ML17251A502

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1989 for Re Ginna Nuclear Power Plant
ML17251A502
Person / Time
Site: Ginna 
Issue date: 04/30/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8905300140
Download: ML17251A502 (12)


Text

AC CE1Z P>TED Dl BUTION DE MON S ON SYS7gg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8905300140 DOC.DATE: 89~~

NOTARIZED: NO.

DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas 6 Electric Corp.

MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operat'ower Plant.

/8905 t for Apr 1989 for RE Ginna Nuclear ltr.

V TR ENCL SIZE:

DISTRIBUTION CODE:

IE24D COPIES RECEI ED L TITLE: Monthly Operating Report (per Tech Spec

)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 4

1 1

1 1

2 2

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR JOE 10 G FILE 0

LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1.

1 1

1 1

1 1

R I

D S

/

~ ~ ALL ttRIDS>t RECIPIENIS PIZASE HELP US TO REDUCE WASTE!

CONI'ACI'IHE DOCUM&I'XÃIBOLDESK, BcjOM Pl-37 (EXT. 20079)

TO ELOCUTE YOUR NAME HKH DISTRIBUTION IZSTS FOR DOCUMENIS YOU DGNiT NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

IIIIIIIIIII'//IIIIIIIIIIII L 44l 0%I J ~ 0 IIIIZ"'u~t/IIIIIIIIII 8F, ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649.0001 TELEPHONE ARE* CODE VIE 546.2700 GINNA STATION May 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for April, 1989 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1989.

Very truly yours, Robert C.

Mec edy General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1) 85'05300l40 890430 PDR ADOCk 05000244 R

PDC

OPERATING DATA REPORT DOCKET NO.

50 244 DATE Ma 15 1989 COMPLETED BY Robert E.

Dod e OPERATING STATUS 490 I ~ Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Rcpof tlag Period:

APr>1, 19

3. I.icensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Nct MWe):
6. Maximum Dependable Capacity (Gross MWe):

490 7, hfaximum Dependable Capacity (Net MWe):

TELEPHONE 4446 N-596 Lnna a zan Notes The unit was shutdown for the 1989 Annual Refueling and Maintenance Outage.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWc):
10. Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Ifours Gcncrator On-Line
15. Unit Rcservc Shutdown Ifours
16. Gross Thermal Energy Generated (hfWH)
17. Gross Electrical Energy Generated (MWH)

IS. Net Flcctrical Energy Generated (hfWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using hfDC Net)
22. Unit Capacity Factor (Using,DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, 7] 9**

2 879 1,806.19 0

1,796.75 0

0 2,625,346 889,282 845,455 62.41%

62.41%

62 48+o 62.48%

1.16%

Date and Duration of Each):

170 303 133,503.80 1 687.55*

131,068.63 8.5

  • 184,595,760 60,688,611 57,589,913 76.96%

76.97%

73.33%

73.33%

6.31%

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:

~ May 26, 1989

26. Units In Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COMMFRCIALOPFRATION

  • Currmulative total conmencing January 1,

1975

    • Eastern Standard Time to Eastern Daylight Savings Time Achieved Atv, 4>8S 49 88

rr 4

~

~

t 1

p l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 198 COMPLETED BY Robert E.

Do ge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH A ril 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17.

2 ~

18.

3 ~

19.

4 ~

20.

5.

21.

6 ~

22 '

~

23 24.

9.

~3 25.

10.

26.

27

'2'8

'3.

29.

14'0

~

15.

31 ~

16.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

Reporting negative net generations as required.

~\\~r g

~

I ~

l)O(:Kl'.1'O.

UNlTNAhfE R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhlPLI".I'l(DI3Y Robert E. Dodge REPORT MONTH APRIL 1989 1'I:LEP) lONl:

315-524-4446 x-396 Ginna Station No.

Date C

I 0

a 0

O~

04 C0 0o nc 0

c u o

>n:

0 ah C

0 Cl Licensee Event Report It Em o

Vl 0 lA C0 Ln 0C 0

0 D0 O

Cause BL Corrective Action to Prevent Recurrence 4-89 719'-

The unit was shutdown for Annual Refueling and Maintenance Outage.

The unit remained shutdown at the end of the report period.

F: Forced S:

Scheduled REV. 4/89 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hfethod:

I-hfanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

v

~

h

NARRATIVE

SUMMARY

OF OPERATING, EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 1989 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH A ril 1989 The unit was shutdown for the 1989 Annual Refueling and Maintenance Outage.

The unit remained shutdown at the end of the report period.

0 l

a 7

4

(

t