Forwards Rev 2 to Procedure PT-32.5, Reactor Trip Breakers a & B Train Response Time Testing & Rev 7 to Procedure M-32.2, DB-50 Reactor Trip Circuit Breaker Insp..., in Compliance W/Generic Ltr 83-28,Items 4.2.1 & 4.2.2
Date released: 04/30/2018 Download: ML17251A631


Rev 7 to Procedure M-32.2, DB-50 Reactor Trip Circuit Breaker Insp,Maint & Test.
ML17251A633
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/27/1985
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17251A633 (43)
Rev 2 to Procedure PT-32.5, Reactor Trip Breaker a & B Train Response Time Testing.
ML17251A632
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/22/1985
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17251A632 (6)
Forwards Rev 2 to Procedure PT-32.5, Reactor Trip Breakers a & B Train Response Time Testing & Rev 7 to Procedure M-32.2, DB-50 Reactor Trip Circuit Breaker Insp..., in Compliance W/Generic Ltr 83-28,Items 4.2.1 & 4.2.2
ML17251A630
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/07/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: LEAR G E
Office of Nuclear Reactor Regulation
References
Download: ML17251A630 (3)