Forwards Final SALP Rept 50-244/86-99 for June 1986 - Nov 1987.Recommendations Made by Previous SALP Board Continue to Be Deficiencies in Current SALP Period. Progress Will Be Monitored in Deficient & Other Areas
ML17251B087
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/12/1988
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Snow B
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17251B088 List:
References
NUDOCS 8805200061
Download: ML17251B087 (10)


See also: IR 05000244/1986099

Text

{{#Wiki_filter:, <ACCEIZRATED DISTRIBUTION DEMONSTRATION SYSTEM 4g REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ACCESSION NBR:8805200061 DOC.DATE: 88/05/12 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION" RUSSELL,W.T. Region 1, Ofc of the Director RECIP NAME RECIPIENT AFFILIATION SNOW,B.A. Rochester Gas 6 Electric Corp. - SUBJECT: Forwards final SALP Rept 50-244/8'6-99 for June 1986

Nov 1987.

DISTRIBUTION CODE: IE40D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Systematic 'Assessment of Licensee Performance (SALP) Report NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). DOCKET 05000244 .R I 05000244 ~ RECIPIENT ID CODE/NAME PD1-3 LA STAHLE, C INTERNAL: AEOD BAILEY,B AEOD/DSP/TPAB DEDRO NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NRR/DRIS/RSGB 9 NRR/DRIS/SIB 9A NUDOCS-ABSTRACT OGC 15-B-18 RGN1 FILE Ol EXTERNAL: H ST LOBBY WARD NRC PDR COPIES LTTR ENCL 1 0 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DOA COMMISSION NRR MORISSEAUiD NRR/DLPQ/PEB 11 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NRR/DRIS/SGB 9D NRR/PMAS/ILRB12 OE LIEBERMAN,J 02 LPDR NSIC COPIES LTTR.ENCL 1 ' 1 5 1'1 1 1 1 1 1 1 ~ D S A TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 30


Docket No. 50-244 Rochester Gas and Electric Corporation ATTN: Mr. Bruce A. Snow Superintendent Nuclear Production 49 East Avenue Rochester, New York 14649 Gentlemen: Subject: Systematic Assess'ment of Licensee Performance (SALP) Report No. 50-244/86-99 This letter transmits the final SALP Report for the R. E. Ginna Nuclear Power Plant. We conclude that overall your facility is*operated in a safe manner. The effec- tiveness of your working level staff and first line supervisors is reflected in the good operating record and performance exhibited during the SALP period. How- ever, the recommendations made by the previous SALP Board continue to be deficien- cies in this SALP period. We are concerned that gA and gC organizations are not effectively utilized as management tools and the operations-engineering interface does not always result in timely problem resolution. We will monitor your process and progress in this area as well as the others identified in the SALP Report. Thank you for your letter dated April 21, 1988 wherein you presented a detailed 'response to the SALP Report for the period June 1, 1986 through November 30, 1987 as a followup to our March 23, 1988 meeting. We appreciate the efforts you are making to address our concerns and will monitor the implementation of your initi- atives. Your response was reviewed and changes were made where appropriate., The amended SALP Report and your response are enclosed and will be placed in the Public Document Room. In summary, we felt the report, our meeting, and your response letter resulted in a constructive assessment of the performance at the Ginna Nuclear Power Plant. Your cooperation is appreciated. Sincerely, Pl ~ << -{"~-nc~.3. QnneQ p+ William T. Russell Regional Administrator 8~~~ >52000&1 8805 1 P PD(i ADOCK 05000244 9 . DCFFICIAL RECORD COPY DL50-244/86-99FINAL 0001.0. 0 05/06/88


Rochester Gas and Electric Corporation 2 MAY i 8 1988 Enclosures: 1. SALP Board Errata Sheet 2. Systematic Assessment of Licensee Performance (SALP) Report No. 50-219/86-99 3. March 23, 1988 SALP Management Meeting Attendees 4. RGEE Letter from B. A. Snow dated April 21, 1988 cc w/encls: Roger W. Kober, Vice President, Electric Harry H. Voigt, Esquire Central Records (4 copies) Director, Power Division Chairman Zech Commissioner Roberts Commissioner Bernthal Commissioner Carr Commissioner Rogers K. Abraham, PAO, RI (ll copies) Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector State of New York bcc w/encl: Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o encl) J. Taylor, DERO W. Russell, RI F. Congel, DRSS W. Johnston, DRS R. Brady, DRP J. Lieberma), OE W. Oliveira) DRS D. Holody, ES SALP Management Attendees DRP Section Chief and Steam Production RI: DRP RI: DRP ~ ~ Banerjee/meL Cowgill 5/6/88 RI DRP e tenhausen a lWer gRP RI'~DRA RI: A (p SF kllan Ru sell OFFICIAL RECORD COPY DL50-244/86-99FINAL - 0002.0.0 05/06/88


ENCLOSURE 1 SALP BOARD ERRATA SHEET PAGE LINE NOW READS SHOULD READ 12 34, 35 An ALARA checklist for engi- neering modification has been in development for a few years but is not issued. An ALARA checklist for engineer- ing modification was under de- velopment for the past several years but was not issued until September 1987. Basis: Wording changed to reflect that the che'cklist was issued prior to the end of the SALP period. PAGE LINE NOW READS SHOULD READ 12 36, 37 There are no procedures available for routine air sampling in the plant or use of the SRM-100 personnel frisker. Procedures were not available during most of the report period for calibration of the SRM-100 personnel frisker or for. routine air sampling. Basis: The wording was changed to reflect the fact that the required procedures existed prior to the end of the SALP period. PAGE LINE NOW READS SHOULD READ 13 1 2 There is no method to high- light changes to procedures for personnel who most imple- ment the procedures. Delete, this sentence. Basis: This capability exists and was overlooked by the staff. PAGE LINE NOW READS SHOULD READ 29 27 ...without the licensee per- forming the analysis and calculations... ...without the licensee perform- ing a complete analysis and cal- culations... 29 29, 30 ...with the IEB 79-02 re- quirements. ...with the IEB 79-02 require- ments. Portions of the Service Water System and the Standby Auxiliary Feedwater System were omitted from this analysis. 29 ...after several NRC requests. ..after a written NRC request. Basis: Wording changed to reflect that only a portion of the required analysis and calculation was not performed.


Enclosure 1 PAGE LINE NOW READS SHOULD READ 29 39 The personnel training was The audit program was marginal... inadequate, the audit pro- gram was mar-... Basis: The training of personnel was not the problem as the Eg work was accomp- lished by a contractor. Lack of licensee resource availability was the major problem. PAGE LINE NOW READS SHOULD READ 30 5 ...later corrected. ...corrected prior to turnover for use. Basis: Mording was changed to reflect more accurately when the problem was cor- rected. }}