ML17252A729

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-010/81-06,50-237/81-13 & 50-249/81-08 on 810404-0508 & Notice of Violation
ML17252A729
Person / Time
Site: Dresden  
Issue date: 07/01/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17252A730 List:
References
NUDOCS 8107140753
Download: ML17252A729 (2)


See also: IR 05000010/1981006

Text

"-' / , .~I (._,;cJc * ....:.v-t.;;

Docket No. 50-10

Docket No./50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690 .

Gentlemen:

V~I(

lJUL 1

1981

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue

and M. J. Jordan of this office on April 4 through May 8, 1981, of activities

at Dresden Nuclear Power Station authorized by NRC Operating Licenses No. DPR-2,

DPR-19, and DPR-25 and to the discussion of our findings with Mr. D. Scott and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain. of your activities appeared to be in non-

compliance with NRC requirements, as specified, in enclosed Appendix A.

A written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by teiephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information.

Section 2.790(b)(l) requires

that any such application must be accompanied by an affidavit executed by

8107140753 810701

PDR ADOCK 05000010

G

PDR

  • ,.

.... ,

".J, *~

'iij

~

Commonwealth Edison Company

- 2 -

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld from

public disclosure.

This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2,790(b)(4).

The

.information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

We will gladly discuss any.questions you have concerning this inspection.

Enclosures:

1.

Appendix A, Notice

of Violation

2~

IE Inspection Reports

No.

50~010/81~06; .

50-237/81-13 and

No. 50-249/81-08

cc w/encls:

J. S. Abel, Director

of Nuclear Licensing

D. J. Scott,

Station Superintendent

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assis.tant Attorn:ey General

Rip.,

J

,jl /1'.

/[

To~gue/jp.

6/18/81

%/*~{

Jordan

(

, I~

l

I~

Sincerely,

R. F. Heishman, Acting Director

Division of Resident and

Project Inspection

RI!,~~

Kno~