( jiA~C.!i)
U,S.
NUCLEAR REGULATORY COMMISSION
REGION I
Report No.:
50-244/88-18
Licensee:
Rochester
Gas
and Electric Corporation
Docket No.:
50-244
Facility Name:
R.
E. Ginna Power Plant
Inspection
Conducted:
September
12-16,
1988
License
No.
Inspectors
A. Tillman
Physic
Se
ity Inspector,
Region II
C
.S'.
Sylvester,
Sr.
R actor Engineer,
Physical
Security
,Ir-r
-E8'ate
Signed
(< si aa
Date
S gned
Approved by:
R.
. Keimig,
Ch
eguards
Section
ivision of Radiation
S
ety and Safeguards
gr-y- 88
Date Signed
SUMMARY
Scope:
Resul ts:
This routine,
unannounced
inspection
was conducted
in the areas of:
security plan and implementing procedures;
management
effectiveness
security
program;
security
organization;
records
'and
reports;
security
program audit;
testing
and
maintenance;
locks,
keys
and
combinations;
physical barriers
protected
area;
physical barriers-
vital
areas;
security
system
power
supply;
lighting; compensatory
measures;
assessment
aids;
access
control
"
personnel;
access
control -
packages;
access
control
vehicles;
detection
aids
protected
area;
detection
aids - vital
areas;
alarm
stations;
communications;
personnel
training
and
qualification -
general
requirements;
safeguards
contingency plan implementation
review;
and
physical protection of safeguards
information.
In the
areas
inspected,
two violations of regulatory
requirements
were identified:
1.
Inadequate
procedure for testing intrusion detection
system;
and
2.
Inadequate 'vital area barriers.
ADGCK 050002
9
REPORT
DETAILS
1.
Persons
Contacted
Licensee
Employees
"R.
C. Mecredy,
General
Manager
Nuclear Production,
Rochester
Gas
and
Electric Corporation
(RGEE)
S,
M. Specter,
Superintendent,
R.
E. Ginna Nuclear Station,
(GNS)
- R. E. Wood, Supervisor,
Nuclear Security,
GNS
- M. J.
Fowler, Coordinator,
Nuclear Security Training,
GNS
"W. R. Borland, Electrical Engineer,
RGEE
Other
licensee
employees
contacted
during
this
inspection
included
engineers,
operators,
security
force
members,
technicians,
and
administrative personnel.
Other Organizations
R.
E.
Benne,
Major, Contract Security Supervisor,
The Wackenhut
Corporation
(TWC)
R.
C. Teed, Security Training Supervisor,
TWC
NRC Resident
Inspectors
C. Marschall,
Senior Resident
Inspector,
GNS
"N. Perry,
Resident
Inspector,
GNS
"Attended exit inter view
2.
Security Plan
and Implementing Procedures
(81018)
Review
and
observation
of security
force operational
activities during
the
course
of the
inspection
determined
that
adequate
implementing
procedures
had
been
provided
to
ensure
satisfactory
compliance
with
requirements
and
commitments
of the
Physical
Security
Plan,
except
as
noted in Section
7 of this report.
Review of the Physical
Security
Plan,
approved
through
change
No. 23,
revealed
that
changes
to
the
plan
submitted
in
accordance
with
do
not
decrease
the
effectiveness
of the security
program relative to plan commitments.
The
Safeguards
Contingency
Plan
was
included
as
Chapter
8 of the
Physical
Security Plan.
Procedures
were detailed
and clearly written, and provided
adequate
guidance for the security force except
as noted.
During the
course
of the
inspection it was
noted that several
of the
current
provisions
of the
Physical
Security
Plan
require
updating
to
comply with
new
or
revised
regulatory
requiremerits,
and
to clarify
existing
commitments.
Included
were:
retention
period
for security
records,
amount
of
ammunition
provided
armed
security
personnel;
definition of Protected
Area Barrier at the primary access
portal,
and
compensatory
protection
provided
by defensive
positions
for assessment
degradations
on
the
protected
area
perimeter.
The
licensee
agreed
to
initiate the
necessary
changes
to the Physical
Security Plan in the next
scheduled
revision to be submitted in December
1988.
No violations of regulatory requirements
were identified in this area.
Management
Effectiveness
Security Program (81020)
Review of Security
Program functions
and observation
of security opera-
tional activities
revealed
that the
program
was effectively managed
and
that security
resources
were
being utilized
in
an efficient
manner.
The established
management
program
provided for development,
revision,
implementation
and
enforcement
of
physical
protection
procedures.
Licensee
management
demonstrated
an awareness
of, and supportive attitude
toward, physical protection requirements.
Based
on
observations
during
the
course
of the
inspection,
review of
security
related
documentation
and
assessment
of security
personnel
performance, it was determined
that the security
force is
managed
and
supervised
in accordance
with the Physical Security
Plan
and is capable of
providing an acceptable
level of security protection for the protected
and
vital areas
and security related
equipment.
No violations of regulatory requirements
were identified in this area.
Security Organization
(81022)
Review of security
operational
activities
and discussion
with security
management
personnel
revealed
that the
Ginna
Physical
Security organi-
zation
consisted
of
a proprietary
security
management
function
and
a
contract security force provided by the Wackenhut Corporation.
Security
personnel
contacted
appeared
to
be
knowledgeable
of security
duties
and
an acceptable
level of shift supervision
was provided.
Each
shift observed
during the inspection
was adequately
manned
to meet
the
security
plan
commitments.
Attitudes
and
performance
of
security
personnel
observed
during the inspection
were positive
and demonstrated
the capability to provide
an acceptable
level of protection for the plant
vital resources.
No violations of regulatory requirements
were identified in this area.
r~
~
5.
Security Program Audit (81034)
Review of security
records,
related
documentation,
and available audit
reports verified that the licensee
had established
a program for auditing
the security organization to assure
continued effectiveness.
The Physical
Security
Plan
commits to auditing the security program
a minimum of once
each
12 months by personnel
that are independent
of both security manage-
ment and supervision.
/
The
most
recent
audit of the
security
program
was
conducted
by the
licensee's
guality Assurance
staff during
the
period of August 16-19,
1988.
The
audit
report
concluded
that
security activities at
Ginna
station
are
effective
and
conducted
in
accordance
with established
requirements.
The report (No. 88-35) further reflected that
no deficien-
cies warranting issuance
of a request
for corrective action were noted.
A
previous audit,
Report
No. 87-45,
conducted
August 26-27,
1987, contained
similar comments with no deficiencies
noted.
No violations of regulatory requirements
were identified in this area.
6.
Records
and Reports
(81038)
Review of licensee
records
and related
documentation
and discussion
with
security
personnel
verified that
the licensee
documented
and maintained
records of security related activities
and occurrences
in accordance
with
commitments
and requirements
contained
in the Physical Security Plan
and
Training
and gualification
Plan.
Records
reviewed
were
detailed
and
complete
and reflected
review by security
management.
Physical
Security
Event
Logs for the
period of April-June
1988 reflected
a total
of
24
logged events.
Nineteen
events
were logged for the period July 1, through
September
12,
1988.
The
licensee
had
not
experienced
any
1-hour
reportable gtysical Security Events during the two periods
referenced.
. ~ '.. '.,
~
No violations'f r'eg81atory
requirements
were identi fied in thi s area.
7.
Testing
and Maintenance
(81042)
One violation of regulatory requirements
was identified in this area.
Oiscussion with security management
and maintenance
personnel
and observa-
tion of testing
and
repair activities
confirmed that
the
licensee
is
committed
to maintaining
security
systems
and
equipment
in operable
condition.
Operability. of the security
system
appeared
to be enhanced
by
the availability of dedicated
Instrument
and Calibration (ILC) technicians.
Observation
of licensee-conducted
tests
of randomly selected
components
of the protected
and vital
area
intrusion detection
system
and
other
security
systems
and
equipment
confirmed operability of all
systems
and
exponents,
with the following exceptions.
S
l
i~ .I
~ Aqt
i
l'!
~ ~f~
]
~ ..'!" '
W .<<,.
'
'"
~~:
,. !'$
> y,q
~ ~
requires
that
each
intrusion
alarm" be
tested
for
performance
at the beginning
and
end of any period that it is used for
security. If the period of continuous
use is longer than
seven days, the
intrusion
alarm shall
also
be tested
at least
once every
seven (7) days.
Section 3.1.4 of the Physical
Security Plan,
Intrusion Detection Hardware,
states
that
the
system
has
been
designed
to conform with the criteria
delineated
in
Regulatory
Guide 5.44,
dated
June
1976,
10 CFR 73. 55(e) (1)(2) and
GSA Spec.
WA-00450B.
~!gp +p
~)t ..
s
~ I A+%)~PI P+ ~ ~.!'1
$., ~,
.-:=" .. -:.':-
-: ~
.< "
g
$
IQ)
~
~ )
~4'
~
4't ..
<~
'I ~
Failure to provide
an adequate
procedure for testing intrusion alarms for
conformance with commitments of the Physical
Security Plan is a violation
of regulatory requirements
(50-244/88-18-01).
8.
Locks,
Keys and Combinations
(81046)
Discussion with the Security
Manager
responsible
for the security locks,
keys
and combination
program
and review of lock and
key control records
confirmed that the licensee
had established
a program to provide positive
control of security locks and keys.
The most recent lock core
and
key change
out was accomplished
December
1,
1987.
Keys are inventoried
each security shift tour.
S
i
No violations of regulatory requirements
were identified in thi s area.
9.
Physical
Barr iers - Protected
Area (81052)
Tours of the protected
area during day and night hours confirmed that the
protected
area
perimeter
and associated
isolation
zones
were established
and maintained
in accordance
with commitments
in the
Physical
Security
Plan.
The perimeter
was clearly defined,
except
as noted below, isolation zones
were free of obstructions, with the exception of those identified in the
security plan,
and the perimeter
fencing
and gates
were in a good state
of repair.
I
~ ~
1
~
~ rC
~
~
~ \\)
No violations of regulatory requirements, were identified in this area.
10.
Physical Barriers - Yital Areas
(81054)
One violation of regulatory requirements
was identified in this area.
Tours
of the
protected
area
and
several
of the designated
vital areas
confirmed
that vital
area
barriers
had
been
established
and
were
maintained
in accordance
with commitments
of the Physical Security Plan,
with the following exception.
'f..<<.<<:
<<": ':":. '." "',<<( ..',".-: g,;,.
~ 'r\\
S
requires that the licensee
locate vital equipment only
within a vital area,
which in turn,
shall
be
located within a protected
area
such
that
access
to vital
equipment
requires
passage
through
at
least
two
physical
barriers
of sufficient
strength
to
meet
the
performance
requirements
of paragraph
(a) of this section.
~ll ~
f $ f4g '
~ 1 3'l Q g ~
~
os
Y'ri
4t
Failure
to
provide
equivalent
protection
for penetrations
in vital
barri ers i s
a violation of regulatory
requirements
(50-244/88-18-02)
.
11
~
Security
System
Power Supply (81058)
Discussion with security management
and review of security
and maintenance
related
documentation
determined
that
backup
power
for all
security
systems
is provided by a dedicated
security diesel
generator
located in a
vital area.
The diesel
generator
is load tested at 31-day intervals.
No deficiencies
in operation or testing frequency were noted.
No violations of regulatory requirements
were identified in this area.
S
l2.
Lighting (81062)
Tours of the protected
area
during the hours of dar kness verified that
adequate
lighting had
been
provided within the
protected
area
to meet
illumination requirements
for 'the protected
area
and perimeter isolation
zones
as committed to in the Physical Security Plan.
Lighting equipment consisted of permanent
high mast .lighting fixtures and
flood lighting installed
on buildings
and
in congested
areas.
Mobile
trailers
and temporary structures
were either underpenned
or were provided
with temporary lighting.
Security patrols
monitor lighting levels
on
a
nightly basis.
No violations of regulatory requirements
were identified in this area.
13.
Compensatory
Neasures
(81064)
Review of the
Physical
Security
Plan
and
Implementing
Procedures
and
discussion
with security
management
confirmed
that
the
licensee
has
developed
and
employs
compensatory
measures,
including
equipment,
additional
security
personnel,
and
specified
procedures
to ensure
that
the effectiveness
of the security
system is not
reduced
by failure or
other
contingencies
affecting
the
operation
of safety-related
systems,
equipment,
or
structures'ecurity
personnel
observed
in the
performance
of compensatory
duties
were
knowledgeable
of the duties
being
performed
and
related
security
response
requirements.
No violations of regulatory requirements
were identified in this area.
14.
Assessment
Aids (81066)
Tours
of the
protected
area,
review of the Physical
Security
Plan
and
1mplementing
Procedures,
and discussion with security
management
personnel
confirmed that the licensee
had established
a means of assessing
protected
area
and vital area intrusion detection
alarms.
S
No violations of regulatory requirements
were identified in this area.
15.
Access Control,- Personnel
(Sl070)
Observations
of personnel
access
control activities at the Primary Access
Portal
during the period of the inspection
determined
that the licensee
was controlling access
to the
protected
and vital areas
in accordance
with commitments in the Physical
Security Plan.
V
~ 0 ~
%
~ ~
">0 lblr t i ~.
~
4 jf;[~l pl
C
t
The licensee
had established
compensatory
measures
to be
implemen'ted
in
the event of access
control equipment degradation
or failure.
No violations of regulatory requirements
were identified in this area.
16.
Access
Control-Packages
(81072)
Observation
of access
control activities at
the
primary
access
portal
during the period of the inspection
confirmed that
packages
and
hand-
carried
items
were
searched
prior to being permitted into the protected
area.
All hand-carried
items were routinely searched
by X-ray scanning
equipment monitored by dedicated
security personnel.
Review of documentation
and procedures,
observation
of licensee
conducted
tests of detection
equipment,
and discussion with members of the security
force
determined
that
special
purpose
detection
equipment utilized for
search activities was tested
and maintained
in an operable condition.
The
licensee
had developed
and
employs
compensatory
measures
in the event of
equipment degradation
or failure.
No violations of regulatory requirements
were identified in this area.
8
17.
Access Control - Vehicles (81074)
Observation
of vehicle
access
control activities at the primary vehicle
access
gate to the protected
area
determined
that all vehicles,
except
under
emergency
conditions,
are
searched
for firearms,
explosives,
and
incendiary devices prior to being granted
access
to the protected
area.
The cab,
engine
compartment,
cargo area,
and undercarriage
are routinely
searched
by the security
force.
All vehicles
entkriag
the
protected
area,
with the exception of designated
vehicles,
are
escheated
by
a member
of the security force.
Unattended
vehicles
observed within the protected
area
were either secured,
or were under control of the security force.
No violations of regulatory requirements
were identified in this area.
18. Detection Aids - Protected
Area (81078)
Tours of the protected
area
and observation
of licensee
conducted
tests
of randomly selected
intrusion alarm components verified that the licensee
had established
an intrusion detection capability for the protected
area
perimeter in accordance
with commitments
in the Physical
Security Plan.
No violations of regulatory
requirements
were identified in this area,
with the exception of the
one addressed
in Paragraph
7.
19.
Detection Aids - Yital Areas (81080)
Tours of the Ginna Nuclear Station vital areas
and observation of licensee
conducted
testing
of
randomly
selected
intrusion
alarm
components
installed
on vital area
portals verified that
access
to the vital areas
was controlled in accordance
with comm'itments
in the
Physical
Security
Plan,
except
as noted in Section
10 of this report.
yp'f ~t\\ th 5 W >
l >(i > I ~s4,.
~
~
s
%1
1 ~
8
10
No deficiencies
were noted dur ing licensee testing of vital area detection
equipment.
No violations of regulatory requirements
were identified in this area.
20.
Alarm Stations
(81084)
Tours of the Ginna Nuclear Station security facilities confirmed that the
licensee
maintains
Central, and
Secondary
alarm
stati.ons
in accordance
with commitments of the Physical
Security Plan.
No violations of regulatory requirements
were identified in this area.
21.
Communications
(81088)
Observation
of securi
The ability of the alarm stations
to communicate with the security force
effectively and maintain radio discipline during
response
activities
was
demonstrated
during
a licensee
conducted
response drill on the evening of
September
14,
1988.
The
inspectors
observed
communications
tests
conducted
by the
Central
Alarm Station
with the, local
law enforcement
agency
via radio
and
telephone.
No violations of regulatory requirements
were identified in this area.
22.
Personnel
Training and gualification - General
Requirements
(81501)
Review of the
licensee's
Training
and gualification Plan,
Revision
1,
dated April 23,
1981,
training
records
and
related
documentation,
and
discussion with the Wackenhut Security Training Staff confirmed that the
Security Training Program
had been fully implemented
and required training
and re-qualification
was current.
Training records
were detailed
and well
documented.
Training
requirements
had
been
computerized
for tracking
purposes
which appeared
to be
an effective
means
of maintaining training
ty force operational
activities
and discussion
with
security
personnel
verified that
the
security
force
was
provided with
adequate
communications
equipment
and capability to maintain communication
with all on-duty personnel
and off-site Law Enforcement Agencies.
8
11
requirements
current.
The computerized listing of training requirements
was
randomly cross-referenced
with several
individual training records,
all of which were found to be accurate
and current.
Observation
of requalification training
being
provided
to
members
of
the
security
force, their participation
in
an
armed
response
drill,
and
observations
and
interviews of security
personnel
involved in the
performance
of security duties
confirmed the effectiveness
and
adequacy
of the security training program.
23.
No violations of regulatory requirements
were identified in this area.
Safeguards
Contingency
Plan Implementation
Review (81601)
Review of the licensee's
Safeguards
Contingency Plan,
included
as Chapter
8
of the Physical
Security Plan,
and Implementing Procedures
confirmed that
the plan
had
been fully implemented.
It was
noted that
29 .individual
security
events
were defined
in the Contingency
Plan,
each of which was
addressed
by an Implementing Procedure.
Documentation
reflected that liaison
had
been
established
and
was
being
maintained with local, State
and other
Law Enforcement
Agencies
represented
in the surrounding
area.
The established
liaison was further verified by
attendance
at
the
Annual
Local
Law Enforcement
(LLEA) orientation
and
briefing presented
on-site
September
14,
1988.
Federal,
State,
and local
agencies
were in attendance.
The
Security
Force
demonstrated
the ability to
respond
effectively to
unauthorized
intrusion to the protected
area
during
a security
response
drill conducted
during
nonregular
hours
on
September
14,
1988.
The
pre-drill briefing, tactical
deployment,
and operational
control of the
armed
response
force were effectively demonstrated
and
no deficiencies
were noted.
24.
No violations of regulatory requirements
were identified in this area.
Physical
Protection of Safeguards
Information (81810)
Discussion
with security
management
personnel
and review of procedures
and related documentation
confirmed that the licensee
had implemented
and
maintains
a
program for the protection
of Safeguards
Information that
includes
proper identification, monitoring,
storage
and destruction
of
the information
and material.
The
program is administered
in accordance
with Ginna Security Procedure
No. GS-1.0, Classification
and Distribution
of Security Information, dated
December
16,
1981.
A combination of
GSA approved
safes
and lock bar cabinets
are utilized
for storage
of the
licensee's
Safeguards
Information.
Destruction
of
material is routinely accomplished
by shredding.
No violations of regulatory requirements
were identified in this area.
S
12
25.
Exit Interview
The inspection
scope
and results
were
summarized
on September
16,
1988,
with those
persons
indicated in paragraph
1.
The inspectors
described
the
areas
inspected
and
discussed
in detail
the
inspection
results
listed
below.
The
licensee
was
informed that
two potential
violations of regulatory
requirements,
relating to adequacy of procedures
and vital area barriers,
were identified.
No written materials
were provided to the licensee
during the inspection.