MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] |
Text
e Commonweal9dison Dresden Nuclear Power Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 BBS Ltr. #76-845 December 2, 1976 Mr. James G. Keppler, .
Regional Director
\
Directorate of Regulatory Operations - Region III U. S. Nuclear Regulatory Co'mmission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Enclosed please find Reportable Occurr~nce report number This* report is being submitted to. your office in accordanc1 with* the Dresden Nuclear Power Station Technical Specifications, Section 6.6.B.
eph son Station Superiritendent Dre~den Nuc!'ear Power Station BBS :jo
- Enclosure cc: Director of Inspection & Enforcement l;lirector of Management Information & P*rogram Control File/NRC DEC 7 1976
.. LICE~SEE EVENT REPORT -
CONTROL BLOCK: I I 1
! I *. I *. I I .
- 6 (PLEASE PRINT ALL REQUIREOINFORMATION)
LICENSEE LICENSE EVENT NAME LICENSE NUMBER TYPE TYPE
@E] 1Ilt..IDIRISl31. 10101~10101016101-10101 1~111111111 10131 7 8 9 14. 15 ' 25 26 30 31 32 REPORT REPORT CATEGORY TYPE. SOURCE OOCKET NUMBER. EVENT OATE REPORT DATE
@E1 cowr I I I lbJ L&J !015101_.:._IOl;1..141ql I! It IOIS-171'1 1tI~1011171<01.
7 8 57 58 59 60 61 68 .68 74 75 . 80 EVENT DESCRIPTION 7
IQI?J8 9I WHILE TH£ UN!T-3 DIES.e.:L . GEN£.RATOR WA$ BEING- OPERATED .
TO .PERFORM I 80 l7o1318 8I 4 KV BRE:AKER .
SWITCH 1NCr, IT WAS FOUND TH11I THE £NGIN£" SPEED (t..oADJ I
. . . . . 80
@El lcouLP 13.£ j)ECR.£ASED BVT Nor 1Nc.Re:1tS£.D ERbpf TH£ .c.D!IJTR.01- Room. FUJ...L I 7 8 9 . .. . .. . - ,~, . . . . ,._. 80
~ I.ENG-INC: SP££D. CONTROL WAS P.V!tlL././BJ..,f: AT THE J....QCAL CONTROL STfJTtotJ.. Auro-1 7 8 8 . 80/
[£ffil fYJ!f//C ST. OF TH£
- 7. 8 9 PR:ME (5£G ATTAlt1CJ) S~£ET 80 SYSTEM CAUSE COMPONENT COMPONENT CODE COOE COMPONENT. COOE . SUPPLIER
@0 IELE I l_fil 1£ IN I G 11 INIEI ll!.J llV I :l I~ IO I lM 7 8 9 10 11 12 17. 43 : 44 47 I 48 CAUSE DESCRIPTION ..
lolsl8 8I TUE FAILURE WAS Cl\(;)$£D"--*ey"1k\*:7nsG:8.i§iN1C:AL tr1AiFVN~T10/.i oF*'_*:.if.1£~':*RAtSE *I.
7 . .* . . 80
7 8 8 I OVERTRAVt.L .*1-1mrr .
SWl'TU1 ONT!{ f)IESE& GoVE:/SNOR. e Tl-I/$ SWITGH LI vYI ITS 80 I
IT@ l]}.IE GOvERNoR.. sE:TT1N(;... ro A No~1-0Ao f::RiQ.itep.ic;v~ or!/~ -~~-fub. Hz
.. i=Ac1i:1ry
.. ~ETHOO OF .
($6£ R7rl'C~D ~ltSCT) 80 .
.. -.STATUS % POWER OTHER STATUS DISCOVERY . DISCOVERY DESCRIPTION EEJ8
- 7. .
lliJ 9 . .
IO I oj o I 10 . 12 .. 13 .
- vA 44
@.j 45 46 AIA
~----,--~----,-------*
80 J
FORM OF ACTIVITY CONTENT rn .~ *lZJ 7 8 RELEASED
.8 .
OF RELEASE 10 11 L.-1_
AMOUNT OF ACTIVITY
____,.._.,_/0_~_-"--__.
44 45 I
~-~~---"M~n~~~-*~~~_.I LOCATION OF .RELEASE 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
~ .101C>I01 lZJ ._____M_'.4-_*----------------~80 7 9_9. *11- 12. 13-PERSONNEL INJURIES NUMBER . DESCRIPTION EEi IO Io 10 I "'----~M.;..;..lfl.::-.- _______________________,_
7 8 9. 11 12 80
- OFFSITE CONSEQUENCES 12nl..
7 8 8. .
J\I. .
. 80 LOSS OR DAMAGE TO FACILITY TYPE DESCRIPTION
!))].
7 8 lZJ 10I .
9.
di/
80 PUBLICITY
. -*Bil I -- N/I .
7 8 8 80 ADDITIONAL FACTORS
~ /I/If 7 8 8 80
~ 80 7 8 9 NAME: TER.R.ANC£ £ ~ /_ANG- PHONE: £xr. 433 GPO 881 * ~67
_EVENT DESCRIPTION (Continued) by this failure. The lJnfr 2/3 diesel generator was immediately verified to be operable, as were the. Uni_t...:J. LPCI, core.spray, and *ccsw systems. (50-249/1976-32)
. ~ . *' '
- CAUSE DESCRIPTION (Con.tinued).,
the shutdown o,~~-~he* diesel. "The~'§_witch was apparently actuated when the diesel was last shut\gowq:,: and ,.remained open after. the subsequent start-.up of the diesel.
The failure of'the switch to close after start-up precluded remote speed control of the diesel in the manual mon~~
Th~-.;.--rais~
r_,,,._...r.,-_.,_:~-~.P"'o-overtravel limit sJ.~Tuh.
._,~~
incorporates
.a
- microswitch ~ith an attached
- . ' actw~~g~&r~1! The 11m1t switch was found out of adJustment, apparently due to.
vibration;allowing the limit switch to remain open after start:....up of the diesel.
The switch arm was *actuated manuall.Y to ensure free movement of the contacts, and the actuating arm *was reset slightly .. -
.To prevent recu!rence, a modificatic>n request has been subm_itted t:o remove the, raise overtravel limit switches from the Unit-2, Unit-3 and Unit 2/3 diesel governors.
Since no-load frequency.for the diesel generators can be regulated.from the control room, the removal of these switches will have no-adverse effect on diesel generat:or
- frequency control. ;. A similar failure occurred on the Unit-:-3 diesel generator in 1972 . . The diesel governor _is a model uc..:.8 unit manufactured by the Woodward
.Go'vernor Company.