ML17252B034

From kanterella
Jump to navigation Jump to search
Letter Confirming a 05/16/1974 Conversation Concerning the Discovery of Leakage Past the 1B Main Steam Line Isolation Valve in Excess of Technical Specifications - Dresden Unit 3
ML17252B034
Person / Time
Site: Dresden Constellation icon.png
Issue date: 06/05/1974
From: Stephenson B
Commonwealth Edison Co
To: James Keppler
US Atomic Energy Commission (AEC)
References
Download: ML17252B034 (2)


Text

1 i

~

A.

B.

UNITED STATES ATOMIC ENERGY COMMISSION DIRECTORATE OF REGULATORY OPERATIONS REGION tU.

799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 RO Inspection Report No.*

Transmittal Date Distribution:

RO Chief, FS.&:EB~*

RO:HQ (5)

DR Central Files Regulatory Standard~ (3)

Licensing (13)

RO Files RO Inquiry Report No.

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (5)

DR Central Files Regulatory Standards (3)

Licensing (13)

RO Files Distribution:

RO... C.h:i.ef,, FS&EB RO:HQ (4)

L:D/D for Fuels DR Cen.tral Files RO Files Distribution:

RO Chief, FS&EB RO:HQ DR Central Files RO Files TELEPHONE (3 I Z) BSB-Z660

& Materials C.

Incident Notification From: Commonwealth Edison Co. Docket No. 50-249 (Licensee & Docket No. (or License No.)

Transmittal Date Distribution:

RO Chief, FS&EB RO:HQ (4)

Licensing (4)

DR Central Files RO Files June 5, 1974 Distribution:

  • RO Chief, FS&EB RO:HQ (4)

L :D/D for Fl'.els & Materials DR Central Files RO Files

  • .i*T'~

LINE ISOLATION VALVE IN EXCESS OF THE SU~VIELANCE REQUIREMENTS GIVEN IN SECTION 4.7 OF TH~ TECHNICAL SPECFICAIIONS THE LEAKAGE MEASURED WAS 24.8 SCF AT 25 PSIG.

AL.~ OTHER MAIN STEA~1 ISOLATION VALVES HAD LEAK RATE LESS THAN "TAG 11.5 FCF

{

SF-1201 (R5-69)

(

l.

C.*

c c

AT 25 PSIG MAXIMUM ALLOWABLE 8 B STE PH E N SO N SUPERINTENDENT DRESDEN NUCLEAR POWER STATION C0~1MO~JWEALTH EDISON COMPANY RT 1 fYDRRIS IL NNNN

. MAY 2 0 1974

(~ SF-1201 (R5-69)