects

Section

2C,

DRP

W. Lazarus,

Project Engineer,

Projects

Section

2C,

DRP

W. Cook, Resident

Inspector,

Ginna

Licensee Attendees:

P. Briggs,

Chairman of the Board

K. Amish, President

J. Maier, Senior Vice President,

Operations

R. Kober, Vice President,

Electric and Steam Production

B.

Snow, Superintendent,

Nuclear Production

R. Smith, Chief Engineer

R. Mecredy,

Manager,

Nuclear Engineering

C. Anderson,

Manager, guality Assurance

I

~I