ML17251A447

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1989 for Re Ginna Nuclear Power Plant
ML17251A447
Person / Time
Site: Ginna 
Issue date: 03/31/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904260034
Download: ML17251A447 (12)


Text

gc Cp~ RATED BU'EON DEMONS ATION SYSTEM REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:8904260034 DOC.DATE: 8$pQH~

NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGEiR.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1989.W 890415 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL I

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244 S,

RECIPIENT ID CODE/NAME PD1-3 LA STAHLEgC INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL: EG&G SIMPSONgF LPDR NSIC COPIES LTTR ENCL 4

4 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

~

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR- -

~B 10 EG FILE EG&G WILLIAMSiS NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 R

l D

S h

MZE 'IO ALL RIDS" RECIPIEPIS:

PIZASE HELP US TO REDUCE HASTE!

(XACT '%HE DOCUMENT COWZROL DESK, KKM Pl-37 (EXT. 20079)

TO lKZMZNAXBYOUR NAME FBCH DISTRIBUTION'ISTS MR DOCUMENTS YOU DONiT NEEDt A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 21 D

S

/

d%

~ OPERATING STATUS OPERATING DATA REPORT DOCKET NO.

50 244 DATE r'1 15 1989 COMPLETED BY Robert: E.

ge TELFPHONE 315-524-4446 x-396 Ginna Station

l. Unit Name:

R.E. GINNA NUCLEAR POWER

2. Reporting period:

March 1989

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWc):
5. Design Electrical Rating (Nct MWe):
6. Maximum Dependable Capacity (Gross MWe)t
7. Maximum Dependable Capacity (Net MWe):

PLANT 1520 490 470 490 470 Notes The unit was shutdown on March 17 for Annual Refuelin and Maintenance.

It remained shutdown at the end of the report period.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct MWc):
10. Reasons For Restrictions, If Any:

This Month Yr. to Date Cumulative

~AIR

PlOL, RO OO ClO Ko"

')D

'OA Inl 0tt:

O'Gl

0) ILIr, 744 2,160 1,806.19
11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Gcncrator On-Line
15. Unit Rcservc Shutdown Hours
16. Gross Thermal Energy Generated (hlWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Flectrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using.DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (T 401.82 1,796.75 401.75 2,625,346 556,975 188,287 889,282 845,455 178,483 83.18%

54.005 54.00%

51.049.

83.18%

83.28%

51. 04%

83.28$

1.16%

ype, Date and Duration of Each):

Forecast

  • Currmulative total comnencing January 1,

1975

25. If Shut Down At End Of Report.Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION 169,584 34,806.73 131,068.63 8.5*

184,595,760 60,688,611 57,589,913 77.29%

77.29%

73.65%

73.65%

6.31%

Achieved Rtv. 44S 49 88

~I AVERAGE DAILY UNIT POWER ~L DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A r'5 1989 COMPLETED BY Robert E.

Do ge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH March 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 489 17.

239 2 ~

487 18'10 3 ~

484 19.

-10 4 ~

478 20.

-10 5.

6.

7 ~

466 463 457 21 ~

22.

23.

8.

449 24.

9.

10.

444 438 431 25.

26.

27.

12'25 28

'3.

14.

15'15 418 425 29.

30.

31.

16'25 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l)0(:KI:.TNO.

SO-244 UN/TNAMl:R.E. 6/NNA NUCLEAR POWER PLANT OIIIT IWOTOOWW RIIO POWER R ~ OOOTltllll

(:OMP Ll'.1'I:D BY REPORT MONTH

March, 1989 q I:.LI..PIfONI.. 315-524-4446 x-396 Ginna Station Ho, Date 0

I

.0 M/

O 4

~

0 O~

ERE 40 M/40 lx!

4E o-0 4 u40 0En 4 00 Licensee Event Report 0

Ew 0

Vl 40 E/l 40 LEE 04 0 40 O

Cause gl Corrective Action to Prevent Recurrence 89-2 3-17-89 The unit was shutdown on March 17 for Annual Refueling and Maintenance.

It remained shutdown at the end of the report period.

F:

Forced S:

Scheduled REV. 4/89 4949 Reason:

A-Equipmcnt Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-hfanual 2-hfanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE A ril 1989 COMPLETED, BY Robert E.

odge TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH March 1989 The unit was shutdown on March 17 for the Annual Refueling and Maintenance Outage and remained shutdown at the end of the report period.

C S

GINNA STATION MAINTENANCE REPORT

SUMMARY

MARCH, 1989 During the month of March, routine maintenance and inspections were completed.

Major safety related work included:

a ~

b.

c ~

d 1 1B Charcoal Filter Fan - Replace belts R-10A, ll/12 Rad Monitors Rebuilt Filter Covers Control Room Process Monitor (R-36, 37, 38)

P.M. Maint.

Snubber Inspection per M-40

j'\\

c ")

r I~

~

c-'

/

/////////////

szumz ijsPr/ cccccr

/////'//!I//I//I' ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TKLKPHONK ARLA COOK 7ld 546.2700 GINNA STATION April 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1989 Operating Status Information R.

E. Ginna Nuclear Power Plant.

Docket No. 50-244

Dear Sir:

Pursuant, to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1989.

Very truly yours, Robert C. Mecr dy General Manage Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1)

sC t

% 1

~ l~